CN203160582U - Transverse pressing strip interior-casing-free wall space system capable of being installed rapidly - Google Patents

Transverse pressing strip interior-casing-free wall space system capable of being installed rapidly Download PDF

Info

Publication number
CN203160582U
CN203160582U CN 201320064199 CN201320064199U CN203160582U CN 203160582 U CN203160582 U CN 203160582U CN 201320064199 CN201320064199 CN 201320064199 CN 201320064199 U CN201320064199 U CN 201320064199U CN 203160582 U CN203160582 U CN 203160582U
Authority
CN
China
Prior art keywords
keel
press strip
metope
type
horizontal press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320064199
Other languages
Chinese (zh)
Inventor
周良剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Artech Panel Co Ltd
Original Assignee
Foshan Artech Panel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Artech Panel Co Ltd filed Critical Foshan Artech Panel Co Ltd
Priority to CN 201320064199 priority Critical patent/CN203160582U/en
Application granted granted Critical
Publication of CN203160582U publication Critical patent/CN203160582U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses a transverse pressing strip interior-casing-free wall space system capable of being installed rapidly. The transverse pressing strip interior-casing-free wall space system capable of being installed rapidly is used for enabling a plate to be fixed on the transverse pressing strip interior-casing-free wall space system capable of being installed rapidly to form an installation wall space. The transverse pressing strip interior-casing-free wall space system capable of being installed rapidly comprises the plate, keels and a corner connector used for enabling the keels to be fixed to the wall space. The keels comprise an upper keel, a lower keel and at least one strip of L-type angle aluminum. The L-type angle aluminum is arranged between the upper keel and the lower keel in parallel. The L-type angle aluminum is provided with a transverse pressing strip used for fixing the plate. The transverse pressing strip comprises a C-type groove and limiting blocks arranged on the upper edge and the lower edge of the C-type groove and used for fixing the plate. The upper edge and the lower edge of the plate respectively and correspondingly provided with a groove adaptive to the limiting blocks on the transverse pressing strip, and the grooves are clamped with the limiting blocks. According to the transverse pressing strip interior-casing-free wall space system capable of being installed rapidly, installation is convenient and rapid, disassembling and replacement are simple and convenient, and rapid installation of a building wall space can be achieved.

Description

A kind of horizontal press strip of energy Fast Installation does not have inside casing metope system
Technical field
The utility model relates to the building wall installing area, and in particular a kind of horizontal press strip of energy Fast Installation does not have inside casing metope system.
Background technology
Inside story plate in the tunnel is generally laid with ceramic tile.Adopt ceramic tile to lay and have following defective: 1, installation rate is slow, needs a piece ceramic tile that ceramic tile is bonded on the metope; 2, ceramic tile is directly to bond on the metope, does not have the space with metope, not only can't be between ceramic tile and metope stylet, and soundproof effect is bad; 3, when the ceramic tile damage maybe needs to change, ceramic tile need be destroyed to disassemble fully.Like this, take time and effort when not only installing, installation rate is slow, and difficulty of construction height during dismounting, and dismounting speed is slow, and the ceramic tile that removes also can't reuse, and causes serious waste.
Therefore, prior art has yet to be improved and developed.
The utility model content
The purpose of this utility model is to provide a kind of horizontal press strip of energy Fast Installation not have inside casing metope system, the horizontal press strip of described energy Fast Installation does not have inside casing metope system and can be used for metope in tunnel inside story metope or the subway, convenience quick for installation, dismounting easily is intended to solve in the prior art inside story metope and trouble is installed and dismantles slow-footed problem.
