CN203174568U - Arrangement type of ecological flow pipe of concrete dam - Google Patents
Arrangement type of ecological flow pipe of concrete dam Download PDFInfo
- Publication number
- CN203174568U CN203174568U CN 201320182137 CN201320182137U CN203174568U CN 203174568 U CN203174568 U CN 203174568U CN 201320182137 CN201320182137 CN 201320182137 CN 201320182137 U CN201320182137 U CN 201320182137U CN 203174568 U CN203174568 U CN 203174568U
- Authority
- CN
- China
- Prior art keywords
- ecological flow
- discharge orifice
- flow buret
- dam
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses an arrangement type of an ecological flow pipe of a concrete dam. A dam body is provided with a flood discharge orifice flow channel; the lower flow channel is provided with a long drainage groove which is formed close to a bank slope; an inlet of the ecological flow pipe is formed in the lateral wall of the flood discharge orifice flow channel which is formed in the lower side of a flood discharge orifice accident maintenance door which is arranged on the concrete dam body; a lower outlet of the ecological flow pipe is formed in the lateral wall inside the long drainage groove which is formed outside the lower dam body of a flood discharge orifice working door; and a control sluice valve of the ecological flow pipe is arranged on the lower side outside the dam body. The arrangement type of the ecological flow pipe of the concrete dam has the advantages of meeting the using requirements of ecological flow discharge, enabling the structure to be simplified, being beneficial to the safety of the structure and convenient for future operation and maintenance and ensuring the good connection with a lower river channel after the ecological flow discharge.
Description
Technical field
The ecological flow buret that the utility model relates in a kind of Hydraulic and Hydro-Power Engineering arranges pattern, especially a kind of ecological flow buret layout pattern of concrete dam.
Background technology
The pattern that the ecological flow buret is set in concrete dam body usually is: perforate separately; Regulating gate is arranged on the structure outstanding outside the dam body upstream; Outlet arranges energy-dissipating installation separately.This kind layout will be brought following problem: perforate increases in (1) concrete dam body, and construction is disturbed and strengthened; (2) generally speaking, for guaranteeing releasing of ecological flow, ecological flow buret import elevation need be arranged in below the level of dead water, and is big when the dam body height, when operation depth of water luffing is big, and conventional ecological flow buret arrangement maintenance difficulty will be very big; (3) river valley is narrow, and aperture layout width is limited or arch dam bodily form degree of hanging by the feet is bigger, need arrange under the long situations such as outer outstanding structure, and structures such as layout ecological flow buret are also comparatively difficult; (4) also should consider to handle separately with being connected of downstream river course after ecological flow is released.
The utility model content
The technical problems to be solved in the utility model is to provide the current that a kind of applicability is strong, structure is comparatively simple, easy access is safeguarded, let out down to be connected the ecological flow buret layout pattern of concrete dam preferably with downstream river course.
The technical scheme that the utility model adopts is: a kind of ecological flow buret layout pattern of concrete dam, and dam body is provided with the discharge orifice runner; Discharge orifice runner downstream has the groove of letting out of length that close bank slope arranges; The import of ecological flow buret is arranged on the sidewall in the discharge orifice runner of the discharge orifice emergency repair passage downstream side that concrete dam arranges on one's body; The outlet of ecological flow buret is arranged in outer the letting out on the interior sidewall of groove of arranging of discharge orifice service gate downstream dam body, and the control gate valve of ecological flow buret is arranged at the outer downstream of dam body.
Described ecological flow buret be (broken line type, the import of ecological flow buret and discharge orifice runner oblique, the outlet of ecological flow buret with let out the groove oblique.
Be positioned at that the groove of letting out of certain limit is provided with steel lining, the smooth welding of ecological flow steel pipe that steel lining is interior with letting out groove with being embedded in the concrete dam body near the outlet of near the discharge orifice runner inner wall of the certain limit import of ecological flow buret and ecological flow buret.
Brushing has the coating of anti-impact mill, anti-corrosion on the described steel lining.
The import of described ecological flow buret is arranged in the discharge orifice of low elevation in the dam body discharge orifice.
Described concrete dam is gravity dam or arch dam, and the dam body dam material is normal concrete or roller compacted concrete.
Described ecological flow buret is steel pipe.
