CN203222997U - Self-excited oscillation precast beam pedestal - Google Patents
Self-excited oscillation precast beam pedestal Download PDFInfo
- Publication number
- CN203222997U CN203222997U CN2013201681951U CN201320168195U CN203222997U CN 203222997 U CN203222997 U CN 203222997U CN 2013201681951 U CN2013201681951 U CN 2013201681951U CN 201320168195 U CN201320168195 U CN 201320168195U CN 203222997 U CN203222997 U CN 203222997U
- Authority
- CN
- China
- Prior art keywords
- pedestal
- steel plate
- concrete
- precast beam
- self
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a self-excited oscillation precast beam pedestal, comprising pedestal concrete, wherein a plurality of preserved grooves are formed in the top end of the pedestal concrete; a pedestal steel plate is paved on the grooves; hollow steel pipes are welded on the lower end of the pedestal steel plate and are located in the preserved grooves; vibrating spears are inserted into the hollow steel pipes; a side template is arranged above the pedestal steel plate; and concrete is poured inside an upper template on the pedestal steel plate. According to the self-excited oscillation precast beam pedestal, one or a plurality of hollow steel pipe(s) is/are welded on the lower part of a pedestal bottom template according to the width of the pedestal and is/are taken as inserting holes of the vibrating spears; when the concrete is poured, the vibrating spears are inserted from the steel pipes; the bottom template is vibrated under the drive of the vibrating spears, and the vibrating spears are drawn and pulled to adjust the positions of the vibrating spears along with the pouring progress, so that each position can be guaranteed to be vibrated and compacted; and not only is the problem that the precast beam baseplate is not easily vibrated solved, but also the investment is small, and the operation is convenient.
Description
Technical field:
The utility model relates to building engineering field, relates in particular to a kind of self-vibration formula precast beam pedestal.
Background technology:
Domestic prior art precast beam adopts fixed base more, and building underplate concrete needs internal vibration from the top down, because reinforcing bar is intensive, vibrating spear is difficult to insert, operating personnel's workload is big, inserts spacing, the quality of vibrating can't guarantee, causes the underplate concrete leakiness of vibrating easily.Therefore imagination provides a kind of equipment to solve this problem.
The utility model content:
The purpose of this utility model just provides a kind of self-vibration formula precast beam pedestal, solve domestic prior art precast beam and adopt fixed base more, build underplate concrete and need internal vibration from the top down, because reinforcing bar is intensive, vibrating spear is difficult to insert, operating personnel's workload is big, inserts spacing, the quality of vibrating can't guarantee, causes underplate concrete uncompacted problem of vibrating easily.
The technical solution adopted in the utility model is:
A kind of self-vibration formula precast beam pedestal, comprise the pedestal concrete: pedestal concrete top has some reservation grooves, upper berth base steel plate, pre-buried hollow steel tube in reserving groove, and be welded into integral body with the base steel plate; During concreting, in hollow steel tube, insert vibrating head.
The vibrating head jack is reserved in described pedestal concrete below, and jack leads to hollow steel tube, during concreting, vibrating head inserts in pre-buried jack, drive the vibration of base steel plate by vibrating head, and adjust vibrating spear with building the progress pull, the realization underplate concrete is made firm by ramming closely knit.
Side form is installed in described base steel plate top, in the side form of concreting on the base steel plate.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is by welding one or more (determining according to the pedestal width) hollow steel tube in pedestal bed die bottom, as the vibrating spear jack, during concreting, vibrating spear inserts in steel pipe, drive the bed die vibration by vibrating spear, and with building progress pull adjustment vibrating spear position, guarantee each position vibration compacting.Not only overcome the vibrate problem of difficulty of precast beam base plate, and fund input is little, easy to operate.
Description of drawings:
Accompanying drawing 2 is the utility model pedestal longitudinal plan;
Accompanying drawing 3 is the utility model construction schematic diagram.
The specific embodiment:
Below in conjunction with accompanying drawing, be described in further detail by the utility model of embodiment:
A kind of self-vibration formula precast beam pedestal, comprise pedestal concrete 4: pedestal concrete 4 tops have some reservation grooves 3, reserve groove 3 upper ends base steel plate 2 is installed, the lower end of base steel plate 2 is welded with hollow steel tube 1, hollow steel tube 1 is positioned at reserves groove 3, is inserted with vibrating head 5 in the hollow steel tube 1; Side form 7 is installed in base steel plate 2 tops, and concrete 6 is cast in the side form on the base steel plate.
When constructing pedestal concrete 4, reserve 10 * 8cm groove 3 by the position of design, provide free space for Φ 57 * 3.5 steel pipes 1 being installed and being vibrated.Groove 3 is apart from pedestal limit 20cm, spacing 40cm each other.Steel pipe 1 is welded into integral body with base steel plate 2, guarantees that vibrating head 5 vibrations are delivered on the base steel plate 2.Base steel plate 2 is fixed on the pedestal concrete 4 by pre-buried muscle.
Insert in Φ 57 * 3.5 steel pipes 1 the pipe center contact from two ends with Φ 50 vibrating heads 5 before the concreting.When building underplate concrete, start vibrating head 5, drive 2 vibrations of bed die steel plate, reach the effect of vibration compacting.
Concrete implementation step:
A, build pedestal, Φ 57 * 3.5 steel pipe 1 and bed dies are installed;
B, insert vibrating head 5 before building, each hole is respectively inserted one from two ends, in center contact;
C, concreting 6 start vibrating head 5, and vibrating head 5 moves synchronously with the concreting position and outwards extracts.
