CN203241734U - Control cabinet with two control systems for use and one for standby for steel mill production - Google Patents

Control cabinet with two control systems for use and one for standby for steel mill production Download PDF

Info

Publication number
CN203241734U
CN203241734U CN 201320127343 CN201320127343U CN203241734U CN 203241734 U CN203241734 U CN 203241734U CN 201320127343 CN201320127343 CN 201320127343 CN 201320127343 U CN201320127343 U CN 201320127343U CN 203241734 U CN203241734 U CN 203241734U
Authority
CN
China
Prior art keywords
contactor
switch board
controller
control cabinet
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320127343
Other languages
Chinese (zh)
Inventor
郑进
江建青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU ZHONGJIN ELECTRIC TECHNOLOGY Co Ltd
Original Assignee
SUZHOU ZHONGJIN ELECTRIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU ZHONGJIN ELECTRIC TECHNOLOGY Co Ltd filed Critical SUZHOU ZHONGJIN ELECTRIC TECHNOLOGY Co Ltd
Priority to CN 201320127343 priority Critical patent/CN203241734U/en
Application granted granted Critical
Publication of CN203241734U publication Critical patent/CN203241734U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Feedback Control In General (AREA)

Abstract

The utility model discloses a control cabinet with two control systems for use and one for standby for steel mill production, which is mainly composed of a first control cabinet, a second control cabinet and an instrument cabinet arranged in order. The first control cabinet is provided with a controller. The first controller is connected with a first inverter. The first inverter is connected to the first contactor and a second contactor. The second control cabinet is provided with a second controller. The second controller is connected to the second inverter. The second inverter is connected to a third contactor and a fourth contactor. The first contactor is connected to a pump A. The fourth contactor is connected to a pump C. The second contactor is connected to the third contactor and then connected to a pump B. The control cabinet is simple in structure, uses two control systems and two inverters to control three devices, and is improved in efficiency of the control cabinet and reduced in costs.

Description

A kind of dual-purpose one standby switch board for steel mill's production
Technical field
The utility model belongs to the electrical control field, is specifically related to a kind of dual-purpose one standby switch board for steel mill's production.
Background technology
At present, production line in steel plant is quantity-produced, equipment is all to be common apparatus usually, in order to guarantee continuous production, machinery and equipment all can have stand-by equipment, and every equipment is joined a cover control system, if three complete equipments are arranged, then need three cover control system, variable frequency control also needs three cover frequency converters, has strengthened the production cost of steel plant.
The utility model content
In order to solve the technical deficiency of above-mentioned existence, the utility model provides a kind of dual-purpose one standby switch board for steel mill's production, use two cover control system, two cover frequency converters just can control respectively three equipment, improved the service efficiency of switch board, provide cost savings.
For realizing above-mentioned technical purpose, reach above-mentioned technique effect, the utility model is achieved through the following technical solutions:
A kind of dual-purpose one standby switch board for steel mill's production, mainly formed by the first switch board that is arranged in order setting, the second switch board and instrument cabinet, be provided with the first controller in described the first switch board, described the first controller connects the first frequency converter, described the first frequency converter is connected with the first contactor and the second contactor, be provided with second controller in described the second switch board, described second controller connects the second frequency converter, and described the second frequency converter is connected with the 3rd contactor and the 4th contactor; Described the first contactor connects the A water pump, and described the 4th contactor connects the C water pump, is connected with the B water pump after described the second contactor is connected with described the 3rd contactor.
Further, be provided with the instrument that several are used for showing described switch board in the described instrument cabinet.
The beneficial effects of the utility model are as follows:
The utility model is simple in structure, uses two cover control system, two cover frequency converters just can control respectively three equipment, has improved the service efficiency of switch board, provides cost savings.
Above-mentioned explanation only is the general introduction of technical solutions of the utility model, for can clearer understanding technological means of the present utility model, and can be implemented according to the content of instructions, below with preferred embodiment of the present utility model and cooperate accompanying drawing to be described in detail as follows.Embodiment of the present utility model is provided in detail by following examples and accompanying drawing thereof.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present utility model, consists of the application's a part, and illustrative examples of the present utility model and explanation thereof are used for explaining the utility model, do not consist of improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is structural representation of the present utility model.
Number in the figure explanation: 1, the first switch board; 2, the second switch board; 3, instrument cabinet; 4, the first frequency converter; 5, the second frequency converter; 6, the first contactor; 7, the second contactor; 8, the 3rd contactor; 9, the 4th contactor; 10, A pump; 11, B pump; 12, C pump; 13, instrument; 14, the first controller; 15, second controller.
Embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, describe the utility model in detail.
Referring to shown in Figure 1, a kind of dual-purpose one standby switch board for steel mill's production, mainly formed by the first switch board 1 that is arranged in order setting, the second switch board 2 and instrument cabinet 3, be provided with the first controller 14 in described the first switch board 1, described the first controller 14 connects the first frequency converter 4, described the first frequency converter 4 is connected with the first contactor 6 and the second contactor 7, be provided with second controller 15 in described the second switch board 2, described second controller 15 connects the second frequency converter 5, and described the second frequency converter 5 is connected with the 3rd contactor 8 and the 4th contactor 9; Described the first contactor 6 connects A water pump 10, and described the 4th contactor 9 connects C water pump 12, is connected with B water pump 11 after described the second contactor 7 is connected with described the 3rd contactor 8.
Further, be provided with the instrument 13 that several are used for showing described switch board in the described instrument cabinet 3.
Further, pump must cut out all pumps and stops when switching, and can restart after the switching again.
The above is preferred embodiment of the present utility model only, is not limited to the utility model, and for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (2)

