CN203239356U - Supporting and protecting device applied to deep development roadway - Google Patents

Supporting and protecting device applied to deep development roadway Download PDF

Info

Publication number
CN203239356U
CN203239356U CN 201320121308 CN201320121308U CN203239356U CN 203239356 U CN203239356 U CN 203239356U CN 201320121308 CN201320121308 CN 201320121308 CN 201320121308 U CN201320121308 U CN 201320121308U CN 203239356 U CN203239356 U CN 203239356U
Authority
CN
China
Prior art keywords
tunnel
relieving achor
achor bar
strength high
stress pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320121308
Other languages
Chinese (zh)
Inventor
高法民
张斌
王亚杰
李廷文
付英涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FEICHENG MINING GROUP LIANGBAOSI ENERGY Co Ltd
Original Assignee
FEICHENG MINING GROUP LIANGBAOSI ENERGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FEICHENG MINING GROUP LIANGBAOSI ENERGY Co Ltd filed Critical FEICHENG MINING GROUP LIANGBAOSI ENERGY Co Ltd
Priority to CN 201320121308 priority Critical patent/CN203239356U/en
Application granted granted Critical
Publication of CN203239356U publication Critical patent/CN203239356U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A supporting and protecting device applied to a deep development roadway comprises high-strength high-prestress yielding anchor rods (1), a truss (2) and a nest anchor cable (3), wherein the high-strength high-prestress yielding anchor rods (1) and the nest anchor cable (3) are arranged at the top of the roadway, a plurality of high-strength high-prestress yielding anchor rods (1) are provided, and the truss (2) is fixed at the top of the roadway through the high-strength high-prestress yielding anchor rods (1). Therefore, the requirement for supporting and protecting the deep development roadway is met.

