CN203188345U - Fast assembled inspection well formed by concrete in pouring mode - Google Patents

Fast assembled inspection well formed by concrete in pouring mode Download PDF

Info

Publication number
CN203188345U
CN203188345U CN 201320178216 CN201320178216U CN203188345U CN 203188345 U CN203188345 U CN 203188345U CN 201320178216 CN201320178216 CN 201320178216 CN 201320178216 U CN201320178216 U CN 201320178216U CN 203188345 U CN203188345 U CN 203188345U
Authority
CN
China
Prior art keywords
well
assembled
assembling
gutter channel
channel base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320178216
Other languages
Chinese (zh)
Inventor
孙增明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320178216 priority Critical patent/CN203188345U/en
Application granted granted Critical
Publication of CN203188345U publication Critical patent/CN203188345U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to an assembled inspection well and belongs to the technical field of drainage communal facilities used on roads or in parks. A fast assembled inspection well formed by concrete in a pouring mode is assembled by a gutter channel base, an assembled wellbore body and a mouth well body in a matching mode in sequence from bottom to top, wherein V-shaped grooves are formed in the upper mouth of the gutter channel base and in the upper mouth of the assembled wellbore body, bosses are arranged on the lower mouth of the assembled wellbore body and on the lower mouth of the mouth well body, the bosses are matched with the V-shaped grooves, a reserved pipeline installation hole is formed in the gutter channel base, and hoisting holes and crawling ladder inserting holes are formed both in the assembled wellbore body and in the mouth well body. According to the fast assembled inspection well formed by concrete in the pouring mode, the whole well body is composed of the gutter channel base, the assembled wellbore body and the mouth well body, different types of gutter channel bases with various sizes, different types of assembled wellbore bodies with various sizes and different types of mouth well bodies with various sizes are formed by concrete in the pouring mode, and a proper type of gutter channel base with a suitable size, a proper type of assembled wellbore body with a suitable size and a proper type of mouth well body with a suitable size are selected to be assembled together to build the inspection well fast according to the height requirements of a specific well body; time and labor are saved, construction period is shortened, construction efficiency is improved, and the fast assembled inspection well is firm and convenient to install.

