CN203229218U - Pitching steel wire rope stress balancing device for handling equipment - Google Patents

Pitching steel wire rope stress balancing device for handling equipment Download PDF

Info

Publication number
CN203229218U
CN203229218U CN 201320222694 CN201320222694U CN203229218U CN 203229218 U CN203229218 U CN 203229218U CN 201320222694 CN201320222694 CN 201320222694 CN 201320222694 U CN201320222694 U CN 201320222694U CN 203229218 U CN203229218 U CN 203229218U
Authority
CN
China
Prior art keywords
wire rope
steel wire
pitching
balance beam
handling equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320222694
Other languages
Chinese (zh)
Inventor
李钟�
马曙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU GONGLI HEAVY MACHINERY CO Ltd
Original Assignee
JIANGSU GONGLI HEAVY MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU GONGLI HEAVY MACHINERY CO Ltd filed Critical JIANGSU GONGLI HEAVY MACHINERY CO Ltd
Priority to CN 201320222694 priority Critical patent/CN203229218U/en
Application granted granted Critical
Publication of CN203229218U publication Critical patent/CN203229218U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to a pitching steel wire rope stress balancing device for handling equipment. The pitching steel wire rope stress balancing device for the handling equipment comprises a balance beam, steel wire rope fixing devices are hinged with two ends of the balance beam and are arranged at the center of the balance beam and are hinged with one end of a connecting base, the other end of the connecting base is hinged with a support of a main metal structure. The steel wire rope can be rotated around a rotating shaft through the balance beam when the stress is uneven, so that the tensile force on two sides of the steel wire rope is equal; when one side of steel wire rope is broken accidentally, the balance beam rotates around the rotating shaft again to enable one end of the balance beam with the broken steel wire rope to contact with the main metal structure, the balance beam is limited to move, the steel wire rope at the other end of the balance beam is connected with a pitching coiling block all the time, so that the cargo boom rack can be lifted up and accidents caused by cargo boom falling by the breaking of the steel wire rope are avoided.