Description

The suspension device that is used for the deep mining tunnel
One, technical field
The utility model relates to a kind of suspension device for the deep mining tunnel, and especially a kind of adaptation is used for the suspension device in seam mining tunnel, deep.
Two, background technology
In mining, need the tunnel as communicating passage or production face, in order to guarantee the safety in tunnel, need to install suspension device and carry out roadway support, therefore suspension device is an important mine safety facility, in existing suspension device, all be the roadway support of carrying out for the superficial part development of resources.When deep resource is developed, because deep tunnel exists high-ground stress, high tectonic stress, high impact forces etc., after digging into, the tunnel is easy to produce crimp, exploitation of coal resources every year, the speed about with 20m shifted to the deep, minable superficial part coal is fewer and feweri, now progressively develop over against deepen coal resource, also do not have a kind of suspension device that is applicable to the deep mining tunnel at present.
Three, summary of the invention
In order to overcome above-mentioned technical disadvantages, the purpose of this utility model provides a kind of suspension device for the deep mining tunnel, adapts to the requirement of deep mining roadway support.
For achieving the above object, the technical scheme that the utility model is taked is: include high-strength high pre-stress pressure-relieving achor bar, truss and nest type anchor cable, be provided with high-strength high pre-stress pressure-relieving achor bar and nest type anchor cable at the top in tunnel, high-strength high pre-stress pressure-relieving achor bar is arranged as many, and truss is fixed on the top in tunnel by high-strength high pre-stress pressure-relieving achor bar.
At first by high-strength high pre-stress pressure-relieving achor bar and nest type anchor cable the top, tunnel is fixed, prevent that the top, tunnel from the generation of the phenomenon such as slippage inbreak occuring, re-use the top that a high-strength high pre-stress pressure-relieving achor bar is fixed on truss in the tunnel, play the effect of auxiliary shoring, owing to designed high-strength high pre-stress pressure-relieving achor bar, truss and nest type anchor cable, two step formula supportings have been carried out in the tunnel, by high-strength high pre-stress pressure-relieving achor bar and nest type anchor cable one is formed on the top, tunnel, to adapt to the requirement of the high Ground control and support in deep mining tunnel, by high-strength high pre-stress pressure-relieving achor bar and truss, top, tunnel force-bearing of surrounding rock mass state is changed into compressive stress by tensile stress, form combination supporting.Adapt to the requirement of deep mining roadway support.
The utility model has designed, and also includes to allow pressure pipe, is provided with in the bottom of high-strength high pre-stress pressure-relieving achor bar to allow pressure pipe.
The utility model has designed, the diameter of high-strength high pre-stress pressure-relieving achor bar is set to Φ 18-24mm, the depth H that nest type anchor cable anchors into the top, tunnel is set to 8000-10000mm, the degree of depth h that high-strength high pre-stress pressure-relieving achor bar anchors into the top, tunnel is set to 2200-2400mm, and the distance L between the adjacent high-strength high pre-stress pressure-relieving achor bar is set to 800-1000mm.
The utility model has designed, and high-strength high pre-stress pressure-relieving achor bar and nest type anchor cable are set to be anchored at the top in tunnel.
The utility model has designed, and the termination, top of nest type anchor cable is set to the bird's nest shape.
Four, description of drawings
Accompanying drawing is the schematic diagram of first embodiment of the present utility model.
Five, the specific embodiment
Accompanying drawing is first embodiment of the present utility model, specify by reference to the accompanying drawings present embodiment, include high-strength high pre-stress pressure-relieving achor bar 1, truss 2 and nest type anchor cable 3, top layout in the tunnel has high-strength high pre-stress pressure-relieving achor bar 1 and nest type anchor cable 3, high-strength high pre-stress pressure-relieving achor bar 1 is arranged as five, nest type anchor cable 3 is arranged as 1, high-strength high pre-stress pressure-relieving achor bar 1 and nest type anchor cable 3 are anchored at the top in tunnel, and truss 2 is fixed on the top in tunnel by high-strength high pre-stress pressure-relieving achor bar 1.
In the present embodiment, the diameter of high-strength high pre-stress pressure-relieving achor bar 1 is set to Φ 18mm, the depth H that nest type anchor cable 3 anchors into the top, tunnel is set to 8000mm, the degree of depth h that high-strength high pre-stress pressure-relieving achor bar 1 anchors into the top, tunnel is set to 2200mm, and the distance L between the adjacent high-strength high pre-stress pressure-relieving achor bar 1 is set to 800mm.
In the present embodiment, the termination, top of nest type anchor cable 3 is designed to the bird's nest shape.