The technical solution of the utility model is as follows:
A kind of horizontal press strip of energy Fast Installation does not have inside casing metope system, do not have inside casing metope system for the horizontal press strip that sheet material is fixed on the energy Fast Installation and form the installation metope, wherein, the horizontal press strip of described energy Fast Installation does not have the angle sign indicating number that inside casing metope system comprises sheet material, keel and is used for described keel are fixed in metope; Described keel comprise that the horizontal press strip that is arranged at described energy Fast Installation does not have the last keel on inside casing metope system top, and the horizontal press strip that is arranged at described energy Fast Installation does not have the lower keel of inside casing metope system lower end and at least one L type angle aluminium; Described L type angle aluminium is set in parallel in described going up between keel and the described lower keel; Described L type angle aluminium is provided with the horizontal press strip for fixing described sheet material; Described horizontal press strip comprises C type groove and is arranged on the up and down limited block that is used for fixing described sheet material on two limits of C type groove; The both sides up and down of described sheet material be correspondingly provided with respectively with horizontal press strip on the suitable groove of limited block, described groove engages with described limited block; Per two parallel keel are formed the structure that is used for fixing described sheet material.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, and wherein, described keel comprise that also described L type keel are set in parallel between two parallel keel for the L type keel that support described sheet material; Described L type keel are fixed on the metope by the angle sign indicating number;
Be provided with between described sheet material and the L type keel for the structure glue of plate adhesion on described L type keel.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, wherein, has been provided with the PE adhesive tape of cushioning effect between described keel and the sheet material.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, wherein, is provided with in the perps between every two boards material for the vertical press strip of filling perps; Described vertical press strip is fixed between described sheet material and the keel.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, wherein, described vertical press strip comprises that described fixed part is arranged on the both sides of described C type groove for the C type groove of filling perps and two fixed parts that are used for the auxiliary fixing plate material, and the opening of described C type groove is outside; Described fixed part is arranged between sheet material and the keel.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, and wherein, described angle sign indicating number is L type angle sign indicating number, and one side of described L type angle sign indicating number is fixed on the metope by swell fixture, and the another side of described L type angle sign indicating number is fixedlyed connected with described keel by hex bolts;
The described keel of going up comprise for getting on the right track and be used for getting on the right track described first and be fixed on first support portion on the sign indicating number of angle in first of fixing described sheet material upper end, described first support portion be arranged on described first get on the right track on;
Described lower keel comprises that described second support portion is arranged on described second lower railway for second lower railway of fixing described sheet material lower end with for second support portion that described second lower railway is fixed on the sign indicating number of angle.
Described horizontal press strip that can Fast Installation does not have inside casing metope system, wherein, one side being provided with for the waist-shaped hole of regulating the distance between installation metope and the metope of fixedlying connected with keel of the angle sign indicating number of described L type.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, and wherein, the C type channel opening of described horizontal press strip is outside, and described horizontal press strip is fixed on the aluminium of described L type angle by countersunk head screw.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, wherein, is provided with profile in the C type groove of described horizontal press strip.
The horizontal press strip of described energy Fast Installation does not have inside casing metope system, wherein, also is provided with L type carrier link between described metope and the angle sign indicating number, and described L type carrier link is arranged on the described metope, and described L type carrier link links to each other with described angle sign indicating number by support post.
Beneficial effect: the horizontal press strip of energy Fast Installation provided by the utility model does not have inside casing metope system, and is easy for installation, and quick, dismounting and change is easy, can realize the Fast Installation of building wall.And frame is stealthy frame, and horizontal press strip that can Fast Installation does not have the fixed frame of inside casing metope system can not occupy the surface of sheet material, and the surface of sheet material can be exposed fully, makes metope simplicity generosity more is installed.Simultaneously, can also make installation metope and metope leave the space by regulating the distance between keel and the metope, can be used for stylet, and can increase the soundproof effect that metope is installed.
Description of drawings
Fig. 1 is the overall structure schematic diagram that the horizontal press strip of the utility model energy Fast Installation does not have the keel skeleton of inside casing metope system.
Fig. 2 is that last keel that horizontal press strip that the utility model can Fast Installation does not have an inside casing metope system are fixed on the cross section structure schematic diagram on the metope.
Fig. 3 is the cross section structure schematic diagram that the horizontal press strip of the utility model energy Fast Installation does not have the last keel of inside casing metope system.
Fig. 4 is that lower keel that horizontal press strip that the utility model can Fast Installation does not have an inside casing metope system is fixed on the cross section structure schematic diagram on the metope.
