CN203200763U - Novel HSW working pile method foundation pit timbering structure - Google Patents

Novel HSW working pile method foundation pit timbering structure Download PDF

Info

Publication number
CN203200763U
CN203200763U CN 201320064396 CN201320064396U CN203200763U CN 203200763 U CN203200763 U CN 203200763U CN 201320064396 CN201320064396 CN 201320064396 CN 201320064396 U CN201320064396 U CN 201320064396U CN 203200763 U CN203200763 U CN 203200763U
Authority
CN
China
Prior art keywords
shaped steel
sheet pile
steel sheet
hsw
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320064396
Other languages
Chinese (zh)
Inventor
李仁民
余巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN 201320064396 priority Critical patent/CN203200763U/en
Application granted granted Critical
Publication of CN203200763U publication Critical patent/CN203200763U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a novel HSW working pile method foundation pit timbering structure, and relates to the technical field of geotechnical engineering in civil engineering, in particular to the technical field of a construction technology which combines H-shaped steel and steel sheet pile composite piles. The novel HSW working pile method foundation pit timbering structure comprises a broken stone cushion layer for reinforcing the earth surface and a steel sheet pile, wherein the steel sheet pile is arranged perpendicular to the broken stone cushion layer and penetrates through the broken stone cushion layer. The H-shaped steel which is perpendicular to the broken stone cushion layer is arranged on one side of the steel sheet pile, and H-shaped steel guide beams and H-shaped steel guide piles are sequentially arranged on the side, away from the steel sheet pile, of the H-shaped steel, wherein the H-shaped steel guide beams are used for controlling locating accuracy of the H-shaped steel, and the H-shaped steel guide piles are used for limiting the movement of the H-shaped steel guide beams. The novel HSW working pile method foundation pit timbering structure achieves the purposes of being large in structural rigidity, capable of protecting environment and being used cyclically, short in construction period, and low in manufacturing cost.

