CN203222997U - Self-excited oscillation precast beam pedestal - Google Patents

Self-excited oscillation precast beam pedestal Download PDF

Info

Publication number
CN203222997U
CN203222997U CN2013201681951U CN201320168195U CN203222997U CN 203222997 U CN203222997 U CN 203222997U CN 2013201681951 U CN2013201681951 U CN 2013201681951U CN 201320168195 U CN201320168195 U CN 201320168195U CN 203222997 U CN203222997 U CN 203222997U
Authority
CN
China
Prior art keywords
pedestal
steel plate
concrete
precast beam
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013201681951U
Other languages
Chinese (zh)
Inventor
张家新
付香才
武伟华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of CTCE Group
Original Assignee
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of CTCE Group filed Critical Third Construction Co Ltd of CTCE Group
Priority to CN2013201681951U priority Critical patent/CN203222997U/en
Application granted granted Critical
Publication of CN203222997U publication Critical patent/CN203222997U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a self-excited oscillation precast beam pedestal, comprising pedestal concrete, wherein a plurality of preserved grooves are formed in the top end of the pedestal concrete; a pedestal steel plate is paved on the grooves; hollow steel pipes are welded on the lower end of the pedestal steel plate and are located in the preserved grooves; vibrating spears are inserted into the hollow steel pipes; a side template is arranged above the pedestal steel plate; and concrete is poured inside an upper template on the pedestal steel plate. According to the self-excited oscillation precast beam pedestal, one or a plurality of hollow steel pipe(s) is/are welded on the lower part of a pedestal bottom template according to the width of the pedestal and is/are taken as inserting holes of the vibrating spears; when the concrete is poured, the vibrating spears are inserted from the steel pipes; the bottom template is vibrated under the drive of the vibrating spears, and the vibrating spears are drawn and pulled to adjust the positions of the vibrating spears along with the pouring progress, so that each position can be guaranteed to be vibrated and compacted; and not only is the problem that the precast beam baseplate is not easily vibrated solved, but also the investment is small, and the operation is convenient.

Description

A kind of self-vibration formula precast beam pedestal
Technical field:
The utility model relates to building engineering field, relates in particular to a kind of self-vibration formula precast beam pedestal.
Background technology:
Domestic prior art precast beam adopts fixed base more, and building underplate concrete needs internal vibration from the top down, because reinforcing bar is intensive, vibrating spear is difficult to insert, operating personnel's workload is big, inserts spacing, the quality of vibrating can't guarantee, causes the underplate concrete leakiness of vibrating easily.Therefore imagination provides a kind of equipment to solve this problem.
The utility model content:
The purpose of this utility model just provides a kind of self-vibration formula precast beam pedestal, solve domestic prior art precast beam and adopt fixed base more, build underplate concrete and need internal vibration from the top down, because reinforcing bar is intensive, vibrating spear is difficult to insert, operating personnel's workload is big, inserts spacing, the quality of vibrating can't guarantee, causes underplate concrete uncompacted problem of vibrating easily.
The technical solution adopted in the utility model is:
A kind of self-vibration formula precast beam pedestal, comprise the pedestal concrete: pedestal concrete top has some reservation grooves, upper berth base steel plate, pre-buried hollow steel tube in reserving groove, and be welded into integral body with the base steel plate; During concreting, in hollow steel tube, insert vibrating head.
The vibrating head jack is reserved in described pedestal concrete below, and jack leads to hollow steel tube, during concreting, vibrating head inserts in pre-buried jack, drive the vibration of base steel plate by vibrating head, and adjust vibrating spear with building the progress pull, the realization underplate concrete is made firm by ramming closely knit.
Side form is installed in described base steel plate top, in the side form of concreting on the base steel plate.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is by welding one or more (determining according to the pedestal width) hollow steel tube in pedestal bed die bottom, as the vibrating spear jack, during concreting, vibrating spear inserts in steel pipe, drive the bed die vibration by vibrating spear, and with building progress pull adjustment vibrating spear position, guarantee each position vibration compacting.Not only overcome the vibrate problem of difficulty of precast beam base plate, and fund input is little, easy to operate.
Description of drawings:
Accompanying drawing 1 is the utility model pedestal drawing in side sectional elevation;
Accompanying drawing 2 is the utility model pedestal longitudinal plan;
Accompanying drawing 3 is the utility model construction schematic diagram.
The specific embodiment:
Below in conjunction with accompanying drawing, be described in further detail by the utility model of embodiment:
A kind of self-vibration formula precast beam pedestal, comprise pedestal concrete 4: pedestal concrete 4 tops have some reservation grooves 3, reserve groove 3 upper ends base steel plate 2 is installed, the lower end of base steel plate 2 is welded with hollow steel tube 1, hollow steel tube 1 is positioned at reserves groove 3, is inserted with vibrating head 5 in the hollow steel tube 1; Side form 7 is installed in base steel plate 2 tops, and concrete 6 is cast in the side form on the base steel plate.
When constructing pedestal concrete 4, reserve 10 * 8cm groove 3 by the position of design, provide free space for Φ 57 * 3.5 steel pipes 1 being installed and being vibrated.Groove 3 is apart from pedestal limit 20cm, spacing 40cm each other.Steel pipe 1 is welded into integral body with base steel plate 2, guarantees that vibrating head 5 vibrations are delivered on the base steel plate 2.Base steel plate 2 is fixed on the pedestal concrete 4 by pre-buried muscle.
Insert in Φ 57 * 3.5 steel pipes 1 the pipe center contact from two ends with Φ 50 vibrating heads 5 before the concreting.When building underplate concrete, start vibrating head 5, drive 2 vibrations of bed die steel plate, reach the effect of vibration compacting.
Concrete implementation step:
A, build pedestal, Φ 57 * 3.5 steel pipe 1 and bed dies are installed;
B, insert vibrating head 5 before building, each hole is respectively inserted one from two ends, in center contact;
C, concreting 6 start vibrating head 5, and vibrating head 5 moves synchronously with the concreting position and outwards extracts.
D, extract vibrating spear 5 and build web concrete.
Above-described embodiment only is preferred implementation of the present utility model, and in addition, the utility model can also have other implementations.Need to prove that under the prerequisite that does not break away from the utility model design, any apparent improvement and modification all should fall within the protection domain of the present utility model.