Fig. 5 is the cross section structure schematic diagram that the horizontal press strip of the utility model energy Fast Installation does not have the lower keel of inside casing metope system.
Fig. 6 is that horizontal press strip that horizontal press strip that the utility model can Fast Installation does not have an inside casing metope system is fixed on the cross section structure schematic diagram on the metope.
Fig. 7 is the cross section structure schematic diagram that the horizontal press strip of the utility model energy Fast Installation does not have the horizontal press strip of inside casing metope system.
Fig. 8 is that L type keel that horizontal press strip that the utility model can Fast Installation does not have an inside casing metope system are fixed on the cross section structure schematic diagram on the metope.
Fig. 9 is the plan structure schematic diagram that vertical press strip that horizontal press strip that the utility model can Fast Installation does not have an inside casing metope system is fixed on the perps between the sheet material.
Figure 10 is the cross section structure schematic diagram that the horizontal press strip of the utility model energy Fast Installation does not have the vertical press strip of inside casing metope system.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, clear and definite, below further describe with reference to the accompanying drawing the utility model of embodiment that develops simultaneously.
The horizontal press strip of a kind of energy Fast Installation provided by the utility model does not have inside casing metope system, do not have formation installation metope in the inside casing metope system for the horizontal press strip that sheet material 200 is fixed on the energy Fast Installation, be applicable to interior metope 100 installations of inside story metope 100 or the subway in tunnel.Particularly, shown in Fig. 1,2,4,6, the horizontal press strip of described energy Fast Installation does not have inside casing metope system, be used for sheet material 200 be fixed on can Fast Installation horizontal press strip do not have inside casing metope system and form metope is installed, described can Fast Installation horizontal press strip do not have inside casing metope system described comprise sheet material 200, keel with for the angle sign indicating number 4 that described keel is fixed in metope 100; Described keel comprise that the horizontal press strip that is arranged at described energy Fast Installation does not have the last keel 1 on inside casing metope system top, and the horizontal press strip that is arranged at described energy Fast Installation does not have the lower keel 2 of inside casing metope system lower end and at least one L type angle aluminium 3; Described L type angle aluminium 3 is set in parallel in described going up between keel 1 and the described lower keel 2; Also be provided with the horizontal press strip 30 for fixing described sheet material on the described L type angle aluminium 3; Described horizontal press strip 30 comprises C type groove 301 and is arranged on C type groove limited block 302 that is used for fixing described sheet material on two limits 301 about; Be correspondingly provided with respectively on two limits up and down of described sheet material with horizontal press strip 30 on the suitable groove of limited block 302, described groove engages with described limited block 302; Per two parallel keel are formed the structure that is used for fixing described sheet material 200.
When the sheet material 200 that is be arranged in parallel by many rows when described installation metope was formed, described L type angle aluminium 3 was arranged between the plate seam of every row's sheet material 200, and sheet material 200 is fixed on described going up between keel 1 and the described lower keel 2.
Like this, by last keel 1 and horizontal cooperating between the press strip 30, lower keel 2 and horizontal cooperating and laterally press strip 30 and horizontal cooperating between the press strip 30 between the press strip 30, the horizontal press strip that just sheet material can be fixed in the energy Fast Installation does not have inside casing metope system formation installation metope.
Described angle sign indicating number 4 is the L type, and one side of described L type angle sign indicating number 4 is fixed on the metope 100 by swell fixture 6, and the another side of described L type angle sign indicating number 4 is fixedlyed connected with described keel by hex bolts 7.Can evenly be provided with a plurality of angles sign indicating number 4 according to actual needs on the described keel.The spacing of per two angle sign indicating numbers 4 is to set according to actual specification and needs.One side that the angle sign indicating number 4 of described L type is fixedlyed connected with keel is provided with waist-shaped hole, by regulating the position of keel on angle sign indicating number 4, can realize the fine setting of the distance between metope and the metope is installed.