Description

A kind of pitching steel rope stress balance device for handling equipment
Technical field
The utility model relates to the handling equipment field, relates in particular to a kind of pitching steel rope stress balance device for handling equipment.
Background technology
Along with China's economy constantly develops, the construction progress of harbour, power plant is advanced by leaps and bounds, and requires more and more higher for traditional ship unloaders, bucket-wheel stacker reclaimer, circular piling materials take-out.To produce and performance requriements in order satisfying, to need pitching winding system frequent movements such as ship unloaders, bucket-wheel stacker reclaimer, circular piling materials take-out, in general, the pitching winding system adopts following two kinds of forms mostly:
(1) as shown in Figure 1, adopt the version of steel cable as follows: an end of steel rope 101 is connected with the first pitching reel 102, other end order is through first running block 104, first deflection sheave 105, steel rope fixer 103, second deflection sheave 107, second running block 106, be connected with the second pitching reel 108 at last, adopt the version of steel cable after steel rope 101 tensionings, reinforcing by steel rope fixer 103, though both sides steel rope stressing conditions makes moderate progress, but it is inconsistent owing to both sides steel rope variation after use, discontinuity equalization, make and regulate the difficulty that becomes, change steel rope 101 more if desired simultaneously, need integral replacing, cost is big.
(2) as shown in Figure 2, adopt two construction of wire rope forms as follows: fag end one end of two steel ropes 101 is separately fixed on the first pitching reel 102 and the second pitching reel 108, the other end is fixed with main metal construction by first running block, 104 assembly pulleys, second running block 106 respectively, adopt two construction of wire rope forms, steel rope discontinuity equalization phenomenon is comparatively obvious, in operational process if the situation of steel rope discontinuity occurs, easily cause wire cable rupture, elevator boom rack is fallen, thus the potential safety hazard of causing.
The utility model content
The applicant has carried out research and has improved at above-mentioned existing issue, provides a kind of simple in structure, the pitching steel rope stress balance device that is used for handling equipment that Practical Performance is good.
The technical scheme that the utility model adopts is as follows:
A kind of pitching steel rope stress balance device for handling equipment comprises equalizing bar, the hinged wire rope fixing device in the two ends of equalizing bar, and an end that is positioned at the center of equalizing bar and Connection Block is hinged, and the other end of Connection Block and the bearing of main metal construction are hinged.
Its further technical scheme is:
Wire rope fixing device comprises the wedge joint hinged with the end of equalizing bar, and the other end of steel wire penetrating wedge joint is also fixed by a plurality of rope clamps;
In the both sides of Connection Block, be positioned at and go back the symmetrical mounting angle bar on the described equalizing bar;
Returning apparatus limiting device bearing on Connection Block installs limiting device on the described limiting device bearing.
The beneficial effects of the utility model are as follows:
By the utility model steel rope is rotated around the axis when the discontinuity by equalizing bar, realize that the both sides pull of steel wire equates, when beyond one side steel rope takes place, rupturing, by equalizing bar around the shaft rotation again, one end of the equalizing bar that has the steel rope that ruptures is contacted with main metal construction, the action again of limiting balance beam, and the steel rope of the equalizing bar other end is connected with the pitching reel all the time, thereby pulling elevator boom rack,, avoid invar silk fracture of rope that elevator boom rack is dropped and the safety misadventure that produces.
Description of drawings
Fig. 1 is the connection structure scheme drawing of existing steel cable and pitching reel.
Fig. 2 is the connection structure scheme drawing of existing two steel ropes and pitching reel.
Fig. 3 is the connection structure scheme drawing that has steel rope of the present utility model and pitching reel.
Fig. 4 is structural representation of the present utility model.
Fig. 5 is that Fig. 4 is along the sectional structure scheme drawing of A-A.
Fig. 6 is that Fig. 4 is along the sectional structure scheme drawing of B-B.
Fig. 7 is that Fig. 4 is along the sectional structure scheme drawing of C-C.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described.
As Fig. 3, Fig. 4 and shown in Figure 7, the utility model comprises equalizing bar 7, the hinged wire rope fixing device in the two ends of equalizing bar 7, wire rope fixing device is included in the two ends of equalizing bar 7, by the hinged wedge joint 9 of first turning cylinder 17, the other end of steel wire penetrating wedge joint 9 is also fixing by a plurality of rope clamps 8.(rope clamp 8 is 5 among Fig. 4, wherein draws signal with line of centers letter for 2).
As Fig. 4, shown in Figure 6, at the center of equalizing bar 7 through-going device second turning cylinder 18 and the first axis plate 16, realize that by second turning cylinder 18 equalizing bar 7 is in the rotation by a small margin of Connection Block 15 1 ends, as Fig. 4, shown in Figure 5, the other end of Connection Block 15 is also hinged with the bearing 14 of main metal construction by the 3rd turning cylinder 20, the second axis plate 11 and fastener 12, at the peripheral unit axle bush 13 of the 3rd turning cylinder 20, axle bush 13 is connected with Connection Block 15.
As Fig. 5, shown in Figure 6, on second turning cylinder 18 and the 3rd turning cylinder 20, all install oil nozzle 10, have oil duct 1801 in the inside of second turning cylinder 18, have oil duct 2001 in the inside of the 3rd turning cylinder 20, lubricating oil is injected in inside by 10 pairs of second turning cylinders 18 of oil nozzle and the 3rd turning cylinder 20, thereby realizes each rotating shaft lubricating when rotating.
As Fig. 4, shown in Figure 6, in the both sides of Connection Block 15, go back symmetrical mounting angle bar 21 at equalizing bar 7, as shown in Figure 6, returning apparatus limiting device bearing 22 on Connection Block 15, device limiting device 19 on the limiting device bearing 22.
Concrete working process of the present utility model is as follows:
As shown in Figure 3, Figure 4, an end fag end 601 of first steel rope 6 is fixing by the rope clamp 8 of equalizing bar 7 one ends, and the other end is connected with the first pitching reel 102 by first running block, 104 backs in proper order.One end fag end 501 of second steel rope 5 is also fixing by the rope clamp 8 of equalizing bar 7 other ends, the other end of second steel rope 5 is connected with the second pitching reel 108 by second running block 106 back, and the arrow of an end of first steel rope 6 and second steel rope 5 is represented the direction that is connected with the first pitching reel 102 and the second pitching reel 108 among Fig. 4.When first steel rope 6 and second steel rope 5 stressed inconsistent, rotates by a small margin by equalizing bar 7 rich second turning cylinders 18 this moment, thereby makes the pulling force of first steel rope 6 at equalizing bar 7 two ends and second steel rope 5 equal.
When if steel rope meets accident fracture on one side, because of equalizing bar 7 two ends stressed inconsistent, this moment, equalizing bar 7 turned an angle around second turning cylinder 18, angle bar 21 contacts with limiting device 19, by limiting device 19 to CPU feedback wire rope breakdown signal, the motor that drives the pitching reel stops action and stops the pitching reel being rotated further, equalizing bar 7 is when second turning cylinder 18 rotates simultaneously, one end of equalizing bar 7 contacts with the shock absorber (not shown in FIG.) of main metal construction, make equalizing bar 7 fixing again, the other end of equalizing bar 7 still tractive is lived pitching jib (not shown), in case the pitching jib falls to causing a serious accident.
The above-mentioned first pitching reel 102 and the second pitching reel 108 can be connected and form an integral body, and above-mentioned limiting device is the contact limiting device, and its structure and principle belong to existing known technology.
More than describing is to explanation of the present utility model, is not the restriction to utility model, and the utility model institute restricted portion is referring to claim, and under the situation of basic structure of the present utility model, the utility model can be done any type of modification.