Description

A kind of novel HSW worker's stake method foundation pit supporting construction
Technical field
The utility model relates to the technical field of geotechnical engineering in the civil engineering, relates in particular to the technical field of the construction technology that H shaped steel is combined with the steel sheet pile compound pile.
Background technology
Steel sheet pile has quick construction, and steel sheet pile can be pulled out after foundation pit construction finished, and is recycling, the characteristics such as better economy.But because the anti-side direction degree of steel sheet pile less is out of shape larger.Having relatively high expectations and dig in surrounding enviroment should be less in the dark larger base pit engineering.
H shaped steel is that a kind of section area distribution ratio is optimized, the rational economic section high efficiency section bar of the ratio of strength to weight.Owing to all arrange with the right angle in each position of H shaped steel, so H shaped steel all has on all directions, and bending resistance is strong, construction is simple, save the advantages such as cost and lightweight construction, is mainly used in the stake of SMW engineering method in the base pit engineering at present.H shaped steel itself does not have snap close, is used for base pit engineering and only can keeps off soil, can not sealing.
For steel sheet pile and H shaped steel characteristics, Southeast China University has applied for that on April 9th, 2012 patent No. is 201220144932.X, and the utility model name is called: the patent application of " a kind of steel sheet pile and H shaped steel combination foundation pit supporting construction ".This engineering method has merged the advantage of sheet pile and H shaped steel, and has overcome self-defect, for the application of steel work in the deep big foundation pit engineering provides solution.
Summary of the invention
The utility model purpose provides that a kind of rigidity of structure is large, environmental protection, reusable edible, the duration is short, cost is low novel HSW worker's stake method foundation pit supporting construction and job practices thereof.
A kind of novel HSW worker's stake method foundation pit supporting construction (H shaped steel and steel sheet pile combined foundation ditch support structure, H Piles and Steel Sheet Piles Wall, be called for short HSW engineering method pile pit supporting construction), comprise for the hardcore bed of reinforcing the earth's surface, pass the steel sheet pile of hardcore bed perpendicular to the hardcore bed setting, one side of steel sheet pile is arranged the H shaped steel perpendicular to hardcore bed, arranges successively for the H shaped steel nose girder of controlling H shaped steel positioning accuracy, is used for the H shaped steel guide pile that restriction H shaped steel nose girder moves away from a side of steel sheet pile on the H shaped steel.
Job practices based on novel HSW worker's stake method foundation pit supporting construction of the present utility model comprises the steps:
The first step: comprehensive base pit engineering scale, surrounding enviroment condition, hydrogeological conditions, computational analysis determine that the model of steel sheet pile, H shaped steel, stake are long, lengthwise position, pile spacing;
Second step: lay hardcore bed on the surface, earth's surface, according to the design axis, get two of surperficial parallel installations with hardcore bed and be used for the steel sheet pile guide pile that restriction steel sheet pile nose girder moves vertical, two steel sheet pile guide piles are installed two steel sheet pile nose girders that are used for controlling the steel sheet pile positioning accuracy;
The 3rd step: adopt crawler crane between two steel sheet pile nose girders, to be pressed into steel sheet pile in conjunction with modes such as hydraulic vibration driver, static-pressure pile planting machines;
The 4th step: remove steel sheet pile guide pile, steel sheet pile nose girder, in a side of steel sheet pile H shaped steel guide pile, H shaped steel nose girder are installed;
The 5th step: adopt crawler crane between steel sheet pile and H shaped steel nose girder, to be pressed into H shaped steel in conjunction with the hydraulic vibration driver mode;
The 6th step: press the construction of design of foundation pit operating mode;
The 7th step: backfill, extract steel sheet pile, H shaped steel.
The utility model adopts technique scheme, compared with prior art have following advantage: the utility model adopts the structure of steel sheet pile and H shaped steel combination, kept not only that the bending resistance that H shaped steel itself has is strong, construction is simple, save the advantages such as cost and lightweight construction, simultaneously also overcome H shaped steel and itself do not had snap close, be used for base pit engineering and only can keep off soil, problem that can not sealing, thus the utility model is on form of structure and job practices has obtained that the rigidity of structure is large, environmental protection, reusable edible, the duration is short, cost is low advantage.
Description of drawings
Fig. 1 is the plan view of construction steel sheet pile 3.
Fig. 2 is the sectional drawing of construction steel sheet pile 3.
Fig. 3 is the plan view of construction H shaped steel 7.
Fig. 4 is the sectional drawing of construction H shaped steel 7.
The specific embodiment
Below in conjunction with accompanying drawing the technical solution of the utility model is elaborated:
As shown in Figure 3, Figure 4, a kind of novel HSW worker's stake method foundation pit supporting construction, comprise for the hardcore bed 4 of reinforcing the earth's surface, perpendicular to hardcore bed 4 steel sheet pile 3 that passes hardcore bed 4 is set, one side of steel sheet pile 3 is arranged the H shaped steel 7 perpendicular to hardcore bed 4, arranges successively for the H shaped steel nose girder 6 of controlling H shaped steel 7 positioning accuracies, is used for the H shaped steel guide pile 5 that restriction H shaped steel nose girder 6 moves away from a side of steel sheet pile 3 on the H shaped steel 7.
Such as Fig. 1, Fig. 2, Fig. 3, shown in Figure 4, the job practices based on novel HSW worker's stake method foundation pit supporting construction of the present utility model comprises the steps:
The first step: comprehensive base pit engineering scale, surrounding enviroment condition, hydrogeological conditions, computational analysis determine that the model of steel sheet pile 3, H shaped steel 7, stake are long, lengthwise position, pile spacing;
Second step: lay hardcore bed 4 on the surface, earth's surface, according to the design axis, vertical and hardcore bed 4 two of surperficial parallel installations are used for 1, two steel sheet pile guide pile of steel sheet pile guide pile 1 that restriction steel sheet pile nose girder 2 moves two steel sheet pile nose girders 2 that are used for controlling steel sheet pile 3 positioning accuracies are installed;
The 3rd step: adopt crawler crane between two steel sheet pile nose girders 2, to be pressed into steel sheet pile 3 in conjunction with modes such as hydraulic vibration driver, static-pressure pile planting machines;
The 4th step: remove steel sheet pile guide pile 1, steel sheet pile nose girder 2, in a side of steel sheet pile 3 H shaped steel guide pile 5, H shaped steel nose girder 6 are installed;
The 5th step: adopt crawler crane between steel sheet pile 3 and H shaped steel nose girder 6, to be pressed into H shaped steel 7 in conjunction with the hydraulic vibration driver mode;
The 6th step: press the construction of design of foundation pit operating mode;
The 7th step: backfill, extract steel sheet pile 3, H shaped steel 7.