When using present embodiment, at first the top, tunnel is fixed with nest type anchor cable 3 by high-strength high pre-stress pressure-relieving achor bar 1, prevent that the top, tunnel from the generation of the phenomenon such as slippage inbreak occuring, re-use high-strength high pre-stress pressure-relieving achor bar 1 truss 2 is fixed on the top in tunnel, play the effect of auxiliary shoring.
In the present embodiment, the safe and effective supporting problem of deep, highland pressure, compound roof, moving aobvious Sub-Level Caving crossheading is the great research topic that solution is badly in need of in China always.Along with adopting dark increase, the problem that the down-hole exposes is day by day serious.The problem of ground pressure, ground temperature, impulsion pressure and gushing water has become the principal element of the normal safety in production of restriction mine.It is imperative to take practicable technical method to carry out deep mining, Surrounding Rock Control, roadway support and other diaster prevention and control technical research.The remarkable increase that deep mining is pressed because of ground can become uncontrollable or unmanageable country rock at the country rock controlled of superficial part, and traditional supporting theory and technical method are difficult to satisfy the requirement of deep tunnel Surrounding Rock Control.The utility model is on the basis that further investigation deep high-ground stress roadway surrounding rock " props up-control " and " control-allowing " concerns, research and development and successful Application " high-strength prestressed high-strength high pre-stress pressure-relieving achor bar+composite prestressed truss+nest type anchor cable " combination supporting system, effectively solved beam Bao Si colliery " moving aobvious the combining of deep-well compound roof put roadway support " problem, project has obtained breakthrough and significant effect in this field.Design first and optimized rationally " allow pressure point " and " allow press apart from " of Ф 20 * 2400mm anchor pole in the research.
Second embodiment of the present utility model, the diameter of high-strength high pre-stress pressure-relieving achor bar 1 is set to Φ 24mm, the depth H that nest type anchor cable 3 anchors into the top, tunnel is set to 10000mm, the degree of depth h that high-strength high pre-stress pressure-relieving achor bar 1 anchors into the top, tunnel is set to 2400mm, distance L between the adjacent high-strength high pre-stress pressure-relieving achor bar 1 is set to 1000mm, also include and allow pressure pipe, be provided with in the bottom of high-strength high pre-stress pressure-relieving achor bar and allow pressure pipe.
The 3rd embodiment of the present utility model, the diameter of high-strength high pre-stress pressure-relieving achor bar 1 is set to Φ 21mm, the depth H that nest type anchor cable 3 anchors into the top, tunnel is set to 9000mm, the degree of depth h that high-strength high pre-stress pressure-relieving achor bar 1 anchors into the top, tunnel is set to 2300mm, and the distance L between the adjacent high-strength high pre-stress pressure-relieving achor bar 1 is set to 900mm.
The 4th embodiment of the present utility model, the diameter of high-strength high pre-stress pressure-relieving achor bar 1 is set to Φ 20mm, the depth H that nest type anchor cable 3 anchors into the top, tunnel is set to 9500mm, the degree of depth h that high-strength high pre-stress pressure-relieving achor bar 1 anchors into the top, tunnel is set to 2350mm, and the distance L between the adjacent high-strength high pre-stress pressure-relieving achor bar 1 is set to 960mm.
The utlity model has following characteristics:
1, owing to designed high-strength high pre-stress pressure-relieving achor bar 1, truss 2 and nest type anchor cable 3, two step formula supportings have been carried out in the tunnel, at first one is formed on the top, tunnel by high-strength high pre-stress pressure-relieving achor bar 1, nest type anchor cable 3, the requirement of pressing with the highland that adapts to the deep layer tunnel, by high-strength high pre-stress pressure-relieving achor bar 1 and truss 2, top, tunnel force-bearing of surrounding rock mass state is changed into compressive stress by tensile stress, form combination supporting.Therefore be fit to the requirement of deep mining roadway support.
2, this support technology greatly reduces support cost, tunnel once supporting success, significantly improved driving speed, stopped repair of laneway, guaranteed the high-yield and high-efficiency safety in production of mine, and efficiently solve the supporting problem that Shandong accumulation in Juye Coalfield-deep-well highland presses aobvious Sub-Level Caving tunnel, have significant economic benefit and social benefit.
Within being used for the suspension device technical field in deep mining tunnel; Be provided with high-strength high pre-stress pressure-relieving achor bar 1 and nest type anchor cable 3 every including at the top in tunnel; high-strength high pre-stress pressure-relieving achor bar 1 is arranged as many, and truss 2 is fixed on the technology contents at top in tunnel all in protection domain of the present utility model by high-strength high pre-stress pressure-relieving achor bar 1.

