CN203188582U - Brick wall ash scraping device - Google Patents
Brick wall ash scraping device Download PDFInfo
- Publication number
- CN203188582U CN203188582U CN 201320227392 CN201320227392U CN203188582U CN 203188582 U CN203188582 U CN 203188582U CN 201320227392 CN201320227392 CN 201320227392 CN 201320227392 U CN201320227392 U CN 201320227392U CN 203188582 U CN203188582 U CN 203188582U
- Authority
- CN
- China
- Prior art keywords
- brick wall
- flat board
- shovel
- ash scraping
- dull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a brick wall ash scraping device which is used for conducting ash scraping operation on the surface of a newly-built brick wall. According to the technical scheme, the brick wall ash scraping device comprises a handle and an ash scraping portion, wherein the handle and the ash scraping portion are fixedly connected. The brick wall ash scraping device is characterized in that the ash scraping portion is a flat board. A protruding shovel opening is formed in the middle of the front end portion of the flat board in the width direction and is arranged in the length direction of the flat board. The shovel opening and the handle are arranged at the two sides of the flat board respectively. After ash scraping operation is conducted on the newly-built brick wall by the ash scraping device, the surface of the whole brick wall is tidy and following machining of the surface of the brick wall is facilitated.
Description
Technical field
The utility model relates to a kind of being used for the brickwork joint of the wall of newly laying bricks and the brick face in the brickwork joint outside is picked the grey device of picking of ash manipulation in building construction process.
Background technology
Generally be to utilize lime or mortar to lay bricks, when laying bricks wall, because manual work, lime in the brickwork joint of brick wall or the amount of mortar are difficult to keep consistency, remain on the same horizon and need have with laying bricks of one deck as far as possible, unnecessary lime or mortar will be laid bricks and spill on the metope along with the bricklayer knocks, or protrude into the outside of brickwork joint.When metope being carried out follow-up levelling whitewash, these ridges can have influence on the speed of metope subsequent job.And because can there be ridge in some place of metope, some place is then comparatively clean, after the metope levelling, be used for the cement of levelling or lime coating at the thinner thickness at ridge place, then thickness is thicker relatively in the place that does not have ridge, this can have influence on the quality of these coatings, and coating easily the irregular phenomenon of metope can occur because of the difference of thickness, even some places can produce bulge.Therefore, be necessary the wall of newly laying bricks is picked ash manipulation.
Summary of the invention
For achieving the above object, the utility model technical issues that need to address are: provide a kind of brick wall to pick grey device, it is simple in structure that this picks grey device, can conveniently be used for the wall of newly laying bricks is picked ash manipulation, to guarantee the planarization on brick wall surface.
The technical scheme that solve the technical problem: a kind of brick wall picks grey device, comprise the handle that is fixed together and pick grey portion, it is characterized in that, describedly pick grey portion for dull and stereotyped, be formed with the shovel mouth of protrusion at the medium position place of this flat board leading section width, shovel mouthful length direction setting along flat board, the shovel mouth is listed in dull and stereotyped relative both sides with the handle branch.Utilize and originally pick grey device when the wall of newly laying bricks is picked ash manipulation, hold handle, the shovel mouth is inserted in the brickwork joint, and advances along the trend of brickwork joint, shovel mouthful shovels the mortar in the brickwork joint or lime to be scraped, and the relative two side portions at shovel mouthful flat board on is scraped mortar or the lime that adheres on the brick face for shoveling.Can be used for that the shovel that shovel scrapes off is scraped thing and collect by following case is set at flat board, also can allow these shovels scrape thing and directly drop on the ground.Originally pick grey device and generally can only be applied on the brick wall of new block, that is to say before lime or mortar solidify fully metope is picked ash.Can design in advance by the width to the shovel mouth, make when picking ash manipulation, the shovel mouth can be inserted in the brickwork joint fully, scrapes so that other dull and stereotyped position can be shoveled the brick face in the brickwork joint outside.
The truncation surface of described shovel mouth is curved.Lay bricks after forming metope, the width of brickwork joint can produce different variations throughout, and the shovel mouth of arc can adapt to this variation well, scrapes the influence of effect thereby can reduce this shovel that brings that changes as far as possible.
The width of described shovel mouth and depth dimensions diminish to inner end gradually Zi the outer end of shovel mouth.This is conducive to the mortar or the lime that scrape off of shoveling and builds up toward dull and stereotyped going up.
The rearward end of described shovel mouth is positioned on the dull and stereotyped surface.Further improved mortar and lime and be accumulated to speed on the flat board, the obstruction that can avoid shoveling mouthful.
Described flat board is provided with case, and case only is formed with opening at the front end place of flat board, and handle is connected on the case.Arrange case can to the shovel lime that scrapes off or mortar collects so that recycling can cut the waste.
The utility model compared with prior art has following beneficial effect: the new face of building a wall is shoveled scrape by originally picking grey device, can effectively remove bur on the brick face and the ridge in the brickwork joint, this is conducive to the subsequent treatment to metope.Shovel mouthful is used for brickwork joint shoveled to be scraped, and the relative two side portions of shovel mouthful can be shoveled the bur on the brick face outside the brickwork joint and be scraped flat board on, thereby can effectively guarantee originally to pick the result of use of grey device, good through the cleaning of originally picking the metope integral body after the grey device processing.
