CN203174778U - Concrete slab preformed hole blocking device - Google Patents
Concrete slab preformed hole blocking device Download PDFInfo
- Publication number
- CN203174778U CN203174778U CN 201320062728 CN201320062728U CN203174778U CN 203174778 U CN203174778 U CN 203174778U CN 201320062728 CN201320062728 CN 201320062728 CN 201320062728 U CN201320062728 U CN 201320062728U CN 203174778 U CN203174778 U CN 203174778U
- Authority
- CN
- China
- Prior art keywords
- steel tube
- concrete slab
- embedded steel
- base ring
- preformed hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses a concrete slab preformed hole blocking device which is a pre-buried steel tube which brings convenience to blocking of concrete slab preformed holes. The concrete slab preformed hole blocking device comprises the pre-buried steel tube, a bottom ring, and a blocking plate. The concrete slab preformed hole blocking device improves the quality of later-period backfilled concrete of concrete slab beam construction preformed holes, does not need detachment, and is simple and convenient to machine, install and operate.
Description
Technical field
The utility model is a kind of concrete slab preformed hole plugging device.
Background technology
When concrete plate beam is constructed, reserve some holes for satisfying the normal needs of construction demand, these reserving holes mainly are to lift or be used for form brace to wearing reinforcing for steel wire penetrating.Because preformed hole is the penetrating hole of both ends open, and behind a large amount of concrete plate beam hoisted in position or behind the stripping tie rod, an end opening of hole often is positioned at free face, can't seal during shutoff, can't guarantee the concrete quality of later stage shutoff.
Summary of the invention
The utility model provides a kind of concrete slab preformed hole plugging device, is mainly used in the later stage backfill shutoff of concrete slab preformed hole, has solved the quality problems of present concrete plate beam construction when reserving perforation later stage backfill, has improved quality of concrete.
The purpose of this utility model is achieved in that a kind of concrete slab preformed hole plugging device, comprise embedded steel tube, base ring, shutoff plate, described embedded steel tube is column type hollow thin-wall steel pipe, embedded steel tube one end is welded with base ring, described base ring is an annular steel plate, the base ring external diameter is identical with the embedded steel tube external diameter, and the base ring internal diameter is slightly less than the embedded steel tube internal diameter; The shutoff plate is circular steel plate, and the shutoff board diameter is slightly less than the internal diameter of embedded steel tube but is slightly larger than the internal diameter of base ring.
All right, the shutoff plate can be positioned over by an end of embedded steel tube on the entablature of base ring formation, makes embedded steel tube form two cavitys.
Advantage of the present utility model is, uses above structure, and embedded steel tube one end is provided with base ring, places the shutoff plate on the base ring, has improved the quality when perforation later stage backfill is reserved in the concrete plate beam construction.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples:
Fig. 1 is the utility model structure drawing of device;
Fig. 2 is that the A-A of Fig. 1 is to view;
Fig. 3 construction schematic diagram of the present utility model.
The specific embodiment
A kind of concrete slab preformed hole plugging device comprises embedded steel tube 1, base ring 2, and described embedded steel tube 1 is column type hollow thin-wall steel pipe, and embedded steel tube 1 one ends are welded with base ring 2.
Base ring 2 is an annular steel plate, and base ring 2 external diameters are identical with embedded steel tube 1 external diameter, and base ring 2 internal diameters are slightly less than embedded steel tube 1 internal diameter.
Operating principle: concrete slab is when construction, the embedded steel tube 1 that is welded with base ring 2 is installed firmly by construction requirement, can carry out concreting, after concrete reaches the length of time, stripping or with the concrete slab hoisted in position, flushing embedded steel tube, shutoff plate 3 is put into from embedded steel tube 1 one ends, shutoff plate 3 drops on the entablature of base ring formation, makes the sealing of embedded steel tube 1 one ends, and can carry out the later stage backfill shutoff of pre-buried hole this moment.
Claims (2)
1. concrete slab preformed hole plugging device, it is characterized in that: comprise embedded steel tube (1), base ring (2), shutoff plate (3), described embedded steel tube (1) is hollow section, embedded steel tube (1) one end is welded with base ring (2), base ring (2) is the annular plate, base ring (2) external diameter is identical with embedded steel tube (1) external diameter, base ring (2) internal diameter is less than embedded steel tube (1) internal diameter, shutoff plate (3) is circular steel plate, and shutoff plate (3) diameter is less than the internal diameter of embedded steel tube (1), greater than the internal diameter of base ring (2).
2. concrete slab preformed hole plugging device according to claim 1 is characterized in that: described shutoff plate (3) can be positioned over by an end of embedded steel tube (1) on the entablature that base ring (2) forms, and makes embedded steel tube (1) form two cavitys.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320062728 CN203174778U (en) | 2013-02-04 | 2013-02-04 | Concrete slab preformed hole blocking device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320062728 CN203174778U (en) | 2013-02-04 | 2013-02-04 | Concrete slab preformed hole blocking device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203174778U true CN203174778U (en) | 2013-09-04 |
Family
ID=49071502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320062728 Expired - Fee Related CN203174778U (en) | 2013-02-04 | 2013-02-04 | Concrete slab preformed hole blocking device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203174778U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI645094B (en) * | 2017-07-21 | 2018-12-21 | 遠揚營造工程股份有限公司 | Method for constructing underwater foundation by using caisson and |
-
2013
- 2013-02-04 CN CN 201320062728 patent/CN203174778U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI645094B (en) * | 2017-07-21 | 2018-12-21 | 遠揚營造工程股份有限公司 | Method for constructing underwater foundation by using caisson and |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN204825881U (en) | A deep steel sheet net dado section of thick bamboo suitable for soft soil area bored concrete pile of driling | |
CN201261950Y (en) | Open pore structure on steel reinforced concrete pond wall | |
CN108265976A (en) | A kind of pipe hole preformed device and operating method | |
CN203174778U (en) | Concrete slab preformed hole blocking device | |
CN103015318A (en) | Inner sleeve-type inclined guy cable main tower cable guide pipe and construction method thereof | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN202131676U (en) | Quake-proof steel tie bar embedded part | |
CN206173957U (en) | Pore -forming is with protecting a section of thick bamboo | |
CN107762135A (en) | The construction method of skin scaffold wall connecting piece | |
CN204844469U (en) | Precast shear wall installation is with pre -buried steel tube hole positioner | |
CN202280152U (en) | Structure for arranging embedded part at bottom of reinforced concrete plate | |
CN101250870A (en) | Positioning device for filling pile reinforcement cage | |
CN202324626U (en) | Simple and light template bracket | |
CN204609300U (en) | A kind of fixed sleeving for construction drainage pipeline preformed hole hole | |
CN204282382U (en) | A kind of equipment by decompression drainage quick blocking precipitation pipe well | |
CN202718395U (en) | Opposite pulling rib exposure prevention device | |
CN204083520U (en) | Pipeline runs through concrete floor waterproof construction | |
CN205653825U (en) | A deviational survey pipe mounting structure is irritated to simple and easy pressure | |
CN104121423B (en) | Construction method of U-shaped pipe diameter limit clamp in pore way embedment | |
CN202788874U (en) | Embedded grouting guide tube device in chamber lining concrete | |
CN110778028A (en) | Grouting sleeve assembly and construction method thereof | |
CN103696495A (en) | Find-free embedded pipe | |
CN202767247U (en) | Embedded pipe free of searching | |
CN219123906U (en) | Cable tube plugging mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130904 Termination date: 20210204 |