Claims (5)

1. suspension device that is used for the deep mining tunnel; It is characterized in that: include high-strength high pre-stress pressure-relieving achor bar (1), truss (2) and nest type anchor cable (3), be provided with high-strength high pre-stress pressure-relieving achor bar (1) and nest type anchor cable (3) at the top in tunnel, high-strength high pre-stress pressure-relieving achor bar (1) is arranged as many, and truss (2) is fixed on the top in tunnel by high-strength high pre-stress pressure-relieving achor bar (1).
2. the suspension device for the deep mining tunnel according to claim 1; It is characterized in that: also include and allow pressure pipe, be provided with in the bottom of high-strength high pre-stress pressure-relieving achor bar (1) and allow pressure pipe.
3. the suspension device for the deep mining tunnel according to claim 1 and 2; It is characterized in that: the diameter of high-strength high pre-stress pressure-relieving achor bar (1) is set to Φ 18-24mm, the depth H that nest type anchor cable (3) anchors into the top, tunnel is set to 8000-10000mm, the degree of depth h that high-strength high pre-stress pressure-relieving achor bar (1) anchors into the top, tunnel is set to 2200-2400mm, and the distance L between the adjacent high-strength high pre-stress pressure-relieving achor bar (1) is set to 800-1000mm.
4. the suspension device for the deep mining tunnel according to claim 1 and 2; It is characterized in that: high-strength high pre-stress pressure-relieving achor bar (1) and nest type anchor cable (3) are set to be anchored at the top in tunnel.
5. the suspension device for the deep mining tunnel according to claim 1 and 2; It is characterized in that: the termination, top of nest type anchor cable (3) is set to the bird's nest shape.
CN 201320121308 2013-03-18 2013-03-18 Supporting and protecting device applied to deep development roadway Expired - Fee Related CN203239356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320121308 CN203239356U (en) 2013-03-18 2013-03-18 Supporting and protecting device applied to deep development roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320121308 CN203239356U (en) 2013-03-18 2013-03-18 Supporting and protecting device applied to deep development roadway

Publications (1)

Publication Number Publication Date
CN203239356U true CN203239356U (en) 2013-10-16

Family

ID=49316666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320121308 Expired - Fee Related CN203239356U (en) 2013-03-18 2013-03-18 Supporting and protecting device applied to deep development roadway

Country Status (1)

Country Link
CN (1) CN203239356U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332722A (en) * 2015-11-29 2016-02-17 辽宁工程技术大学 Coal mine rock burst timbering device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332722A (en) * 2015-11-29 2016-02-17 辽宁工程技术大学 Coal mine rock burst timbering device

Similar Documents

Publication Publication Date Title
CN202064981U (en) Soft coal layer roadway supporting structure
CN102966354B (en) Non-pillar mining method for hard roof coal wall of thick coal seam
CN101761338B (en) Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed
CN103244122B (en) Trinity coupling support stability control method for gob-side entry-driving coal pillar
CN102296976B (en) Asymmetrical bolt-net-cable combined supporting method for special-shaped recovery tunnel of large inclination angle coal bed
CN103899329B (en) A kind of administering method of large deformation breaking surrounding rock tunnel
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN103233748A (en) Anchor mesh cable column combined supporting design method for expanding extra-large span open-off cut brush into lane
CN106523003A (en) Rigid-flexible coupling energy absorbing support technology suitable for deep mining roadway
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
CN102733836A (en) Roadway support method for fully mechanized caving mining of weak extra-thick coal seam
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN204532363U (en) The built-up arch suspension device in tunnel
CN103967505A (en) Coal mine underground isolated soft rock mass supporting device used in dynamic pressure environment
CN202731991U (en) Test model for banded filling, replacement and mining of fault protective coal pillar
CN103527199B (en) A kind of island working face thin coal pillar gob side entry driving surrouding rock deformation control method
CN203847127U (en) Device for supporting soft rock masses at roadway intersections in coal mine under dynamic pressure environment
CN102155248B (en) Method for supporting laneway below coal pillar
CN203239356U (en) Supporting and protecting device applied to deep development roadway
CN205778957U (en) A kind of delayed section of support system of workings subject to dy namic pressure
CN104790991A (en) Mining roadway surrounding rock strong and long top anchoring technology
CN107956481A (en) A kind of suspension device for superelevation tunnel gob side entry retaining
CN108316925B (en) Simple gob-side entry retaining method for drilling and roof breaking of working face with three-soft coal layer thickness direct roof
CN203847126U (en) Island soft rock roadway retaining and protecting device in underground dynamic pressure environment of coal mine
CN202736375U (en) Experimental model for filling, and displacing fault protection coal pillar in arch bridge type

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20140318