Claims (3)

1. a self-vibration formula precast beam pedestal comprises the pedestal concrete, and it is characterized in that: pedestal concrete top has some reservation grooves, upper berth base steel plate, and pre-buried hollow steel tube in reserving groove, and be welded into integral body with the base steel plate; During concreting, in hollow steel tube, insert vibrating head.
2. self-vibration formula precast beam pedestal according to claim 1, it is characterized in that: the vibrating head jack is reserved in described pedestal concrete below, jack leads to hollow steel tube, during concreting, vibrating head inserts in pre-buried jack, drive the vibration of base steel plate by vibrating head, and adjust vibrating spear with building the progress pull, the realization underplate concrete is made firm by ramming closely knit.
3. self-vibration formula precast beam pedestal according to claim 1 is characterized in that: side form is installed, in the side form of concreting on the base steel plate above the described base steel plate.
CN2013201681951U 2013-04-07 2013-04-07 Self-excited oscillation precast beam pedestal Expired - Fee Related CN203222997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013201681951U CN203222997U (en) 2013-04-07 2013-04-07 Self-excited oscillation precast beam pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013201681951U CN203222997U (en) 2013-04-07 2013-04-07 Self-excited oscillation precast beam pedestal

Publications (1)

Publication Number Publication Date
CN203222997U true CN203222997U (en) 2013-10-02

Family

ID=49250004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013201681951U Expired - Fee Related CN203222997U (en) 2013-04-07 2013-04-07 Self-excited oscillation precast beam pedestal

Country Status (1)

Country Link
CN (1) CN203222997U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592426A (en) * 2017-01-17 2017-04-26 安徽省交通建设有限责任公司 Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method
CN106760546A (en) * 2017-02-03 2017-05-31 山东科技大学 Vibrating method and tamping equipment are poured when large volume concrete structural thing is constructed
CN107448217A (en) * 2017-09-25 2017-12-08 中铁十七局集团第工程有限公司 A kind of practical tunnel lining trolley vibrating system
CN113863166A (en) * 2021-11-26 2021-12-31 中铁二十四局集团有限公司 Reverse construction method for mounting support after rotating

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592426A (en) * 2017-01-17 2017-04-26 安徽省交通建设有限责任公司 Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method
CN106592426B (en) * 2017-01-17 2018-04-06 安徽省交通建设股份有限公司 The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN106760546A (en) * 2017-02-03 2017-05-31 山东科技大学 Vibrating method and tamping equipment are poured when large volume concrete structural thing is constructed
CN106760546B (en) * 2017-02-03 2023-06-20 山东科技大学 Pouring vibration method and vibration device for large-volume concrete structure construction
CN107448217A (en) * 2017-09-25 2017-12-08 中铁十七局集团第工程有限公司 A kind of practical tunnel lining trolley vibrating system
CN113863166A (en) * 2021-11-26 2021-12-31 中铁二十四局集团有限公司 Reverse construction method for mounting support after rotating

Similar Documents

Publication Publication Date Title
CN203222997U (en) Self-excited oscillation precast beam pedestal
CN107443566B (en) The production method of prefabricated constructional column formwork
CN209779820U (en) Supporting structure of bottom template for cover plate of drainage ditch
CN202291318U (en) Continuous casting ingot guide box for small square billet
CN107288263B (en) The construction method of prefabricated constructional column
CN105332511A (en) Huge concrete filled steel tubular column core grouting pouring and tamping device and method
CN104695555A (en) Construction process for joint of large-section beam column of different concrete strength grades
CN103883088A (en) Slope roof concrete construction device and method
CN103669875A (en) Tamping assist device for concrete pouring and manufacture method thereof
CN206986727U (en) A kind of device to be vibrated for bridge skew web plate
CN208455659U (en) A kind of lower margin pre-embedded device of large scale equipment
CN208137432U (en) Take assembled formwork device of level bubble
CN102286920A (en) Floating resistance device for inner mold of box beam
CN207419778U (en) A kind of free removal wall body casting template device
CN215889359U (en) Stair template branch base
CN207268046U (en) Hang the beams of concrete of channel steel
CN202706558U (en) Early disassembling head
CN205999730U (en) A kind of non-fragment orbit base pours uses template
CN201390951Y (en) Stepped formwork of roller compacted concrete dam overflow surface
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN205999729U (en) The non-fragment orbit base cast running gear that vibrates
CN204382473U (en) A kind of prefabricated reinforced concrete prestressed T-shaped girder side template
CN202899123U (en) Pipe pile concreting reinforcement cage with circular ring internal supports
CN105297758A (en) Prestressed square pile and steel latticed column integrated stand column
CN207004010U (en) A kind of building bearing post pours mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131002

Termination date: 20160407

CF01 Termination of patent right due to non-payment of annual fee