CN203217050U - Final circular test (FCT) multi-station test device - Google Patents

Final circular test (FCT) multi-station test device Download PDF

Info

Publication number
CN203217050U
CN203217050U CN 201320027776 CN201320027776U CN203217050U CN 203217050 U CN203217050 U CN 203217050U CN 201320027776 CN201320027776 CN 201320027776 CN 201320027776 U CN201320027776 U CN 201320027776U CN 203217050 U CN203217050 U CN 203217050U
Authority
CN
China
Prior art keywords
plate
pressing plate
test
proving installation
energy meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201320027776
Other languages
Chinese (zh)
Inventor
罗冬生
雷金和
张欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Sanxing Electric Co Ltd
Original Assignee
Ningbo Sanxing Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sanxing Electric Co Ltd filed Critical Ningbo Sanxing Electric Co Ltd
Priority to CN 201320027776 priority Critical patent/CN203217050U/en
Application granted granted Critical
Publication of CN203217050U publication Critical patent/CN203217050U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Tests Of Electronic Circuits (AREA)

Abstract

The utility model discloses a final circular test (FCT) multi-station test device which comprises a rack (1) and a plurality of single-station test devices. The plurality of single-station test devices are used for testing a printed circuit board assembly (PCBA) of an electric energy meter in one time. The plurality of single-station test devices are all arranged on the rack (1). The FCT multi-station test device saves time and labor, is high in test efficiency, and has high precision in test results.