The beneficial effect that the utility model produces is: both satisfied the instructions for use of the ecological flow of releasing, simplified the structure again, be conducive to the safety of structure; Be convenient to from now on operation and maintenance; Guaranteed to be connected with the good of downstream river course after ecological flow is released.
Description of drawings
Fig. 1 is the ecological flow buret layout pattern generalized section of concrete dam of the present utility model.
Fig. 2 is the ecological flow buret layout pattern floor map of concrete dam of the present utility model.Among the figure:
1---dam body;
2---the discharge orifice runner;
3---the ecological flow buret;
4---let out groove;
5---the import of ecological flow buret;
6---the outlet of ecological flow buret;
7---steel lining;
8---the emergency repair door;
9---service gate;
10---the control gate valve.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail:
As shown in Figure 1, 2, the ecological flow buret layout pattern of concrete dam of the present utility model, dam body 1 is provided with discharge orifice runner 2; What discharge orifice runner 2 downstreams had length that close bank slope arranges lets out groove 4; The import 5 of ecological flow buret 3 is arranged on the concrete dam body 1 on the sidewall in the discharge orifice runner 2 in discharge orifice emergency repair door 8 downstreams that arrange; The outlet 6 of ecological flow buret 3 is arranged in outer the letting out on the sidewall in the groove 4 of arranging of discharge orifice service gate 9 downstream dam bodys, and the control gate valve 10 of ecological flow buret is arranged at the outer downstream of dam body.
Described ecological flow buret 3 be (broken line type, the import 5 of ecological flow buret and discharge orifice runner 2 obliques, the outlet 6 of ecological flow buret with let out groove 4 obliques.
Be positioned at that the groove 4 of letting out of certain limits is provided with steel lining 7 near the outlet 6 of near discharge orifice runner 2 inwalls of the certain limits import 5 of ecological flow buret and ecological flow buret, the smooth welding of ecological flow steel pipe that steel lining 7 is interior with letting out groove 4 with being embedded in concrete dam body 1.
Brushing has the coating of anti-impact mill, anti-corrosion on the described steel lining 7.
The import 5 of described ecological flow buret is arranged in the discharge orifice of low elevation in the dam body discharge orifice.
Described concrete dam is gravity dam or arch dam, and the dam body dam material is normal concrete or roller compacted concrete.
Described ecological flow buret 3 is steel pipe.
Specifically, dam body 1 is provided with discharge orifice runner 2; What discharge orifice runner 2 downstreams had length that close bank slope arranges lets out groove 4; The pattern that ecological flow buret 3 is arranged be (broken line type, its import 5 shares with discharge orifice runner 2, is arranged on the interior sidewall of the runner in discharge orifice emergency repair door 8 downstreams that arrange on the concrete dam body 1; The outlet 6 of the ecological flow buret 3 in downstream shares with the outer groove 4 of letting out that arranges of discharge orifice dam body, and outlet is arranged in outer the letting out on the sidewall in the groove 4 of arranging of discharge orifice service gate 9 downstream dam bodys; Import 5 with outlet 6 all with discharge orifice runner 2 or let out groove 4 obliques.Be positioned at ecological flow buret import 5 or export near the discharge orifice runner 2 of certain limits 6 or let out on the groove 4 steel lining 7 need be set, and can on steel lining 7, brush the coating with performances such as anti-impact mill, anti-corrosions; Control gate valve 10 facilities such as grade of ecological flow buret are placed in the downstream outside the dam body 1.
Be elaborated below in conjunction with specific embodiment:
Certain medium hydropower station engineering, dam are rolled concrete arch dam, maximum height of dam 107m, dam crest arc length 160m.Adopt the arrangement of dam body flood discharge, the husky building of flood discharge row is made up of three weir meter holes, two flood discharge mesopores, the husky hole of row.Weir meter hole weir crest elevation 1062.50m, aperture width 10.0m, the flip trajectory bucket mode is adopted in energy dissipating; Flood discharge sand surfing mesopore import floor elevation is 1020.00m, port size be 5m * 6.5m(wide * height), adopt the flip trajectory bucket mode; Arranging husky hole import floor elevation is 1025.00m, port size be 2 * 4m(wide * height).Wherein arrange and connect the length of arranging on the right bank bank under the husky hole and let out groove, export and be special-shaped bucket lip, adopt the flip trajectory bucket mode.
