CN203227645U - Pipeline dredging device - Google Patents
Pipeline dredging device Download PDFInfo
- Publication number
- CN203227645U CN203227645U CN 201320206749 CN201320206749U CN203227645U CN 203227645 U CN203227645 U CN 203227645U CN 201320206749 CN201320206749 CN 201320206749 CN 201320206749 U CN201320206749 U CN 201320206749U CN 203227645 U CN203227645 U CN 203227645U
- Authority
- CN
- China
- Prior art keywords
- pipe
- blowpipe
- shaped pipe
- dredging device
- heat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a pipeline dredging device comprising a U-shaped pipe with two orifices. The center part of the center line of one orifice is provided with a round hole, the inside diameter of the round hole is smaller than the diameter of the orifices of the U-shaped pipe. A turning head blowpipe is inserted into the round hole in a clearance fit manner. A metal spiral blade is mounted on the head of the turning head blowpipe. The outside diameter of the blade is smaller than the outside diameter of the turning head blowpipe. A rubber hose is connected to the other end of the turning head blowpipe and is communicated with a compressed air source. The center distance between the two orifices of the U-shaped pipe matches with the center distance of adjacent heat exchange pipes, and the U-shaped pipe is in clearance fit with the adjacent heat exchange pipes. The pipeline dredging device is simple in structure and convenient to carry; time of maintaining the pipeline dredging device can be reduced effectively; equipment operation rate is increased.
Description
[technical field]
The utility model relates to the mechanical realization field, relates in particular to a kind of pipe dredging device.
[background technology]
In the prior art, Fu Kasi kiln body drives the wind-heat interchanger, and the installation site is vertical configuration.Dust-laden exhaust gas is sucked through the heat-exchange tube negative pressure by the discharging waste gas mouth in the kiln, and thermal conductance is in heat-exchange tube (109,4.5 meters of tube length, caliber 75mm) inner tubal wall.Drive the wind malleation and enter gap between the heat-exchange tube pipe, be heated after driving wind by the heat-exchange tube outer tube wall, discharge from heating rear drive air port as product and use.
Exhaust gas properties in the kiln:Drying, high temperature (between the 500-600 degree), dust-laden.
Operational characteristic:Continuous operation.
Working characteristics:The obstruction (Fig. 3) of luming easily of the axial interlude of heat-exchange tube inwall.
Because the upright level of dust unit is relatively big in the kiln, and high temperature drying, so the block that forms gradually in the pipe middle part becomes loose spot character, partly (Fig. 3) pipeline in case by footpath, block knot full packages road backward blocked state, above position, line clogging position is slowly crammed to the mouth of pipe by the moving high temperature dust of waste gas relaying afterflow, and the heat-exchange tube of being crammed loses thermal conduction effect.
The problem of bringing with it is heat-exchanger pipeline mediation cleaning difficulty.Though the piece of heat-exchange tube middle junction is loose spot, and loose spot also all is the high temperature dust that does not have bonding with the upper part, because tube wall is longer, the block part of luming is not usually at the mouth of pipe, and in the pipe middle part, the tube wall diameter only is 75 mm.Prior art is to dredge by force with metal bar, and ducted nothing bonding high temperature dust here similarly is " drift sand " that is subjected to vertical gravitation in the fixed volume, is subjected to the frictional force of tube wall, iron staff is more smash downwards, the density of these " drift sands " is just more big, and the resistance of smashing is also more big down, dredges very difficult.
Consequence:1, the mediation time long, mean that to stop kiln (stopping working) time also just more long, influence the longevity of the interior anti-material of Fu Kasi kiln kiln.
Be subjected to radial tension when 2, being dredged, heat-exchange tube tube wall easy deformation, even break, and the back of breaking repairs difficulty influences heat exchanger service life.
3, the human and material resources input is too big, owing to stop the long of kiln time, influences output simultaneously.
[summary of the invention]
At the shortcoming of prior art, the purpose of this utility model is to provide a kind of pipe dredging device simple in structure, portable.
The technical solution adopted in the utility model is: a kind of pipe dredging device, it is characterized in that: comprise one have the U-shaped pipe of two mouths of pipe, the center line centering place of a mouth of pipe opens a circular hole therein, this circular hole internal diameter is less than the U-shaped pipe mouth of pipe, revolving a blowpipe inserts this circular hole and becomes matched in clearance, the head that revolves a blowpipe is equipped with the metal spiral blade, the blade external diameter connects rubber hose less than revolving a blowpipe external diameter at the other end that revolves a blowpipe, communicates with compressed air source.