Description

FCT multistation proving installation
Technical field
The utility model relates to and a kind of electric energy meter PCBA plate is carried out dry run with the equipment of verification electric energy meter operate as normal parameter, specifically is a kind of FCT multistation proving installation.
Background technology
Proper testing for electric energy meter PCBA plate is to be undertaken by multimeter at present.During test, by multimeter each data parameters of an electric energy meter PCBA plate is tested one by one, compare with normal data parameters then, thereby realization is to the proper testing of electric energy meter PCBA plate.The proving installation of this multimeter have a following problem: 1, owing to once can only test an electric energy meter PCBA plate, and need during test one by one parameter to test, therefore not only test gets up to waste time and energy, and testing efficiency is low.2, there is certain potential safety hazard in this simple machine, unskilled very easily electric shock of employee in the production run and security incident takes place.
The utility model content
The technical problems to be solved in the utility model is, overcomes the defective of above prior art, and a kind of time saving and energy saving, FCT multistation proving installation that testing efficiency is high and safe is provided.
The technical solution of the utility model is, a kind of FCT multistation proving installation is provided, and comprises frame and a plurality of single station proving installation for an electric energy meter PCBA of disposable test plate, and described a plurality of single station proving installations all are arranged on the frame.
Described single station proving installation comprises that a pressure plate structure, that is used for pressing down electric energy meter PCBA plate is for the actuator that drives the pressure plate structure knee-action, frock and a needle plate structure that is used for providing power supply and signal to electric energy meter for the placement of electric energy meter PCBA plate; Described actuator is fixedly connected on the top of frame; The clutch end of described actuator is connected with pressure plate structure; Described frock is slidingly fitted on the needle plate structure; Described needle plate is located at the bottom of frame.
Described pressure plate structure comprises a fixed mount, first pressing plate and second pressing plate; The clutch end of described actuator is fixedlyed connected with the fixed head on the fixed mount; Described fixed mount is provided with the two-layer step that supplies first pressing plate and second pressing plate to place respectively; On described first pressing plate is located at and tops bar; On described second pressing plate is located at and gets out of a predicament or an embarrassing situation; Described fixed head is provided with a screw, and described screw passes fixed head and is connected on first pressing plate; Described first pressing plate has many pillars; Described many pillars be against second pressing plate above; Be provided with a plurality of thimbles below described second pressing plate.
Described frock comprises dull and stereotyped and two right angle limited blocks, and the middle part of described flat board is provided with a window, and described right angle limited block is fixedly mounted on the flat board; The described electric energy meter PCBA plate of test that needs is located between two right angle limited blocks.
Described needle plate structure comprises an electric test plate and Duo Gen electric test pin, and described many electric test pins are connected electrically on the electric test plate.
Described electric test plate is provided with many guide pillars, and described flat board is provided with for the many through holes that guide pillar is slidingly matched; Described screw passes through hole and is connected with guide pillar; Also be connected with many back-moving springs between described electric test plate and the flat board.
After adopting above structure, the utility model compared with prior art has the following advantages:
1, the utility model FCT multistation proving installation is provided with a plurality of single station proving installations, can once test polylith electric energy meter PCBA plate by this device, and need not parameter is tested one by one when test, it is time saving and energy saving therefore not only to test, and testing efficiency is higher.2, because the utility model FCT multistation proving installation employee in test process can not contact electric energy meter PCBA plate, so it is safe.
Description of drawings
Fig. 1 is the structural representation of the utility model FCT multistation proving installation.
Fig. 2 is the structural representation of single station proving installation.
Shown in the figure 1, frame, 2, pressure plate structure, 2.1, fixed head, 2.2, first pressing plate, 2.3, second pressing plate, 2.4, fixed head, 2.5, step, 2.51, left step, 2.52, right step, 2.6, screw, 2.7, pillar, 2.8, thimble, 3, actuator, 4, frock, 4.1, flat board, 4.2, two right angle limited blocks, 4.3 window, 5, needle plate structure, 5.1, the electric test plate, 5.2, the electric test pin, 6, guide pillar, 7, through hole, 8, stop screw, 9, back-moving spring.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
As shown in Figure 1 and Figure 2, a kind of FCT multistation of the utility model proving installation comprises frame 1 and a plurality of single station proving installation for an electric energy meter PCBA of disposable test plate, namely should list station proving installation is disposable can only test an electric energy meter PCBA plate; Described a plurality of single station proving installation all is arranged on the frame 1.
Described single station proving installation comprises that a pressure plate structure 2, that is used for pressing down electric energy meter PCBA plate is for the actuator 3 that drives pressure plate structure 2 knee-actions, frock 4 and a needle plate structure 5 that is used for providing power supply and signal to electric energy meter for the placement of electric energy meter PCBA plate, wherein actuator 3 is a cylinder, gets final product operate as normal by it is connected with solenoid valve, source of the gas; Described actuator 3 is fixedly connected on the top of frame 1, and namely cylinder body is fixedly connected on the top of frame 1; The clutch end of described actuator 3 is connected with pressure plate structure 2, and namely the piston rod of cylinder is connected with pressure plate structure 2; Described frock 4 is slidingly fitted on the needle plate structure 5; Described needle plate structure 5 is located at the bottom of frame 1.
Described pressure plate structure 2 comprises a fixed mount 2.1, first pressing plate 2.2 and second pressing plate 2.3; The clutch end of described actuator 3 is fixedlyed connected with the fixed head 2.4 on the fixed mount 2.1, and namely the piston rod of cylinder is fixedlyed connected with the fixed head 2.4 on the fixed mount 2.1; Described fixed mount 2.1 is provided with the two-layer step 2.5 that supplies first pressing plate 2.2 and second pressing plate 2.3 to place respectively, and step is made up of left step 2.51 and right step 2.52, and described left step 2.51 and right step 2.52 are on same surface level; Described first pressing plate 2.2 is located on the step 2.5 on top; Described second pressing plate 2.3 is located on the step 2.5 of bottom; Described fixed head 2.4 is provided with a plurality of screws 2.6, and described screw 2.6 passes fixed head 2.4 and is connected on first pressing plate 2.2, but by rotary screw 2.6 free liftings first pressing plate 2.2; Described first pressing plate 2.2 has many pillars 2.7; Described many pillars 2.7 be against second pressing plate 2.3 above, can freely change second pressing plate 2.3 by rising first pressing plate 2.2; Be provided with a plurality of thimbles 2.8 below described second pressing plate 2.3, a plurality of thimbles 2.8 are pushed down electric energy meter PCBA plate when pressure plate structure 2 descends, frock 4 descends.
Described frock 4 comprises dull and stereotyped 4.1 and two right angle limited blocks 4.2, and described dull and stereotyped 4.1 middle part is provided with a window 4.3, and many electric test pins 5.2 can stretch out by window 4.3; Described right angle limited block 4.2 is fixedly mounted on dull and stereotyped 4.1; The described electric energy meter PCBA plate of test that needs is limited between two right angle limited blocks 4.2.
Described needle plate structure 5 comprises an electric test plate 5.1 and Duo Gen electric test pin 5.2, and described many electric test pins 5.2 are connected electrically on the electric test plate 5.1, and electric test plate 5.1 is by being bolted on the frame 1; Electric test plate 5.1 is connected with control device with power supply, to be used for detecting electric energy meter PCBA plate.
Described electric test plate 5.1 is provided with many guide pillars 6, and described dull and stereotyped 4.1 are provided with for the many through holes 7 that guide pillar 6 is slidingly matched; Described guide pillar 6 passes through hole 7 and is connected with stop screw 8; Also be connected with many back-moving springs 9 between the described electric test plate 5.1 and dull and stereotyped 4.1.
During work, the electric energy meter PCBA plate that at first will test is located in the middle of two right angle limited blocks 4.2, cylinder operation then, cylinder rod drives pressure plate structure 2 and moves downwards, make pressure plate structure 2 promotion electric energy meter PCBA plates, frock move downwards, back-moving spring 9 is compressed, and electric test pin 5.2 is against on the electric connection point of electric energy meter PCBA plate, begins test; After test was finished, cylinder rod drove upwards action of pressure plate structure 2, and electric energy meter PCBA plate, frock reset under the effect of back-moving spring 9, take out electric energy meter PCBA plate at last and get final product.
Below only be described with regard to most preferred embodiment of the present utility model, but can not be interpreted as it is limitations on claims.The utility model is not limited only to above embodiment, and its concrete structure allows to change.In every case the various variations of doing in the protection domain of the utility model independent claims are all in protection domain of the present utility model.