For satisfying the requirement of releasing of dam to the ecological flow of factory building section, be provided with the ecological flow buret.Need let out ecological flow down dry season and be about 7.2m
3/ s.As Fig. 1, shown in 2, in the runner 2 in the husky hole of ecological flow buret 3 rows of being arranged in, be that an internal diameter is D800mm, wall thickness 10mm, the steel pipe of the about 29m of length, on the right side wall of ecological flow buret import 5 rows of being arranged in husky hole Emergency Gate 8 rear portion runners 2, adopt the pipe laying mode to pass dam body 1 on runner 2 right sides in the husky hole of row, in dam body 1 downstream and let out and be provided with 1023.7m elevation fill concrete platform between the groove 4, connect control gate valve 10 at this section ecological flow buret 3 in the exposed conduit mode, control downstream, the husky hole of ecological flow buret 3 rows of passing, gate valve 10 downstream let out groove 4 abutment walls, the stream that will descend to sluice inserts to be arranged husky hole and lets out the groove section and enter downstream river course.
Ecological flow buret import and export section is respectively 45 °, 60 ° with the husky axially bored line angle of cut of row, for preventing the water sand drift speed that the bend loss current are bigger and cavitating to arranging abrasion and the influence of husky orifice flow road structure, in the husky hole 2 of row and ecological flow buret 3 import and export sections handing-over position certain limit, be provided with the steel lining 7 of thickness 20mm, and brush the coating with performances such as anti-impact mill, anti-corrosions.
Layout pattern described in the utility model is particularly useful for following situation: (1) arranges the ecological flow tubular structure at the high dam dam body; (2) river valley is narrow, and the aperture arranges that width is limited; (3) arch dam bodily form degree of hanging by the feet is bigger, needs to arrange long outer outstanding structure; (4) the discharge orifice downstream has the length that close bank slope arranges and lets out groove.The utility model is different from the method to set up of ecological flow tubular structure routine on the concrete dam body, the import of ecological flow buret, outlet and discharge orifice are shared, import is arranged on discharge orifice emergency repair passage downstream side, facilities such as outer outstanding structure that conventional need arrange in the dam body upstream and gate have been cancelled, namely be beneficial to maintenance from now on, also reduced the setting of the outer attached structure of dam body; Outlet shares with the outer groove of letting out that arranges of discharge orifice dam body, solved the problem that the stream that time sluices is connected with downstream river course preferably.
Above-described embodiment only is used for explanation technological thought of the present utility model and characteristics, its purpose is to make those skilled in the art can understand content of the present utility model and implements according to this, can not only limit claim of the present utility model with present embodiment, be equal variation or the modification that spirit that all the utility model disclose is done, still drop in the claim of the present utility model.
Claims (7)
1. the ecological flow buret layout pattern of a concrete dam is characterized in that, dam body (1) is provided with discharge orifice runner (2); What discharge orifice runner (2) downstream had length that close bank slope arranges lets out groove (4); The import (5) of ecological flow buret (3) is arranged on the sidewall in the discharge orifice runner (2) in discharge orifice emergency repair door (8) downstream that concrete dam body (1) go up to arrange; The outlet (6) of ecological flow buret (3) is arranged in outer the letting out on the interior sidewall of groove (4) of arranging of discharge orifice service gate (9) downstream dam body, and the control gate valve (10) of ecological flow buret is arranged at the outer downstream of dam body.
2. the ecological flow buret layout pattern of concrete dam according to claim 1, it is characterized in that, described ecological flow buret (3) be (broken line type, the import of ecological flow buret (5) and discharge orifice runner (2) oblique, the outlet of ecological flow buret (6) with let out groove (4) oblique.
3. the ecological flow buret layout pattern of concrete dam according to claim 1 and 2, it is characterized in that, be positioned at that the groove (4) of letting out of certain limit is provided with steel lining (7) near the outlet (6) of near discharge orifice runner (2) inwall of the certain limit import (5) of ecological flow buret and ecological flow buret, steel lining (7) and be embedded in concrete dam body (1) and let out the interior smooth welding of ecological flow steel pipe of groove (4).
4. the ecological flow buret layout pattern of concrete dam according to claim 3 is characterized in that, described steel lining (7) is gone up the coating that brushing has anti-impact mill, anti-corrosion.