Claims (1)

1. novel HSW worker's stake method foundation pit supporting construction, it is characterized in that comprising the hardcore bed (4) for reinforcing the earth's surface, pass the steel sheet pile (3) of hardcore bed (4) perpendicular to hardcore bed (4) setting, one side of steel sheet pile (3) is arranged the H shaped steel (7) perpendicular to hardcore bed (4), and H shaped steel (7) is upper to be arranged successively for the H shaped steel nose girder (6) of controlling H shaped steel (7) positioning accuracy, be used for the mobile H shaped steel guide pile (5) of restriction H shaped steel nose girder (6) away from a side of steel sheet pile (3).
CN 201320064396 2013-02-05 2013-02-05 Novel HSW working pile method foundation pit timbering structure Expired - Fee Related CN203200763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320064396 CN203200763U (en) 2013-02-05 2013-02-05 Novel HSW working pile method foundation pit timbering structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320064396 CN203200763U (en) 2013-02-05 2013-02-05 Novel HSW working pile method foundation pit timbering structure

Publications (1)

Publication Number Publication Date
CN203200763U true CN203200763U (en) 2013-09-18

Family

ID=49144887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320064396 Expired - Fee Related CN203200763U (en) 2013-02-05 2013-02-05 Novel HSW working pile method foundation pit timbering structure

Country Status (1)

Country Link
CN (1) CN203200763U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114596A (en) * 2013-02-05 2013-05-22 东南大学 Novel heated steering wheel (HSW) working pile method formation pit timbering structure and construction method thereof
CN106120710A (en) * 2016-06-28 2016-11-16 河海大学 A kind of I shape composite steel plate pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114596A (en) * 2013-02-05 2013-05-22 东南大学 Novel heated steering wheel (HSW) working pile method formation pit timbering structure and construction method thereof
CN106120710A (en) * 2016-06-28 2016-11-16 河海大学 A kind of I shape composite steel plate pile

Similar Documents

Publication Publication Date Title
CN202559359U (en) Foundation pit supporting structure combined by steel sheet pile and H-shaped steel
CN105672353B (en) A kind of cast-in-place diaphram wall and assembled metro station construction integral method
CN103061346A (en) Steel plate pile utilizing bolt connection and H-shaped combined foundation pit support structure
CN201972155U (en) Topdown-construction-method foundation pit supporting structure of steel plate pile
CN202689009U (en) Steel sheet pile and tubular pile combined foundation pit supporting structure
CN106351331A (en) Multi-floor basement reverse and normal combined construction process
CN205806684U (en) A kind of across base pit engineering conduit wiring suspension structure
CN203229955U (en) Foundation pit enclosure structure allowing supporting while excavating
CN103397634A (en) Anchoring construction method for fastener steel tube pile cofferdam
CN102995643A (en) Underground-space steel truss foundation pit supporting structure and construction method thereof
CN104532856A (en) Fabricated lattice unit for foundation pit supporting and installation method
CN203200763U (en) Novel HSW working pile method foundation pit timbering structure
CN204875789U (en) Building engineering piling equipment
CN109056534B (en) Movable cast-in-situ bored pile construction platform and method
CN103132465A (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN202745063U (en) Deep foundation pit steel plate pile and anchor cable shoring system construction structure
CN103114596A (en) Novel heated steering wheel (HSW) working pile method formation pit timbering structure and construction method thereof
CN111877365A (en) H-shaped steel combined steel sheet pile continuous wall combined supporting system and construction method thereof
CN106400814A (en) Foundation pit supporting method
CN204040042U (en) A kind of super large ultra-deep support with manually dug piles structure
CN203530959U (en) High-strength underground diaphragm wall
CN201901876U (en) Steel sheet pile inversely-constructed foundation ditch supporting structure
CN204435389U (en) A kind of assembled lattice unit for pattern foundation pit supporting structure
CN203200758U (en) Combined foundation pit supporting structure adopting steel sheet piles and H-shaped steel which are connected through bolts
CN205012347U (en) Step supporting construction that three campsheds and single pile cluster closed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130918

Termination date: 20160205