CN203223911U - Fixing structure for fixing powdered coal burner and water-cooled wall together - Google Patents

Fixing structure for fixing powdered coal burner and water-cooled wall together Download PDF

Info

Publication number
CN203223911U
CN203223911U CN 201320173814 CN201320173814U CN203223911U CN 203223911 U CN203223911 U CN 203223911U CN 201320173814 CN201320173814 CN 201320173814 CN 201320173814 U CN201320173814 U CN 201320173814U CN 203223911 U CN203223911 U CN 203223911U
Authority
CN
China
Prior art keywords
water
coal burner
central area
horizontal central
rectangular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320173814
Other languages
Chinese (zh)
Inventor
薛志芳
薛金彪
何雁飞
赵丽娟
陈益增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huaguang Environment and Energy Group Co Ltd
Original Assignee
Wuxi Huaguang Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huaguang Boiler Co Ltd filed Critical Wuxi Huaguang Boiler Co Ltd
Priority to CN 201320173814 priority Critical patent/CN203223911U/en
Application granted granted Critical
Publication of CN203223911U publication Critical patent/CN203223911U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model provides a fixed structure for mixing a powdered coal burner and a water-cooled wall together. The problem of swelling amount difference between a burner and a furnace cavity water-cooled wall does not need to be considered during design because a connecting structure can relieve the swelling amount of the furnace cavity water-cooled wall when the furnace cavity water-cooled wall swells down, so that the design is simple, the sealing shell of the powdered coal burner is difficult to deform, and the fuel supply of an integral boiler is ensured. The fixed structure comprises the powdered coal burner and the water-cooled wall, wherein a rectangular frame is welded at the installation position of the powdered coal burner; a corresponding rectangular fixed frame is welded on the water-cooled wall and corresponds to the installation position of the powdered coal burner, of is welded with. The fixed structure is characterized in that the periphery of the rectangular fixed frame is provided with positioning circular holes; the density of the positioning circular holes positioned in the horizontal central area of the rectangular fixed frame is higher than the density of the positioning circular holes positioned in other areas; the rectangular frame is particularly welded through angle steel; and circular holes are arranged in the horizontal central area of the rectangular frame.

Description

The fixed structure of a kind of coal burner and water-cooling wall
Technical field
The utility model relates to the technical field of structures of pulverized-coal fired boiler, is specially the novel fixed structure of a kind of coal burner and water-cooling wall.
Background technology
The water-cooling wall upper end of existing large coal powder boiler is connected with drum by tedge, and whole water-cooling wall weight then is hung on the top board by derrick rig by the water-cooling wall upper collecting chamber.Because the water screen tube bending is less, swell increment is bigger, the ability of compensate for dilatation own is less, so the lower end is that can free wxpansion.In the prior art, coal burner is that the seal casinghousing by huge shape is welded to connect on water-cooling wall, when boiler water wall is heated back expansion downwards, burner is along with water-cooling wall moves down together, when the syndeton of design DC burner and water-cooling wall, must take into full account the swell increment difference problem between burner and the furnace wall cooling, otherwise cause the distortion of the seal casinghousing of coal burner easily, and then influencing the supply of whole boiler oil, its design is loaded down with trivial details.
Summary of the invention
At the problems referred to above, the utility model provides the fixed structure of a kind of coal burner and water-cooling wall, it makes when furnace wall cooling expands downwards, syndeton can be alleviated the swell increment of loss of sheet thorax water-cooling wall, need not to consider again the swell increment difference problem between burner and the furnace wall cooling when making design, make simplicity of design, the seal casinghousing of coal burner is not yielding, guarantees the fuel supply of whole boiler.
The fixed structure of a kind of coal burner and water-cooling wall, its technical scheme is such: it comprises coal burner, water-cooling wall, the installation site of described coal burner is welded with rectangular frame, described water-cooling wall is welded with corresponding rectangle fixed mount corresponding to the installation site of described coal burner, it is characterized in that: be provided with positioning round orifice around the described rectangle fixed mount, the positioning round orifice density of the horizontal central area of described rectangle fixed mount is higher than all the other regional positioning round orifice, described rectangular frame is specially the rectangular frame that angle steel is welded, the horizontal central area of described rectangular frame is provided with circular hole, and the position of described circular hole is corresponding to the position of the positioning round orifice of the horizontal central area of described rectangle fixed mount; Bolt is fastenedly connected circular hole, the positioning round orifice of the correspondence of horizontal central area respectively; The peripheral regions except horizontal central area of described rectangular frame is provided with mounting hole, and described mounting hole is vertically arranged; Bolt is fastenedly connected mounting hole, the positioning round orifice of the correspondence of the peripheral regions except horizontal central area respectively.
After adopting structure of the present utility model, because the horizontal central area of rectangular frame is provided with circular hole, the position of circular hole is corresponding to the position of the positioning round orifice of the horizontal central area of rectangle fixed mount; Bolt is fastenedly connected circular hole, the positioning round orifice of the correspondence of horizontal central area respectively; The peripheral regions except horizontal central area of rectangular frame is provided with mounting hole, and mounting hole is vertically arranged; Bolt is fastenedly connected mounting hole, the positioning round orifice of the correspondence of the peripheral regions except horizontal central area respectively, it makes burner be connected with the flange that is connected to of water-cooling wall, reduce boiler burner and burner adpting flange, i.e. stress between the rectangular frame in start-up course; And being connected to of burner and water-cooling wall slipped, syndeton can be alleviated the swell increment of loss of sheet thorax water-cooling wall, need not to consider again the swell increment difference problem between burner and the furnace wall cooling when making design, make simplicity of design, the seal casinghousing of coal burner is not yielding, guarantees the fuel supply of whole boiler.
Description of drawings
Fig. 1 is front view structural representation of the present utility model;
Fig. 2 be among Fig. 1 A to the structural representation of rectangular frame;
Fig. 3 be among Fig. 1 B to the structural representation of rectangle fixed mount.
The specific embodiment
See Fig. 1, Fig. 2, Fig. 3, it comprises coal burner 1, water-cooling wall 2, the installation site of coal burner 1 is welded with rectangular frame 3, water-cooling wall 2 is welded with corresponding rectangle fixed mount 4 corresponding to the installation site of coal burner 1, be provided with positioning round orifice 5 around the rectangle fixed mount 4, positioning round orifice 5 density of the horizontal central area of rectangle fixed mount 4 are higher than all the other regional positioning round orifice 5, rectangular frame 3 is specially the rectangular frame that angle steel is welded, the horizontal central area of rectangular frame 3 is provided with circular hole 6, and the position of circular hole 6 is corresponding to the position of the positioning round orifice 5 of the horizontal central area of rectangle fixed mount 4; Bolt 7 is fastenedly connected circular hole 6, the positioning round orifice 5 of the correspondence of horizontal central area respectively; The peripheral regions except horizontal central area of rectangular frame 3 is provided with mounting hole 8, and mounting hole 8 is vertically arranged; Bolt 7 is fastenedly connected mounting hole 8, the positioning round orifice 5 of the correspondence of the peripheral regions except horizontal central area respectively.

