CN203224579U - 变电站投运前保护向量测试系统 - Google Patents
变电站投运前保护向量测试系统 Download PDFInfo
- Publication number
- CN203224579U CN203224579U CN 201320158191 CN201320158191U CN203224579U CN 203224579 U CN203224579 U CN 203224579U CN 201320158191 CN201320158191 CN 201320158191 CN 201320158191 U CN201320158191 U CN 201320158191U CN 203224579 U CN203224579 U CN 203224579U
- Authority
- CN
- China
- Prior art keywords
- voltage
- transformer
- current
- test
- terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000013598 vector Substances 0.000 title claims abstract description 16
- 230000001681 protective effect Effects 0.000 claims description 7
- 238000001514 detection method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
Images
Abstract
实用新型公开了一种变电站投运前保护向量测试系统,解决了现有技术通过对电网的一次设备进行预充电所带来的时间长的问题。包括在一次导线(2)上分别设置有电流互感器(3)和电压互感器(4),电压互感器(4)的二次端与保护装置(5)连接,电流互感器(3)的二次端与保护装置(5)连接,电压电流发生器(6)的一次电压输出端(10)与一次导线(2)的测试输入端(8)连接,一次导线(2)的测试输出端(9)与电压电流发生器(6)的电流输入端(11)连接,电压互感器(4)的一次端和电流互感器(3)的一次端设置在测试输入端(8)与测试输出端(9)之间的一次导线(2)上。本实用新型大幅减少了变电站投运时间。
Description
技术领域
本实用新型涉及一种变电站投运前保护向量的测试系统。
背景技术
目前,变电站投运前需检查保护装置的向量,现有技术是通过对电网的一次设备进行预充电来实现的,这种预充电的方式存在时间长,操作频繁,发现错误后不好隔离的问题,特别是随着电网发展,变电站密度变大,线路长度缩短,导致部分短线路充电功率无法满足向量检测的需求,只能通过迂回带负荷方式检验,使得带电时间更长,向量检查不能快速完成,保护功能无法及时投入。
发明内容
本实用新型提供一种变电站投运前保护向量测试系统,解决了现有技术通过对电网的一次设备进行预充电所带来的时间长和保护功能无法及时投入的问题。
本实用新型是通过以下方案解决以上问题的:
一种变电站投运前保护向量测试系统,包括母线,在母线上连接有一次导线、在一次导线上分别设置有电流互感器和电压互感器,电压互感器的二次端与保护装置连接,电流互感器的二次端与保护装置连接,电压电流发生器的一次电压输出端与一次导线的测试输入端连接,一次导线的测试输出端与电压电流发生器的电流输入端连接,电压互感器的一次端和电流互感器的一次端设置在测试输入端与测试输出端之间的一次导线上。
电压电流发生器与大容量试验电源连接。
所述的电压电流发生器通过调整一次电压及无功负载电流,实现电压、电流向量定性定量验证。
本实用新型实现了变电站投运前保护向量的定性定量检测,大幅减少了变电站投运时间,并且保护功能及时投入。
附图说明:
图1是本实用新型的机构示意图
具体实施方式:
下面结合附图对本实用新型进行说明:
一种变电站投运前保护向量测试系统,包括母线1,在母线1上连接有一次导线2、在一次导线2上分别设置有电流互感器3和电压互感器4,电压互感器4的二次端与保护装置5连接,电流互感器3的二次端与保护装置5连接,电压电流发生器6的一次电压输出端10与一次导线2的测试输入端8连接,一次导线2的测试输出端9与电压电流发生器6的电流输入端11连接,电压互感器4的一次端和电流互感器3的一次端设置在测试输入端8与测试输出端9之间的一次导线2上。
电压电流发生器6与大容量试验电源7连接。
所述的电压电流发生器6通过调整一次电压及无功负载电流,实现电压、电流向量定性定量验证。
无功负载可以预先定性设置为电感或电容,容量满足电流互感器3检验需要,额定电压满足电压互感器4检验需要。调节电压使得一次导线电压达到无功负载额定电压值,在保护装置5定性定量检查向量,并作出正确判断。
Claims (2)
1.一种变电站投运前保护向量测试系统,包括母线(1),在母线(1)上连接有一次导线(2)、在一次导线(2)上分别设置有电流互感器(3)和电压互感器(4),其特征在于,电压互感器(4)的二次端与保护装置(5)连接,电流互感器(3)的二次端与保护装置(5)连接,电压电流发生器(6)的一次电压输出端(10)与一次导线(2)的测试输入端(8)连接,一次导线(2)的测试输出端(9)与电压电流发生器(6)的电流输入端(11)连接,电压互感器(4)的一次端和电流互感器(3)的一次端设置在测试输入端(8)与测试输出端(9)之间的一次导线(2)上。