1. one kind is used for the dual-purpose one standby switch board that steel mill produces, main by the first switch board (1) that is arranged in order setting, the second switch board (2) and instrument cabinet (3) form, it is characterized in that: be provided with the first controller (14) in described the first switch board (1), described the first controller (14) connects the first frequency converter (4), described the first frequency converter (4) is connected with the first contactor (6) and the second contactor (7), be provided with second controller (15) in described the second switch board (2), described second controller (15) connects the second frequency converter (5), and described the second frequency converter (5) is connected with the 3rd contactor (8) and the 4th contactor (9); Described the first contactor (6) connects A water pump (10), and described the 4th contactor (9) connects C water pump (12), is connected with B water pump (11) after described the second contactor (7) is connected with described the 3rd contactor (8).
2. the dual-purpose one standby switch board for steel mill's production according to claim 1 is characterized in that: be provided with the instrument (13) that several are used for showing described switch board in the described instrument cabinet (3).
CN 201320127343 2013-03-20 2013-03-20 Control cabinet with two control systems for use and one for standby for steel mill production Expired - Fee Related CN203241734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320127343 CN203241734U (en) 2013-03-20 2013-03-20 Control cabinet with two control systems for use and one for standby for steel mill production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320127343 CN203241734U (en) 2013-03-20 2013-03-20 Control cabinet with two control systems for use and one for standby for steel mill production

Publications (1)

Publication Number Publication Date
CN203241734U true CN203241734U (en) 2013-10-16

Family

ID=49319009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320127343 Expired - Fee Related CN203241734U (en) 2013-03-20 2013-03-20 Control cabinet with two control systems for use and one for standby for steel mill production

Country Status (1)

Country Link
CN (1) CN203241734U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104569644A (en) * 2013-10-22 2015-04-29 国家电网公司 Test system and test control device thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104569644A (en) * 2013-10-22 2015-04-29 国家电网公司 Test system and test control device thereof

Similar Documents

Publication Publication Date Title
CN203241734U (en) Control cabinet with two control systems for use and one for standby for steel mill production
CN203747256U (en) 220 kV double-bus single-segment breaker single-row arranged arrangement structure
CN203312705U (en) Tool for replacing linear insulator
CN203457058U (en) Common-bus frequency converter system
CN204334402U (en) Motor local compensation energy saver
CN204089578U (en) A kind of continuous electric commutation circuit of alternating current-direct current of integrated power supply
CN203820216U (en) Electric cabinet for frequency conversion elevator
CN203787789U (en) T and pi mixed net rack wiring structure applied to high voltage distribution
CN204258326U (en) A kind of photovoltaic generating system
CN202707443U (en) A variable frequency slurry circulation pump provided with a bypass circuit
CN105634116A (en) T
CN204067924U (en) A kind of box-type substation
CN204065247U (en) A kind of multi-functional load prior-warning device
CN203933372U (en) High voltage transducer power unit shunting device
CN204696534U (en) Drawer unit interlock
CN202917816U (en) Simple PLC cabinet
CN202565171U (en) Novel frequency converter equipped with power frequency by-pass
CN204011157U (en) A kind of sensitive switch mechanism of automatic change-over
CN202976690U (en) Nameplate for electrical equipment maintenance
CN202475026U (en) Infinitely extendable integrated power monitoring system
CN204012216U (en) A kind of bus bridge frame of high-tension switch cabinet
CN202856444U (en) Automatic switching device of photovoltaic grid-connected inverter internal/external power supply
CN203645330U (en) Wiring structure with two groups of direct current filters in parallel in ultra-high voltage converter station
CN203014392U (en) A high-voltage DC power transmission wire connecting structure
CN204538497U (en) Electrical secondary equipment inking device is used at a kind of station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20180320

CF01 Termination of patent right due to non-payment of annual fee