Description of drawings
Fig. 1 is the structure chart that this brick wall picks grey device.
The specific embodiment
See among the figure that the utility model brick wall picks part that grey device plays a major role for dull and stereotyped 5, is provided with the shovel mouth 6 of protrusion at the medium position place of dull and stereotyped 5 leading section widths, the length direction settings of shovel mouthfuls 6 along dull and stereotyped 5.Flat board 5 is connected by the body of rod 2 with handle 1, and handle 1 was listed in relative both sides of dull and stereotyped 5 in 6 minutes with the shovel mouth.
Shovel mouthfuls 6 is formed by dull and stereotyped 5 modes through punching presses, the wall body of shovel mouthfuls 6 and wall thickness such as dull and stereotyped 5, and shovel mouthfuls 6 protrudes into the dorsal part of flat board 5.
The truncation surface of shovel mouthfuls 6 is curved, and the degree of depth and the width dimensions of shovel mouthfuls 6 diminish to inner end gradually from the outer end, and shovel mouthfuls 6 intersects at dull and stereotyped 5 front, and the inner end of shovel mouthfuls 6 is positioned on the front of flat board 5.
Dull and stereotyped 5 are provided with case 3, and this case 3 only has opening 4 at dull and stereotyped 5 leading section, thereby make and formed the box-like body of a sealing originally picking the grey portion of picking of grey device, and this box-like body has an opening 4 in dull and stereotyped 5 front end.Case 3 is by with dull and stereotyped 5 three side plates that are connected as a single entity and be coated with a panel at these three side plates and constitute, and described handle 1 is connected on the case 3 by the body of rod 2.
Above-described embodiment is the technical scheme of the utility model the best, is not the utility model is done any pro forma restriction, also has other variant and remodeling under the prerequisite that does not exceed the technical scheme that claim puts down in writing.
The content that is not described in detail in this manual belongs to the those skilled in the art known prior art.
Claims (5)
1. a brick wall picks grey device, comprise the handle that is fixed together and pick grey portion, it is characterized in that, describedly pick grey portion for dull and stereotyped, be formed with the shovel mouth of protrusion at the medium position place of this flat board leading section width, shovel mouthful length direction setting along flat board, the shovel mouth is listed in dull and stereotyped relative both sides with the handle branch.
2. brick wall according to claim 1 picks grey device, it is characterized in that, the truncation surface of described shovel mouth is curved.
3. brick wall according to claim 2 picks grey device, it is characterized in that, the width of described shovel mouth and depth dimensions diminish to inner end gradually Zi the outer end of shovel mouth.
4. brick wall according to claim 3 picks grey device, it is characterized in that, the rearward end of described shovel mouth is positioned on the dull and stereotyped surface.
5. pick grey device according to claim 1,2,3 or 4 described brick walls, it is characterized in that described flat board is provided with case, case only is formed with opening at the front end place of flat board, and handle is connected on the case.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320227392 CN203188582U (en) | 2013-04-29 | 2013-04-29 | Brick wall ash scraping device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320227392 CN203188582U (en) | 2013-04-29 | 2013-04-29 | Brick wall ash scraping device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203188582U true CN203188582U (en) | 2013-09-11 |
Family
ID=49105449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320227392 Expired - Lifetime CN203188582U (en) | 2013-04-29 | 2013-04-29 | Brick wall ash scraping device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203188582U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015193658A1 (en) * | 2014-06-16 | 2015-12-23 | Pink Colin Ian | Brickwork cavity cleaning tool |
-
2013
- 2013-04-29 CN CN 201320227392 patent/CN203188582U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015193658A1 (en) * | 2014-06-16 | 2015-12-23 | Pink Colin Ian | Brickwork cavity cleaning tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203188582U (en) | Brick wall ash scraping device | |
CN206737449U (en) | A kind of masonry mortar paving slurry disk | |
CN206233607U (en) | For the mortar joint control device of masonry panel | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN210369971U (en) | Quick box-shaped trowel building tool | |
CN206815869U (en) | Simple paving hawk | |
CN206368543U (en) | A kind of masonry wall makees seam device | |
CN216109568U (en) | Construction tool for quick pointing of building block wall | |
CN202627456U (en) | Darby for building wall construction | |
CN206000138U (en) | A kind of multiple tooth scraper of tile laying | |
CN103628406B (en) | Frame bridge butted part Construction for waterproofing treatment method | |
CN205189370U (en) | Novel rasp sword | |
CN207647209U (en) | A kind of shovel wall device of adjustable in length | |
CN204199726U (en) | To build a wall pointing device | |
CN206667498U (en) | Improve the construction of the concrete dry wall metope accumulation of salt in the surface soil using polypropylene breather pipe | |
CN201714102U (en) | Multifunctional construction tool | |
CN205025067U (en) | A pointer that is used for outer wall argil face brick and building block | |
CN208023911U (en) | Wall surface strickle-off device | |
CN209891743U (en) | Quality control ruler for dry wall | |
CN213359460U (en) | Novel cleaver | |
CN107100355A (en) | A kind of jointing method | |
CN206941671U (en) | Backacter bucket clean-up scraper and backacter | |
CN213143940U (en) | Mortar joint ploughing construction device for wall repair | |
CN216616920U (en) | Multifunctional mortar shovel for masonry of filler wall | |
CN203334638U (en) | Scraper device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130911 |
|
CX01 | Expiry of patent term |