Description

Concreting moulding speed assembling manhole
Technical field
The utility model relates to a kind of speed assembling manhole, belongs to road and garden draining communal facilities technical field.
Background technology
Drainage inspection well is to be on the sewerage system also to work the draught effect that connects pipeline section and pipe-line system simultaneously by the inspection shaft that checks and the cleaning pipeline is set up.Existing sewage, rainwater inspection well adopt site operation to build basically.Because the operating mode difference of various job sites adopts the manhole of traditional approach building to need to design according to concrete working condition, the effort of taking a lot of work, difficulty of construction is big, and is long in time limit, and operating efficiency is low; And in actual operation and maintenance process, there are a lot of problems in the manhole unreasonable structure of building out.
The utility model content
The purpose of this utility model is in order to solve the above-mentioned problems in the prior art, a kind of concreting moulding speed assembling manhole is provided, whole manhole is divided into several assemblies, during installation, only assemble as requested with building the assembly that makes, can quick constructed manhole.
For achieving the above object, the technical solution adopted in the utility model is: a kind of concreting moulding speed assembling manhole, by moulding gutter channel base, assembling pit shaft body, well head well body is supporting successively from bottom to top assembles; The V groove that is provided with suitable for reading of moulding gutter channel base and assembling pit shaft body; The end opening of assembling pit shaft body and well head well body is provided with boss; Described boss and V groove fit are installed; Described moulding gutter channel base is provided with reserves the pipeline installing hole; Described assembling pit shaft body and well head well body are provided with reserves the cat ladder socket; Described moulding gutter channel base, assembling pit shaft body, well head well body hole for hoist are equipped with hole for hoist.
Described well head well body top is provided with reserves fixedly well lid bolt.
Described assembling pit shaft body is provided with reserves the pipeline installing hole.
As a kind of optimal way of the present utility model, the interior diameter of described moulding gutter channel base has three kinds of 900mm, 1000mm and 1200mm.
As a kind of optimal way of the present utility model, the internal diameter of described assembling pit shaft body has three kinds of 900mm, 1000mm and 1200mm.
As a kind of optimal way of the present utility model, the height of described assembling pit shaft body has six kinds of 100mm, 150mm, 200,250mm, 300mm and 600mm.
As a kind of optimal way of the present utility model, described well head well body is divided into: four limit closing in well head well bodies and three limit closing in decentralized wellhead well bodies.
As a kind of optimal way of the present utility model, described moulding gutter channel base is divided into: shapes such as linear pattern, turning type, left and right sides Y-shaped, individual font, adopt the concreting moulding, and be convenient to flowing water trend and cleaning.
Concreting moulding speed assembling manhole of the present utility model, whole well body is divided into moulding gutter channel base, assembling pit shaft body and three parts of well head well body, build up multiple different size model with concrete casting respectively, well body according to differing heights is selected, select for use the suitable dimensions model to assemble, can build manhole fast; Save labor, can shorten the construction period, improve efficiency of construction, firm, the bearing strength height, easy for installation.
Description of drawings
Fig. 1 is a kind of assembling schematic diagram (three limit closing in decentralized wellhead well body manholes) of concreting moulding speed assembling manhole of the present utility model;
Fig. 2 is the moulding gutter channel base schematic diagram of concreting moulding speed assembling manhole of the present utility model;
Fig. 3 is the assembling pit shaft body schematic diagram of concreting moulding speed assembling manhole of the present utility model
Fig. 4 is the well head well body schematic diagram of concreting moulding speed assembling manhole of the present utility model;
Fig. 5 is the another kind assembling schematic diagram (four limit closing in well head well body manholes) of concreting moulding speed assembling manhole of the present utility model;
Fig. 6 is boss and V groove fit scheme of installation.
The specific embodiment
Embodiment 1 as shown in Figure 1, a kind of concreting moulding speed assembling manhole is by moulding gutter channel base 1, assembling pit shaft body 2, well head well body 3 is supporting successively from bottom to top assembles; Fig. 2~shown in Figure 4, the V groove 8 that is provided with suitable for reading of moulding gutter channel base 1 and assembling pit shaft body 2; The end opening of assembling pit shaft body 2 and well head well body 3 is provided with boss 7; Described boss 7 cooperates installation with V groove 8, as shown in Figure 6, the structure that the utility model adopts boss and V groove to match, when joint, cement mortar is divided evenly crowded, can reach the effect that cement mortar is full on the mating face, bonding is firm, water resistance is good; Described moulding gutter channel base 1 is provided with reserves pipeline installing hole 5; Described assembling pit shaft body 2 is provided with hole for hoist 6 and reserves cat ladder socket 4; Described well head well body 3 is provided with reserves cat ladder socket 4 and hole for hoist 6.The well head well body 3 of present embodiment is three limit closing in decentralized wellhead well bodies.
The interior diameter of moulding gutter channel base has three kinds of 900mm, 1000mm and 1200mm; The internal diameter of assembling pit shaft body has three kinds of 900mm, 1000mm and 1200mm; The height of assembling pit shaft body has six kinds of 100mm, 150mm, 200mm, 250mm, 300mm and 600mm.The concreting moulding of present embodiment speed assembling manhole is chosen: the internal diameter of moulding gutter channel base is 900mm, and the internal diameter of assembling pit shaft body is 900mm, highly for 100mm and 200mm respectively one describe for example.
Embodiment 2 as shown in Figure 5, concreting moulding speed assembling manhole is by moulding gutter channel base 11, assembling pit shaft body 12, well head well body 13 is supporting successively from bottom to top assembles; The V groove that is provided with suitable for reading of moulding gutter channel base 11 and assembling pit shaft body 12; The end opening of assembling pit shaft body 12 and well head well body 13 is provided with boss; Described boss and V groove fit are installed; Described moulding gutter channel base 11 is provided with reserves pipeline installing hole 15; Described assembling pit shaft body 12 is provided with to be reserved hole for hoist 16, cat ladder socket 14 and stream pipeline installing hole 15 is arranged; Described well head well body 13 is provided with and is reserved with cat ladder socket 14, reserves well lid bolt 17 and hole for hoist.The well head well body 13 of present embodiment is four limit closing in well head well bodies.
The concreting moulding of present embodiment speed assembling manhole is chosen: the internal diameter of moulding gutter channel base is 1000mm, and the internal diameter of assembling pit shaft body is 1000mm, highly for 300mm and 600mm respectively one describe for example.
Concreting moulding speed assembling manhole of the present utility model is provided with reservation pipeline installing port at moulding gutter channel base, is used for installing the turnover gutter; Be provided with reservation cat ladder socket at assembling pit shaft body; The cat ladder socket be used for to be installed cat ladder, is beneficial to the later stage to go into the well and check or change assembly; Moulding gutter channel base, assembling pit shaft body, well head well body hole for hoist are equipped with hole for hoist, and when the effect of hole for hoist was installation, convenient mobile carrying was placed; Be provided with at well head well body and reserve cat ladder socket and fixing well lid bolt; Fixedly the effect of well lid bolt is after the manhole assembling is finished well lid to be fixed, minimizing is because of the loosening problems of bringing such as potential safety hazard of well lid, and fix at once and go up well lid, inconvenient situations such as prevention foreign material and personnel fall in the manhole, prevent that well lid from losing take place, and should not allow car damage by pressure and advantages such as excavator digs brokenly.

