CN203174806U - Building integral heat preservation outer wall - Google Patents

Building integral heat preservation outer wall Download PDF

Info

Publication number
CN203174806U
CN203174806U CN 201320067379 CN201320067379U CN203174806U CN 203174806 U CN203174806 U CN 203174806U CN 201320067379 CN201320067379 CN 201320067379 CN 201320067379 U CN201320067379 U CN 201320067379U CN 203174806 U CN203174806 U CN 203174806U
Authority
CN
China
Prior art keywords
building
integral heat
wall
plate
heat preservation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320067379
Other languages
Chinese (zh)
Inventor
陈开泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Union River Construction Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320067379 priority Critical patent/CN203174806U/en
Application granted granted Critical
Publication of CN203174806U publication Critical patent/CN203174806U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)
  • Building Environments (AREA)

Abstract

The utility model relates to a building outer wall, in particular to a building integral heat preservation outer wall. The building integral heat preservation outer wall comprises a vertical plate and building blocks. The inner side and the outer side of the lower end of the vertical plate are respectively fixed with a connecting plate, and fastening bolt installation holes are formed in the connecting plate on the inner side of the lower end of the vertical plate. The front side and the rear side of the connecting plate on the outer side of the lower end of the vertical plate are respectively fixed with a limiting plate, and the building blocks are fixedly installed on the connecting plate between the limiting plates from top to bottom. The building integral heat preservation outer wall is simple in structure and convenient to use. The building integral heat preservation outer wall is fixed with floors through the fastening bolt installation holes, and the prefabricated building blocks are adopted, so that expenditure is reduced and working efficiency is improved. Heat preservation plates are installed inside the building blocks, so that fire hidden dangers are reduced.

Description

The building integral heat preserving exterior wall
Technical field
The utility model relates to a kind of external wall, is a kind of building integral heat preserving exterior wall.
Background technology
At present, external wall all is to adopt manually to build by laying bricks or stones, like this, just has the quality instability, builds the high problem of cost by laying bricks or stones, and after exterior wall lays, also need heat-insulation wall plate be installed at exterior wall, but heat-insulation wall plate is not fire-resistant, therefore has serious disaster hidden-trouble.
Summary of the invention
The utility model provides a kind of building integral heat preserving exterior wall, has overcome the deficiency of above-mentioned prior art, and it can solve and manually build the problem that there are potential safety hazard in exterior wall quality instability, cost height and heat-insulation wall plate by laying bricks or stones.
The technical solution of the utility model is achieved like this: a kind of building integral heat preserving exterior wall, comprise riser and building block, inboard, lower end and the outside at riser fixedly have junction plate respectively, junction plate in the inboard, lower end of riser has the fastening bolt installing hole, front side and the rear side of the junction plate outside the riser lower end fixedly have limiting plate respectively, are installed with building block on the junction plate between the limiting plate from top to bottom.
As preferably, be installed with warming plate between above-mentioned building block and the riser, fixedly have heat-insulation mortar bed in the outside of warming plate.
As preferably, above-mentioned building block is 7 to 10 layers.
As preferably, above-mentioned fastening bolt installing hole be four and be distributed in junction plate around.
The utility model is simple in structure, and is easy to use, fixes by fastening bolt installing hole and floor, by blockwork, not only reduced expense, also improved operating efficiency, and warming plate is contained in the building block, reduced disaster hidden-trouble.
Description of drawings
Fig. 1 looks sectional structure chart for master of the present utility model.
Coding among the figure is respectively: 1 is riser, and 2 are building block, and 3 is junction plate, and 4 is the fastening bolt installing hole, and 5 is warming plate, and 6 is heat-insulation mortar bed.
The specific embodiment
As shown in Figure 1, this building integral heat preserving exterior wall, comprise riser 1 and building block 2, inboard, lower end and the outside at riser 1 fixedly have junction plate 3 respectively, junction plate 3 in the inboard, lower end of riser 1 has fastening bolt installing hole 4, front side and the rear side of the junction plate 3 outside riser 1 lower end fixedly have limiting plate respectively, are installed with building block 2 from top to bottom on the junction plate 3 between the limiting plate.During use, can building block 2 be laid in factory, transport to the scene after, fix and can use by fastening bolt installing hole 4 and floor.
As shown in Figure 1, in order to increase insulation, reach the purpose of energy-saving consumption-reducing, between building block 2 and riser 1, be installed with warming plate 5, fixedly have heat-insulation mortar bed 6 in the outside of warming plate 5.And warming plate 5 is contained in the building block 2, can reduce disaster hidden-trouble.
As shown in Figure 1, as required, building block 2 is 7 to 10 layers.
As shown in Figure 1, for the ease of installation and removal, fastening bolt installing hole 4 be four and be distributed in junction plate 3 around.