As shown in Figure 2, being arranged on the described horizontal press strip keel that do not have an inside casing metope system top that can Fast Installation is last keel 1, and the described angle sign indicating number 4 of keel 1 by the L type of going up is fixed on the metope 100.One side of described L type angle sign indicating number 4 is fixed on the metope 100 by swell fixture 6, and the other end of described L type angle sign indicating number 4 is fixedlyed connected with the described keel 1 of going up by hex bolts 7.As shown in Figure 3, the described keel 1 of going up comprise for first of fixing described sheet material 200 upper ends and get on the right track 11 and be used for described first 11 first support portions 12 that are fixed on the angle sign indicating number 4 of getting on the right track, and described first support portion 12 is arranged on described first and gets on the right track on 11.
As shown in Figure 4, being arranged on the described horizontal press strip keel that do not have an inside casing metope system bottom that can Fast Installation is lower keel 2, and described lower keel 2 is fixed on the metope 100 by the angle sign indicating number 4 of L type.One side of described L type angle sign indicating number 4 is fixed on the metope 100 by swell fixture 6, and the other end of described L type angle sign indicating number 4 is fixedlyed connected with described lower keel 2 by hex bolts 7.As shown in Figure 5, described lower keel 2 comprises that described second support portion 21 is arranged on described second lower railway 22 for second lower railway 22 of fixing described sheet material 200 lower ends with for second support portion 21 that described second lower railway 22 is fixed on the angle sign indicating number 4.
As shown in Figure 6, being arranged on described horizontal press strip that can Fast Installation, not have between the last keel 1 of inside casing metope system and the lower keel 2 be L type angle aluminium 3, and described L type angle aluminium 3 is fixed on the metope 100 by the angle sign indicating number 4 of L type.Described horizontal press strip 30 is fixed on the described L type angle aluminium 3 by countersunk head screw 31.One side of described L type angle sign indicating number 4 is fixed on the metope 100 by swell fixture 6, and the other end of described L type angle sign indicating number 4 is fixedlyed connected with described L type angle aluminium 3 by hex bolts 7.As shown in Figure 7, described horizontal press strip 30 comprises for C type groove 301 and the limited block 302 that is arranged at C type groove 301 both sides; The opening of described C type groove 302 is outside, and countersunk head screw 31 passes described C type groove 302 described horizontal press strip 30 is fixed on the described L type angle aluminium 3.In order to make the installation metope more smooth, in described C type groove 302, also can be provided with profile 32.
Like this, by last keel 1 and horizontal press strip 30, laterally press strip 30 and laterally press strip 30 or lower keel 2 and horizontal press strip 30 cooperates, the two ends up and down of sheet material 200 are fixed between the keel, and the horizontal press strip that described sheet material 200 can be fixed on described energy Fast Installation does not have in the inside casing metope system.Sheet material 200 fastens by the limited block on adjacent two horizontal press strips 30 and the groove of sheet material 200 like this, sheet material 200 can be fixed between two horizontal press strips 30, and horizontal press strip 30 can not occupied the picture on surface of sheet material, the latent frame connection of realization.And the mounting method that the horizontal press strip of this energy Fast Installation does not have inside casing metope system is simple, and dismounting is convenient.
When the area of described sheet material 200 is big, as shown in Figure 8, described keel also comprise for the L type keel 5 that support described sheet material 200, described L type keel 5 be set in parallel in describedly go up between keel 1 and the L type angle aluminium 3, between described lower keel 2 and the L type angle aluminium 3 or between two L type angle aluminium 3; Described L type keel 5 are fixed on the metope 100 by angle sign indicating number 4.Described L type keel 5 are generally positioned at the centre position of described sheet material 200, are used for the sheet material 200 of middle position is supported, and the sheet material 200 that enabling the horizontal press strip of Fast Installation does not have in the inside casing metope system is installed more firmly.Also can be provided with for the structure glue that sheet material 200 is adhered on the described L type keel 5 between described sheet material 200 and the L type keel 5.
Further, shown in Fig. 2,4,6 or 8, also be provided with the PE adhesive tape 8 of cushioning effect between described keel and the sheet material 200, reduce the slit between keel and the sheet material 200 on the one hand, sheet material 200 is securely fixed on the described keel, on the other hand, because the cushioning effect of PE adhesive tape 8 is arranged, when sheet material 200 is subjected to impacting, also can reduce the collision between sheet material 200 and the keel, prolong the application life of sheet material 200.