Further, two mouth of pipe centre-to-centre spacing of described U-shaped pipe and the centre-to-centre spacing of adjacent heat-exchange tube are coincide, and become matched in clearance.
The beneficial effects of the utility model are: simple in structure, be easy to carry, and can effectively reduce inspection and repair shop and use the time, improve the pipe dredging device of equipment operation rate.
[description of drawings]
The utility model will be further described below in conjunction with accompanying drawing.
Fig. 1 is the utility model structural representation;
Fig. 2 is that schematic diagram is implemented in the utility model mediation;
Fig. 3 is the heat exchanger schematic diagram;
1, rubber tube 2, circular hole 3, U-shaped pipe 4, revolve waste gas 11 in the blowpipe 5, helical blade 6, compressed air 7, dust 8, heat-exchange tube 19, heat-exchange tube 2 10, kiln, heat-exchange tube 12, drive wind 13, discharging waste gas 14, heating rear drive wind
[specific embodiment]
Referring to accompanying drawing, the utility model has adopted a kind of pipe dredging device, it is characterized in that: comprise one have the U-shaped pipe of two mouths of pipe, the center line centering place of a mouth of pipe opens a circular hole therein, this circular hole internal diameter is less than the U-shaped pipe mouth of pipe, revolve a blowpipe and insert this circular hole and become matched in clearance, the head that revolves a blowpipe is equipped with the metal spiral blade, and the blade external diameter is less than revolving a blowpipe external diameter, connect rubber hose at the other end that revolves a blowpipe, communicate with compressed air source.
Further, two mouth of pipe centre-to-centre spacing of described U-shaped pipe and the centre-to-centre spacing of adjacent heat-exchange tube are coincide, and become matched in clearance.
Because blocked pipeline is the section of tubing in the whole heat exchanger, so adjacent channel always has not blocked, so as shown in Figure 5, make a U-shaped pipe, two mouth of pipe centre-to-centre spacing of U-shaped pipe and the centre-to-centre spacing of adjacent heat-exchange tube are coincide, become matched in clearance, so-called matched in clearance must accomplish not leak out substantially here.Empty the upper oral part dust stratification of heat-exchange tube 1 and heat-exchange tube 2, with among two mouthfuls of cooperations of U-shaped pipe and heat-exchange tube 1 and heat-exchange tube 2 two mouthfuls.Wherein open circular hole in a bite center line centering place at the U-shaped pipe then, the circular hole internal diameter less than the U-shaped pipe mouth of pipe a little, with revolve a blowpipe (Fig. 6) and become matched in clearance (head that revolves a blowpipe is equipped with the metal spiral blade, and the blade external diameter is not more than the blowpipe external diameter), must accomplish equally not leak out substantially.To revolve a blowpipe and insert circular hole, connect rubber hose at the other end that revolves a blowpipe, communicate with compressed air source.
Install, at first start negative pressure, be i.e. discharging waste gas mouth exhausting, frequency conversion decrement.Open the compressed air of pressure 5-7 kilogram, spiral head is air effect by compression, rotation at a high speed, become the strength structure for conveying in the middle of the heat-exchange tube 1 simultaneously, dust in the blocked heat-exchange tube 1 is transferred to not blocked heat-exchange tube 2 by the U-shaped pipe, this moment, all not blocked heat-exchange tubes all were in negative wind suction condition, and the dust in the heat-exchange tube 2 directly is discharged exhaust outlet and discharges, and can not returned the pipeline of gambling plug and influence atmospheric environment from other.When constantly reducing along with dust in the heat-exchange tube 1, revolve a blowpipe also in continuous decline, descend and touch when luming in the pipe when revolving a blowpipe, because spiral head rotates at a high speed, luming is brokenly directly siphoned away by heat-exchange tube 1 negative wind, and mediation finishes, and whole process is no more than 3 minutes.Suppose that half heat-exchange tube is blocked, so total consuming time also with regard to about 170 minutes, can complete less than 3 hours.
At this preferred embodiment that this utility model has been described, comprise that the inventor is used to implement known optimal mode of the present utility model.The change of preferred embodiment is apparent for those of ordinary skills after reading above-mentioned explanation.The inventor wishes the change that the those of ordinary skill rational Application is such, and the inventor thinks and offers some clarification on different application at this and also can realize the utility model.Therefore, the utility model comprises all modifications and the equivalents of the purport of quoting in the claim of enclosing, and this allows in the law that is suitable for.In addition, any combination of all possible change of above-mentioned key element is also comprised by the utility model, unless point out in addition or obvious contradiction in context at this.