5. the ecological flow buret layout pattern of concrete dam according to claim 1 is characterized in that, the import of described ecological flow buret (5) is arranged in the discharge orifice of low elevation in the dam body discharge orifice.
6. the ecological flow buret layout pattern of concrete dam according to claim 1 is characterized in that, described concrete dam is gravity dam or arch dam, and the dam body dam material is normal concrete or roller compacted concrete.
7. the ecological flow buret layout pattern of concrete dam according to claim 1 is characterized in that, described ecological flow buret (3) is steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320182137 CN203174568U (en) | 2013-04-12 | 2013-04-12 | Arrangement type of ecological flow pipe of concrete dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320182137 CN203174568U (en) | 2013-04-12 | 2013-04-12 | Arrangement type of ecological flow pipe of concrete dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203174568U true CN203174568U (en) | 2013-09-04 |
Family
ID=49071293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320182137 Expired - Lifetime CN203174568U (en) | 2013-04-12 | 2013-04-12 | Arrangement type of ecological flow pipe of concrete dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203174568U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174115A (en) * | 2013-04-12 | 2013-06-26 | 中国水电顾问集团北京勘测设计研究院 | Ecological flow pipe arrangement type for concrete dam |
CN109356122A (en) * | 2018-11-21 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | Lock indoor ecological discharge tube structure |
-
2013
- 2013-04-12 CN CN 201320182137 patent/CN203174568U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174115A (en) * | 2013-04-12 | 2013-06-26 | 中国水电顾问集团北京勘测设计研究院 | Ecological flow pipe arrangement type for concrete dam |
CN103174115B (en) * | 2013-04-12 | 2015-01-28 | 中国水电顾问集团北京勘测设计研究院 | Ecological flow pipe arrangement type for concrete dam |
CN109356122A (en) * | 2018-11-21 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | Lock indoor ecological discharge tube structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107401147B (en) | A kind of multistage free-electron model formula energy dissipating drilled shaft of annular | |
CN101713178B (en) | Method for creating three-stage flow passage of meandering riverway in lower Yellow River | |
CN105155484B (en) | By the method that the reconstruction of temporary diversion hole is permanent release floodwatering facility | |
CN106759833A (en) | A kind of combined type fairing for improving urban rainwater pumping plant Inlet flow pattern | |
CN105951689B (en) | A kind of reservoir let out in advance and ecological flow under let out structure | |
CN103410130A (en) | Multi-purpose tunnel arrangement structure | |
CN104452685B (en) | A kind of classification buoyancy lift type checkdam | |
CN204185835U (en) | Power station free pressure flow tail water discharge | |
CN203174568U (en) | Arrangement type of ecological flow pipe of concrete dam | |
CN208857807U (en) | It is a kind of to fill sluicing and water charging system for large scale ship | |
CN102767155A (en) | Reservoir dredging pipe system and layout method thereof | |
CN202090383U (en) | Double-vertical shaft gate-controlled type surface-layer water getting facility | |
CN103174115B (en) | Ecological flow pipe arrangement type for concrete dam | |
CN206529749U (en) | A kind of power station generating water diverting structure arrangement for taking into account environmental protection and sand discharge demand | |
CN203021973U (en) | Sand intercepting groove | |
CN117513260A (en) | Drainage structure combining diversion tunnel, drainage tunnel and vertical shaft type flood drainage tunnel | |
CN202214710U (en) | Overflowing-drainage integrated brake weir | |
CN204875721U (en) | Diversion tunnel export energy absorber | |
CN105317027A (en) | Combined type flood discharge and water taking method and structure thereof | |
CN106702968B (en) | It is a kind of can automatic sand washing subtract the arc line type overflow dam and its operation method of silt | |
CN104099908B (en) | Gravity type sand obstructing and guiding structure | |
CN203821344U (en) | Forward water inlet and sand sluicing flush gallery structure of hydropower station | |
CN201610539U (en) | Lower Yellow River wandering river way three-grade flow path building dam system | |
CN205604193U (en) | High dam reservoir unloading device | |
CN101487279A (en) | Segmented water-holding automatic water delivery control method in water delivery engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20130904 Effective date of abandoning: 20150128 |
|
RGAV | Abandon patent right to avoid regrant |