Claims (7)

1. concreting moulding speed assembling manhole is characterized in that: by moulding gutter channel base, assembling pit shaft body, well head well body is supporting successively from bottom to top assembles; The V groove that is provided with suitable for reading of moulding gutter channel base and assembling pit shaft body; The end opening of assembling pit shaft body and well head well body is provided with boss; Described boss and V groove fit are installed; Described moulding gutter channel base is provided with reserves the pipeline installing hole; Described assembling pit shaft body and well head well body are provided with reserves the cat ladder socket; Described moulding gutter channel base, assembling pit shaft body, well head well body hole for hoist are equipped with hole for hoist.
2. concreting moulding speed according to claim 1 is assembled manhole, it is characterized in that: described well head well body top is provided with reserves fixedly well lid bolt.
3. concreting moulding speed according to claim 1 is assembled manhole, it is characterized in that: described assembling pit shaft body is provided with reserves the pipeline installing hole.
4. according to each described concreting moulding speed assembling manhole of claim 1~3, it is characterized in that: the interior diameter of described moulding gutter channel base has three kinds of 900mm, 1000mm and 1200mm.
5. according to each described concreting moulding speed assembling manhole of claim 1~3, it is characterized in that: the internal diameter of described assembling pit shaft body has three kinds of 900mm, 1000mm and 1200mm.
6. according to each described concreting moulding speed assembling manhole of claim 1~3, it is characterized in that: the height of described assembling pit shaft body has six kinds of 100mm, 150mm, 200,250mm, 300mm and 600mm.
7. according to each described concreting moulding speed assembling manhole of claim 1~3, it is characterized in that: described well head well body is divided into: four limit closing in well head well bodies and three limit closing in decentralized wellhead well bodies.
CN 201320178216 2013-04-02 2013-04-02 Fast assembled inspection well formed by concrete in pouring mode Expired - Lifetime CN203188345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320178216 CN203188345U (en) 2013-04-02 2013-04-02 Fast assembled inspection well formed by concrete in pouring mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320178216 CN203188345U (en) 2013-04-02 2013-04-02 Fast assembled inspection well formed by concrete in pouring mode

Publications (1)

Publication Number Publication Date
CN203188345U true CN203188345U (en) 2013-09-11

Family

ID=49105213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320178216 Expired - Lifetime CN203188345U (en) 2013-04-02 2013-04-02 Fast assembled inspection well formed by concrete in pouring mode

Country Status (1)

Country Link
CN (1) CN203188345U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109279202A (en) * 2018-10-10 2019-01-29 南京宇创石化工程有限公司 A kind of magnalium feed bin with honeycomb

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109279202A (en) * 2018-10-10 2019-01-29 南京宇创石化工程有限公司 A kind of magnalium feed bin with honeycomb
CN109279202B (en) * 2018-10-10 2024-03-22 南京宇创石化工程有限公司 Aluminum-magnesium storage bin with honeycomb structure

Similar Documents

Publication Publication Date Title
CN205530344U (en) Utility tunnel is pour to split type no mould
CN207268009U (en) A kind of underground pipe gallery drainage system based on existing blowdown canal
CN204551532U (en) Assembling cable shaft
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN111608662A (en) Shaft oversized-diameter integral moving metal template
CN205259419U (en) Cavity body and hollow floor
CN203296069U (en) Round precast concrete inspection well
CN203188345U (en) Fast assembled inspection well formed by concrete in pouring mode
CN210263125U (en) Waterproof ecological retaining wall body of hydraulic engineering
CN218204555U (en) Assembled cable working well
CN2789993Y (en) Box type transformer substation base
CN203270608U (en) Prefabricated combined pipe rack
CN206956916U (en) A kind of buried type integrated prefabricated rainfall pumping station of super large cylinder
CN205576973U (en) Circular inspection shaft of prefabricated formula
CN202689365U (en) Prefabricated reinforced concrete roof gutter
CN202577351U (en) Multi-use combined plastic inspection well
CN202672331U (en) Prefabricated reinforced concrete circular grit well
CN202000463U (en) Prefabricated reinforced concrete drainage inspection well
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN202298870U (en) Inspection well with fixed ladder stands
CN202347639U (en) Inspection well with climbing ladder
CN202865870U (en) Large-scale plastic inspection well
CN203475578U (en) Novel inspection well
CN201972231U (en) Sewage inspection well
CN211113743U (en) Prefabricated piping lane and combination piping lane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130911

CX01 Expiry of patent term