2.根据权利要求1所述的一种变电站投运前保护向量测试系统,其特征在于,电压电流发生器(6)与大容量试验电源(7)连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320158191 CN203224579U (zh) | 2013-04-02 | 2013-04-02 | 变电站投运前保护向量测试系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320158191 CN203224579U (zh) | 2013-04-02 | 2013-04-02 | 变电站投运前保护向量测试系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203224579U true CN203224579U (zh) | 2013-10-02 |
Family
ID=49251581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320158191 Expired - Fee Related CN203224579U (zh) | 2013-04-02 | 2013-04-02 | 变电站投运前保护向量测试系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203224579U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104597298A (zh) * | 2015-02-09 | 2015-05-06 | 国家电网公司 | 智能变电站向量测试组合箱 |
CN107741536A (zh) * | 2017-11-08 | 2018-02-27 | 国家电网公司 | 线路空载充电向量检查方法 |
-
2013
- 2013-04-02 CN CN 201320158191 patent/CN203224579U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104597298A (zh) * | 2015-02-09 | 2015-05-06 | 国家电网公司 | 智能变电站向量测试组合箱 |
CN107741536A (zh) * | 2017-11-08 | 2018-02-27 | 国家电网公司 | 线路空载充电向量检查方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107750413B (zh) | 控制装置、蓄电装置及蓄电系统 | |
US10106036B2 (en) | Protecting a power supply including a plurality of batteries in parallel against an external short-circuit | |
CN105896711A (zh) | 蓄电池在线核容装置 | |
CN101958530A (zh) | 抽水蓄能电站主变压器差动保护ct极性校验方法 | |
CN107146917A (zh) | 用于车载两套电池系统并联的方法 | |
Pinto et al. | An electric vehicle charging station: Monitoring and analysis of power quality | |
CN113515838A (zh) | 直流系统建模仿真方法、装置、计算机设备和存储介质 | |
CN205791741U (zh) | 蓄电池在线核容装置 | |
CN203224579U (zh) | 变电站投运前保护向量测试系统 | |
JP5314626B2 (ja) | 電源システム、放電制御方法および放電制御プログラム | |
CN103163419B (zh) | 电缆芯校对和变压器跳闸出口校对用指示器及校对方法 | |
CN208580172U (zh) | 一种用于电力系统设备接地状况快速检测装置 | |
CN204334130U (zh) | 可充电智能电缆ct取电装置 | |
CN210111619U (zh) | 储能装置 | |
CN101692115A (zh) | 变压器中性点电流互感器极性测试仪 | |
Bakanagari et al. | Three phase fault analysis with auto reset for temporary fault and trip for permanent fault | |
Peng et al. | Research on self-power supply system of inspection robot for high-voltage power transmission lines | |
CN207689594U (zh) | 配电装置保护器多功能测试仪 | |
Cheang et al. | High efficiency powering system for wireless sensor for AC monitoring in smart grid applications | |
CN107741551A (zh) | 110kV电流互感器极性测试装置 | |
Yazdani | Modern Distribution Systems with PSCAD Analysis | |
CN204166019U (zh) | 一种产生大电流的简易装置 | |
CN207067384U (zh) | 一种电能表检测装置 | |
CN201828641U (zh) | 轻便一体式高压电动机交直流试验器 | |
CN103743935A (zh) | 一种用于煤矿生产的供电系统中的系统电容电流测量方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131002 Termination date: 20180402 |