Claims (1)

1. the fixed structure of a coal burner and water-cooling wall, it comprises coal burner, water-cooling wall, the installation site of described coal burner is welded with rectangular frame, described water-cooling wall is welded with corresponding rectangle fixed mount corresponding to the installation site of described coal burner, it is characterized in that: be provided with positioning round orifice around the described rectangle fixed mount, the positioning round orifice density of the horizontal central area of described rectangle fixed mount is higher than all the other regional positioning round orifice, described rectangular frame is specially the rectangular frame that angle steel is welded, the horizontal central area of described rectangular frame is provided with circular hole, and the position of described circular hole is corresponding to the position of the positioning round orifice of the horizontal central area of described rectangle fixed mount; Bolt is fastenedly connected circular hole, the positioning round orifice of the correspondence of horizontal central area respectively; The peripheral regions except horizontal central area of described rectangular frame is provided with mounting hole, and described mounting hole is vertically arranged; Bolt is fastenedly connected mounting hole, the positioning round orifice of the correspondence of the peripheral regions except horizontal central area respectively.
CN 201320173814 2013-04-09 2013-04-09 Fixing structure for fixing powdered coal burner and water-cooled wall together Expired - Lifetime CN203223911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320173814 CN203223911U (en) 2013-04-09 2013-04-09 Fixing structure for fixing powdered coal burner and water-cooled wall together

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320173814 CN203223911U (en) 2013-04-09 2013-04-09 Fixing structure for fixing powdered coal burner and water-cooled wall together

Publications (1)

Publication Number Publication Date
CN203223911U true CN203223911U (en) 2013-10-02

Family

ID=49250914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320173814 Expired - Lifetime CN203223911U (en) 2013-04-09 2013-04-09 Fixing structure for fixing powdered coal burner and water-cooled wall together

Country Status (1)

Country Link
CN (1) CN203223911U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103234197A (en) * 2013-04-09 2013-08-07 无锡华光锅炉股份有限公司 Pulverized coal combustor and water wall fixed structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103234197A (en) * 2013-04-09 2013-08-07 无锡华光锅炉股份有限公司 Pulverized coal combustor and water wall fixed structure

Similar Documents

Publication Publication Date Title
CN104455956B (en) A kind of it is mechanically fixed tensioner by what three pieces of drifts were constituted
CN203223911U (en) Fixing structure for fixing powdered coal burner and water-cooled wall together
CN203797677U (en) Sealing device for tail smoke flue bottom of boiler
CN103234197A (en) Pulverized coal combustor and water wall fixed structure
CN103994421B (en) The sealed support device at a kind of header place through walls
CN205976500U (en) Assembled hangs mould device
CN107171512A (en) A kind of motor rotor assembles casing stator fixing apparatus
CN204063021U (en) The blast cap assembly of fluidized-bed combustion boiler
CN201662049U (en) Serpentine tube bank supporting and hanging structure
CN203928312U (en) A kind of mounting structure of external efficient air distributor DOP pipe
CN202082571U (en) Embedded display screen mounting seat
CN203869015U (en) Device for sealing support in through-wall position of collection box
CN103939893B (en) A kind of central tube fixed sturcture for circular fluid bed
CN206398798U (en) A kind of quick detachable panel construction applied to cigarette machine
CN207405876U (en) A kind of firm banking for column component
CN205956928U (en) Signal lamp
CN207553396U (en) A kind of antitorque weights-hoist component of curtain-wall stand-column
CN205137522U (en) Diaphragm type reinforcing beam fixed structure
CN213178923U (en) Air conditioner reservoir fixing support
CN203797626U (en) Header supporting and limiting device in boiler
CN204279007U (en) Easy installation and reliable side door adjusting pad
CN205299468U (en) Boiler top canopy expansion joint sealing device
CN204213936U (en) A kind of dual firing chamber
CN108953235A (en) A kind of chemical pump with shock-absorbing function
CN203517843U (en) Fire cylinder smoke tube capable of being pulled out

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 214028 No. 3 Chengnan Road, new Wu District, Jiangsu, Wuxi

Patentee after: Wuxi Huaguang Environmental Protection Energy Group Co.,Ltd.

Address before: 214028 No. 3 Chengnan Road, New District, Jiangsu, Wuxi

Patentee before: WUXI HUAGUANG BOILER Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131002