Claims (4)

1. pitching steel rope stress balance device that is used for handling equipment, it is characterized in that: comprise equalizing bar (7), the hinged wire rope fixing device in two ends of described equalizing bar (7), an end that is positioned at the center of described equalizing bar (7) and Connection Block (15) is hinged, and the other end of Connection Block (15) and the bearing of main metal construction are hinged.
2. a kind of pitching steel rope stress balance device for handling equipment as claimed in claim 1, it is characterized in that: described wire rope fixing device comprises the wedge joint (9) hinged with the end of equalizing bar (7), and the other end of steel wire penetrating wedge joint (9) is also fixing by a plurality of rope clamps (8).
3. a kind of pitching steel rope stress balance device for handling equipment as claimed in claim 1, it is characterized in that: the both sides in described Connection Block (15) are positioned at and go back symmetrical mounting angle bar (21) on the described equalizing bar (7).
4. a kind of pitching steel rope stress balance device for handling equipment as claimed in claim 1 is characterized in that: in the last returning apparatus limiting device bearing (22) of described Connection Block (15), device limiting device (19) on the described limiting device bearing (22).
CN 201320222694 2013-04-27 2013-04-27 Pitching steel wire rope stress balancing device for handling equipment Expired - Fee Related CN203229218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320222694 CN203229218U (en) 2013-04-27 2013-04-27 Pitching steel wire rope stress balancing device for handling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320222694 CN203229218U (en) 2013-04-27 2013-04-27 Pitching steel wire rope stress balancing device for handling equipment

Publications (1)

Publication Number Publication Date
CN203229218U true CN203229218U (en) 2013-10-09

Family

ID=49285357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320222694 Expired - Fee Related CN203229218U (en) 2013-04-27 2013-04-27 Pitching steel wire rope stress balancing device for handling equipment

Country Status (1)

Country Link
CN (1) CN203229218U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103274227A (en) * 2013-04-27 2013-09-04 江苏工力重机有限公司 Pitching steel wire rope stress balancing device used for handling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103274227A (en) * 2013-04-27 2013-09-04 江苏工力重机有限公司 Pitching steel wire rope stress balancing device used for handling device

Similar Documents

Publication Publication Date Title
CN201321354Y (en) Telescopic arm crane and ratchet wheel locking device thereof
CN202415025U (en) Oscillating pulley system
CN103274227A (en) Pitching steel wire rope stress balancing device used for handling device
CN202296915U (en) Crane, super-lifting device and pre-tightening mechanism of super-lifting device
CN204847923U (en) Hoist anti -swing puts device
CN203229218U (en) Pitching steel wire rope stress balancing device for handling equipment
CN102351129B (en) Super-lifting device for improving lifting performance of crane and crane
CN105645275A (en) Cable hoisting crane and construction method thereof
CN104649120A (en) Balance hoisting equipment
CN103274301B (en) Protective device for driver's cage of bridge-type grab ship-unloader
CN202988609U (en) Diagonal bracing type derrick crane
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN205709528U (en) A kind of platform jack machinism
CN203319500U (en) Reinforcing cage abutting-joint adjusting device
CN202296698U (en) Rotatable flat-tail rope suspending device
CN203373729U (en) Dynamic-compactor lifting hook and dynamic compactor
CN103552919A (en) Crane hook moving device
CN203767902U (en) Hoisting crane structure of folding block of steel box girder of cable-stayed bridge
CN201817219U (en) Winding system of steel wire rope of grabbing tool of crane
CN203653125U (en) Hoister for tower crane hoisting
CN201864517U (en) Small-size member hoisting tool
CN107445064B (en) Balance pulley and pulley block of crane for hoisting molten metal
CN203229329U (en) Protection device for driver cab of bridge type grab ship unloader
CN203855102U (en) Belt conveyor tensioning device with lifting function
CN103663206A (en) Universal hydraulic crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131009

Termination date: 20190427