Claims (6)

1. FCT multistation proving installation, it is characterized in that: comprise frame (1) and a plurality of single station proving installation for an electric energy meter PCBA of disposable test plate, described a plurality of single station proving installations all are arranged on the frame (1).
2. FCT multistation proving installation according to claim 1 is characterized in that: described single station proving installation comprises that a pressure plate structure (2), that is used for pressing down electric energy meter PCBA plate is used for driving frock (4) and a needle plate structure (5) that is used for providing power supply and signal to electric energy meter that the actuator (3) of pressure plate structure (2) knee-action, is placed for electric energy meter PCBA plate; Described actuator (3) is fixedly connected on the top of frame (1); The clutch end of described actuator (3) is connected with pressure plate structure (2); Described frock (4) is slidingly fitted on the needle plate structure (5); Described needle plate structure (5) is located at the bottom of frame (1).
3. FCT multistation proving installation according to claim 2, it is characterized in that: described pressure plate structure (2) comprises a fixed mount (2.1), first pressing plate (2.2) and second pressing plate (2.3); The clutch end of described actuator (3) is fixedlyed connected with the fixed head (2.4) on the fixed mount (2.1); Described fixed mount (2.1) is provided with the two-layer step (2.5) that supplies first pressing plate (2.2) and second pressing plate (2.3) to place respectively; Described first pressing plate (2.2) is located on the step (2.5) on top; Described second pressing plate (2.3) is located on the step (2.5) of bottom; Described fixed head (2.4) is provided with a plurality of screws (2.6), and described screw (2.6) passes fixed head (2.4) and is connected on first pressing plate (2.2); Described first pressing plate (2.2) has many pillars (2.7); Described many pillars (2.7) be against second pressing plate (2.3) above; Be provided with a plurality of thimbles (2.8) below described second pressing plate (2.3).
4. FCT multistation proving installation according to claim 2, it is characterized in that: described frock (4) comprises a flat board (4.1) and two right angle limited blocks (4.2), the middle part of described flat board (4.1) is provided with a window (4.3), and described right angle limited block (4.2) is fixedly mounted on the flat board (4.1); The described electric energy meter PCBA plate of test that needs is limited between two right angle limited blocks (4.2).
5. FCT multistation proving installation according to claim 4, it is characterized in that: described needle plate structure (5) comprises an electric test plate (5.1) and many electric test pins (5.2), and described many electric test pins (5.2) are connected electrically on the electric test plate (5.1).
6. FCT multistation proving installation according to claim 5, it is characterized in that: described electric test plate (5.1) is provided with many guide pillars (6), and described flat board (4.1) is provided with the through hole (7) that is slidingly matched for many guide pillars (6); Described guide pillar (6) passes through hole (7) and is connected with stop screw (8); Also be connected with many back-moving springs (9) between described electric test plate (5.1) and dull and stereotyped (4.1).
CN 201320027776 2013-01-18 2013-01-18 Final circular test (FCT) multi-station test device Withdrawn - After Issue CN203217050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320027776 CN203217050U (en) 2013-01-18 2013-01-18 Final circular test (FCT) multi-station test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320027776 CN203217050U (en) 2013-01-18 2013-01-18 Final circular test (FCT) multi-station test device