Claims (5)

1. building integral heat preserving exterior wall, it is characterized in that comprising riser (1) and building block (2), inboard, lower end and the outside at riser (1) fixedly have junction plate (3) respectively, junction plate (3) in the inboard, lower end of riser (1) has fastening bolt installing hole (4), front side and the rear side of the junction plate (3) outside riser (1) lower end fixedly have limiting plate respectively, are installed with building block (2) on the junction plate between the limiting plate (3) from top to bottom.
2. building integral heat preserving exterior wall according to claim 1 is characterized in that being installed with warming plate (5) between building block (2) and the riser (1), in the outside of warming plate (5) heat-insulation mortar bed (6) is arranged fixedly.
3. building integral heat preserving exterior wall according to claim 1 and 2 is characterized in that building block (2) is 7 to 10 layers.
4. building integral heat preserving exterior wall according to claim 1 and 2, it is characterized in that fastening bolt installing hole (4) be four and be distributed in junction plate (3) around.
5. building integral heat preserving exterior wall according to claim 3, it is characterized in that fastening bolt installing hole (4) be four and be distributed in junction plate (3) around.
CN 201320067379 2013-01-30 2013-01-30 Building integral heat preservation outer wall Expired - Fee Related CN203174806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320067379 CN203174806U (en) 2013-01-30 2013-01-30 Building integral heat preservation outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320067379 CN203174806U (en) 2013-01-30 2013-01-30 Building integral heat preservation outer wall

Publications (1)

Publication Number Publication Date
CN203174806U true CN203174806U (en) 2013-09-04

Family

ID=49071530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320067379 Expired - Fee Related CN203174806U (en) 2013-01-30 2013-01-30 Building integral heat preservation outer wall

Country Status (1)

Country Link
CN (1) CN203174806U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965656A (en) * 2019-12-05 2020-04-07 北京当代创新建设工程有限责任公司 High steadiness external wall insulation structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965656A (en) * 2019-12-05 2020-04-07 北京当代创新建设工程有限责任公司 High steadiness external wall insulation structure
CN110965656B (en) * 2019-12-05 2021-02-23 北京当代创新建设工程有限责任公司 High steadiness external wall insulation structure

Similar Documents

Publication Publication Date Title
CN203531344U (en) Tool type scaffold
CN105421657B (en) Foam cement composite plate and attaching method thereof with dovetail groove type steel side rib structure
MX2008014657A (en) Wall liner.
CN204357109U (en) Opposite-compacting type aluminum alloy mould plate
CN204475593U (en) Support structure installed by a kind of curtain wall
CN205348563U (en) Foaming cement composite sheet with forked tail slot type steel limit rib structure
CN203174806U (en) Building integral heat preservation outer wall
CN203795664U (en) Lightweight heat insulation wall body
CN203806367U (en) Building prefabricated external wall panel transportation storage rack
CN203441153U (en) Integrated house for comprehensive orientation
CN204728753U (en) A kind of movable plank house
CN203531228U (en) Double-layered compound cross steel beam
CN204081073U (en) A kind of movable plank house
CN203546927U (en) Built-in heat insulation integral board
CN204059693U (en) Easy lifting heat-preserving building floor
CN204199529U (en) Cement foamed insulation blocks
CN204460403U (en) A kind of heating wall
CN204510532U (en) A kind of disassembly-free heat-insulation non-bearing wall modular unit
CN204081107U (en) A kind of outer wall self heat-preserving plate
CN201679102U (en) Heat-insulating and energy-saving aluminum-plastic plate member
CN204804179U (en) Heat preservation cylinder
CN203145495U (en) Movable house
CN203531225U (en) Non-bearing vertical steel column
CN203613684U (en) Outside-corner hanging piece of ceramic plate curtain wall
CN202731097U (en) Novel building energy-saving wall panel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LI GENGHUA

Free format text: FORMER OWNER: CHEN KAITAI

Effective date: 20140113

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 322304 JINHUA, ZHEJIANG PROVINCE TO: 261000 WEIFANG, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140113

Address after: 261000, No. 153 Li Jia village, solid dike Town, Hanting District, Shandong, Weifang

Patentee after: Li Genghua

Address before: 322304 Zhejiang County of Panan Province Pan Feng Xiang Sanbai Village No. 147

Patentee before: Chen Kaitai

ASS Succession or assignment of patent right

Owner name: HUIJIANG CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: XIANG ZHENMAO

Effective date: 20140219

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20140219

Address after: 261000 Shandong city of Weifang province high tech Zone in North West Dongfeng East Road Golden District 1 building

Patentee after: Union River Construction Company Limited

Address before: 261000, No. 153 Li Jia village, solid dike Town, Hanting District, Shandong, Weifang

Patentee before: Li Genghua

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130904

Termination date: 20160130