D, extract vibrating spear 5 and build web concrete.
Above-described embodiment only is preferred implementation of the present utility model, and in addition, the utility model can also have other implementations.Need to prove that under the prerequisite that does not break away from the utility model design, any apparent improvement and modification all should fall within the protection domain of the present utility model.
Claims (3)
1. a self-vibration formula precast beam pedestal comprises the pedestal concrete, and it is characterized in that: pedestal concrete top has some reservation grooves, upper berth base steel plate, and pre-buried hollow steel tube in reserving groove, and be welded into integral body with the base steel plate; During concreting, in hollow steel tube, insert vibrating head.
2. self-vibration formula precast beam pedestal according to claim 1, it is characterized in that: the vibrating head jack is reserved in described pedestal concrete below, jack leads to hollow steel tube, during concreting, vibrating head inserts in pre-buried jack, drive the vibration of base steel plate by vibrating head, and adjust vibrating spear with building the progress pull, the realization underplate concrete is made firm by ramming closely knit.
3. self-vibration formula precast beam pedestal according to claim 1 is characterized in that: side form is installed, in the side form of concreting on the base steel plate above the described base steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013201681951U CN203222997U (en) | 2013-04-07 | 2013-04-07 | Self-excited oscillation precast beam pedestal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013201681951U CN203222997U (en) | 2013-04-07 | 2013-04-07 | Self-excited oscillation precast beam pedestal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203222997U true CN203222997U (en) | 2013-10-02 |
Family
ID=49250004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013201681951U Expired - Fee Related CN203222997U (en) | 2013-04-07 | 2013-04-07 | Self-excited oscillation precast beam pedestal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203222997U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592426A (en) * | 2017-01-17 | 2017-04-26 | 安徽省交通建设有限责任公司 | Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method |
CN106760546A (en) * | 2017-02-03 | 2017-05-31 | 山东科技大学 | Vibrating method and tamping equipment are poured when large volume concrete structural thing is constructed |
CN107448217A (en) * | 2017-09-25 | 2017-12-08 | 中铁十七局集团第工程有限公司 | A kind of practical tunnel lining trolley vibrating system |
CN113863166A (en) * | 2021-11-26 | 2021-12-31 | 中铁二十四局集团有限公司 | Reverse construction method for mounting support after rotating |
-
2013
- 2013-04-07 CN CN2013201681951U patent/CN203222997U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592426A (en) * | 2017-01-17 | 2017-04-26 | 安徽省交通建设有限责任公司 | Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method |
CN106592426B (en) * | 2017-01-17 | 2018-04-06 | 安徽省交通建设股份有限公司 | The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system |
CN106760546A (en) * | 2017-02-03 | 2017-05-31 | 山东科技大学 | Vibrating method and tamping equipment are poured when large volume concrete structural thing is constructed |
CN106760546B (en) * | 2017-02-03 | 2023-06-20 | 山东科技大学 | Pouring vibration method and vibration device for large-volume concrete structure construction |
CN107448217A (en) * | 2017-09-25 | 2017-12-08 | 中铁十七局集团第工程有限公司 | A kind of practical tunnel lining trolley vibrating system |
CN113863166A (en) * | 2021-11-26 | 2021-12-31 | 中铁二十四局集团有限公司 | Reverse construction method for mounting support after rotating |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203222997U (en) | Self-excited oscillation precast beam pedestal | |
CN107443566B (en) | The production method of prefabricated constructional column formwork | |
CN209779820U (en) | Supporting structure of bottom template for cover plate of drainage ditch | |
CN202291318U (en) | Continuous casting ingot guide box for small square billet | |
CN107288263B (en) | The construction method of prefabricated constructional column | |
CN105332511A (en) | Huge concrete filled steel tubular column core grouting pouring and tamping device and method | |
CN104695555A (en) | Construction process for joint of large-section beam column of different concrete strength grades | |
CN103883088A (en) | Slope roof concrete construction device and method | |
CN103669875A (en) | Tamping assist device for concrete pouring and manufacture method thereof | |
CN206986727U (en) | A kind of device to be vibrated for bridge skew web plate | |
CN208455659U (en) | A kind of lower margin pre-embedded device of large scale equipment | |
CN208137432U (en) | Take assembled formwork device of level bubble | |
CN102286920A (en) | Floating resistance device for inner mold of box beam | |
CN207419778U (en) | A kind of free removal wall body casting template device | |
CN215889359U (en) | Stair template branch base | |
CN207268046U (en) | Hang the beams of concrete of channel steel | |
CN202706558U (en) | Early disassembling head | |
CN205999730U (en) | A kind of non-fragment orbit base pours uses template | |
CN201390951Y (en) | Stepped formwork of roller compacted concrete dam overflow surface | |
CN203755682U (en) | Secondary pouring form board constructing structure for small opening of concrete structure floor slab | |
CN205999729U (en) | The non-fragment orbit base cast running gear that vibrates | |
CN204382473U (en) | A kind of prefabricated reinforced concrete prestressed T-shaped girder side template | |
CN202899123U (en) | Pipe pile concreting reinforcement cage with circular ring internal supports | |
CN105297758A (en) | Prestressed square pile and steel latticed column integrated stand column | |
CN207004010U (en) | A kind of building bearing post pours mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131002 Termination date: 20160407 |
|
CF01 | Termination of patent right due to non-payment of annual fee |