Claims (2)
1. pipe dredging device, it is characterized in that: comprise one have the U-shaped pipe of two mouths of pipe, the center line centering place of a mouth of pipe opens a circular hole therein, this circular hole internal diameter is less than the U-shaped pipe mouth of pipe, revolving a blowpipe inserts this circular hole and becomes matched in clearance, the head that revolves a blowpipe is equipped with the metal spiral blade, the blade external diameter connects rubber hose less than revolving a blowpipe external diameter at the other end that revolves a blowpipe, communicates with compressed air source.
2. pipe dredging device according to claim 1, it is characterized in that: two mouth of pipe centre-to-centre spacing of described U-shaped pipe and the centre-to-centre spacing of adjacent heat-exchange tube are coincide, and become matched in clearance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320206749 CN203227645U (en) | 2013-04-23 | 2013-04-23 | Pipeline dredging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320206749 CN203227645U (en) | 2013-04-23 | 2013-04-23 | Pipeline dredging device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203227645U true CN203227645U (en) | 2013-10-09 |
Family
ID=49283794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320206749 Expired - Fee Related CN203227645U (en) | 2013-04-23 | 2013-04-23 | Pipeline dredging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203227645U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103212556A (en) * | 2013-04-23 | 2013-07-24 | 苏州铉动三维空间科技有限公司 | Pipeline dredging device |
CN106694457A (en) * | 2016-12-08 | 2017-05-24 | 宁波科尼管洁净科技有限公司 | Pipe cleaning device and method |
CN114308923A (en) * | 2021-12-30 | 2022-04-12 | 老肯医疗科技股份有限公司 | Purging and drying device for inner cavity of endoscope |
-
2013
- 2013-04-23 CN CN 201320206749 patent/CN203227645U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103212556A (en) * | 2013-04-23 | 2013-07-24 | 苏州铉动三维空间科技有限公司 | Pipeline dredging device |
CN106694457A (en) * | 2016-12-08 | 2017-05-24 | 宁波科尼管洁净科技有限公司 | Pipe cleaning device and method |
CN106694457B (en) * | 2016-12-08 | 2019-10-11 | 宁波科尼管洁净科技有限公司 | Can washing apparatus and its cleaning method |
CN114308923A (en) * | 2021-12-30 | 2022-04-12 | 老肯医疗科技股份有限公司 | Purging and drying device for inner cavity of endoscope |
CN114308923B (en) * | 2021-12-30 | 2022-12-06 | 老肯医疗科技股份有限公司 | Scope inner chamber sweep drying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203227645U (en) | Pipeline dredging device | |
CN202885493U (en) | Gas energy-saving type expanding equipment for perlite | |
CN206112903U (en) | Two auger feed dross removal mechanism of biomass furnace utensil | |
CN103352709A (en) | Efficient energy-saving integrated walking type concrete pulp shooting machine | |
CN205257190U (en) | Anti -blocking device of coal chute | |
CN104482784B (en) | A kind of efficient liquid intensification gasification installation and method thereof | |
CN103212556A (en) | Pipeline dredging device | |
CN210858590U (en) | Double-pipe rotary spraying drill bit capable of preventing slurry return | |
CN206562086U (en) | Coal bunker is unpowered windproof defroster | |
CN219368288U (en) | Automatic drying device of tealeaves | |
CN105065033A (en) | Guniting machine | |
CN207882018U (en) | Multi-point sampling integrated apparatus | |
CN203559906U (en) | Supercharged powdery accelerator adding device for concrete wet spraying machine | |
CN203383828U (en) | Efficient and energy-saving integrated walking type concrete slurry spraying machine | |
CN110258249A (en) | A kind of Expressway Asphalt regenerative mixed device | |
CN202468492U (en) | Injection pump | |
CN203336923U (en) | Efficient drying machine for producing ammonia-acid method compound fertilizer | |
CN113356840A (en) | Distributed coal mine gas pressure measurement system | |
CN209124819U (en) | One kind sending sandpipe | |
CN204783056U (en) | Patching machine | |
CN207435473U (en) | A kind of blast furnace crucibe oxygen supply device | |
CN209427768U (en) | A kind of fettling installation of closed mixing sand tank | |
CN208984147U (en) | A kind of air measuring differential pressure type multiple spot canalis pterygoideus wind measuring device | |
CN110332413A (en) | Pipe heating devices | |
CN206670253U (en) | A kind of drying oven |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131009 Termination date: 20140423 |