Publications (1)

Publication Number Publication Date
CN203217050U true CN203217050U (en) 2013-09-25

Family

ID=49206575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320027776 Withdrawn - After Issue CN203217050U (en) 2013-01-18 2013-01-18 Final circular test (FCT) multi-station test device

Country Status (1)

Country Link
CN (1) CN203217050U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103091622A (en) * 2013-01-18 2013-05-08 宁波三星电气股份有限公司 Final circular test (FCT) multi-station test device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103091622A (en) * 2013-01-18 2013-05-08 宁波三星电气股份有限公司 Final circular test (FCT) multi-station test device
CN103091622B (en) * 2013-01-18 2015-09-30 宁波三星智能电气有限公司 FCT multistation proving installation

Similar Documents

Publication Publication Date Title
CN103091624B (en) Based on the method for testing of FCT multistation proving installation
CN201903626U (en) Pneumatic testing device
CN203630166U (en) Testing clamp
CN203490341U (en) Safe and reliable PCBA (printed circuit board assembly) test device
CN103091622A (en) Final circular test (FCT) multi-station test device
CN103091623A (en) Final circular test (FCT) multi-station test machine
CN202110109U (en) Device used for testing life of key switch
CN103196485B (en) Insulator hydraulic pressure test device
CN203217050U (en) Final circular test (FCT) multi-station test device
CN203217049U (en) Final circular test (FCT) multi-station test machine
CN204044282U (en) A kind of proving installation of pcb board
CN204903683U (en) Needle support plate module accredited testing organization
CN203027328U (en) Mobile phone radio frequency test device
CN204101682U (en) Vacuum circuit breaker pressure resistant testing device
CN203572927U (en) Testing device of anti-detachment function in mainboard
CN102590672A (en) Novel function test jig of PCB (printed circuit board)
CN204287408U (en) A kind of drive plate test fixture
CN102366808A (en) Rivet omission detection device
CN102928671B (en) Testing method of printed wiring board conductive ink resistance value
CN204177914U (en) A kind of terminal voltage resistance insulation testing device
CN203595916U (en) Single-phase meter MCU chip batch writing device
CN203858270U (en) Open-circuit and short-circuit test support of circuit board
CN203929373U (en) A kind of mattress spring fatigue life test machine
CN202522640U (en) Novel function test jig of PCB (printed circuit board)
CN202453514U (en) Device for checking whether in lack of rivet or not before assembling and riveting bearing retainer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130925

Effective date of abandoning: 20150930

RGAV Abandon patent right to avoid regrant