Owing to can be provided with multi-sheets 200 between per two parallel keel, therefore can have the perps vertical with keel between every two boards material 200.More closely knit for the metope 100 that makes installation, be provided with for the vertical press strip 9 of filling perps at every perps, as shown in Figure 9, described vertical press strip 9 is arranged in the perps between the two boards material 200, between sheet material 200 and keel; Described vertical press strip 9 is fixed on the keel by screw.As shown in figure 10, described vertical press strip 9 comprises that described fixed part 902 is arranged on the both sides of described C type groove 901 for the C type groove 901 of filling perps and two fixed parts 902 that are used for auxiliary fixing plate material 200.The opening of described C type groove 901 is outside, and described fixed part 902 is arranged between keel and the sheet material 200, described vertical press strip 9 can be fixed between described keel and the sheet material 200 by keel and just cooperating of sheet material 200 like this.Because described vertical press strip 9 is installed between sheet material 200 and the keel from the back side, therefore, vertical press strip 9 can not impact sheet material 200 surface details yet, makes the installation metope elegant in appearance.
When running into the out-of-flatness metope, L type carrier link also can be set between described metope 100 and the angle sign indicating number 4, described L type carrier link is arranged on the described metope 100, and described L type carrier link links to each other with described angle sign indicating number 4 by support post.The length of described L type carrier link is regulated according to metope 100 and the distance that metope is installed, and makes the surface that metope is installed keep smooth.
The horizontal press strip of energy Fast Installation provided by the utility model does not have inside casing metope system, and is easy for installation, and quick, dismounting and change is easy, can realize the Fast Installation of building wall.
Should be understood that; application of the present utility model is not limited to above-mentioned giving an example; for those of ordinary skills, can be improved according to the above description or conversion, all these improvement and conversion all should belong to the protection domain of the utility model claims.

Claims (10)

1. the horizontal press strip of an energy Fast Installation does not have inside casing metope system, do not have inside casing metope system for the horizontal press strip that sheet material is fixed on the energy Fast Installation and form the installation metope, it is characterized in that the horizontal press strip of described energy Fast Installation does not have the angle sign indicating number that inside casing metope system comprises sheet material, keel and is used for described keel are fixed in metope; Described keel comprise that the horizontal press strip that is arranged at described energy Fast Installation does not have the last keel on inside casing metope system top, and the horizontal press strip that is arranged at described energy Fast Installation does not have the lower keel of inside casing metope system lower end and at least one L type angle aluminium; Described L type angle aluminium is set in parallel in described going up between keel and the described lower keel; Per two parallel keel are formed the structure that is used for fixing described sheet material; Described L type angle aluminium is provided with the horizontal press strip for fixing described sheet material; Described horizontal press strip comprises C type groove and is arranged on the up and down limited block that is used for fixing described sheet material on two limits of C type groove; Be correspondingly provided with respectively on two limits up and down of described sheet material with horizontal press strip on the suitable groove of limited block, described groove engages with described limited block.
2. the horizontal press strip of energy Fast Installation according to claim 1 does not have inside casing metope system, it is characterized in that, described keel comprise that also described L type keel are set in parallel between two parallel keel for the L type keel that support described sheet material; Described L type keel are fixed on the metope by the angle sign indicating number;
Be provided with between described sheet material and the L type keel for the structure glue of plate adhesion on described L type keel.
3. the horizontal press strip of energy Fast Installation according to claim 2 does not have inside casing metope system, it is characterized in that, has been provided with the PE adhesive tape of cushioning effect between described keel and the sheet material.
4. the horizontal press strip of energy Fast Installation according to claim 1 does not have inside casing metope system, it is characterized in that, is provided with in the perps between every two boards material for the vertical press strip of filling perps; Described vertical press strip is fixed between described sheet material and the keel.
5. the horizontal press strip of energy Fast Installation according to claim 4 does not have inside casing metope system, it is characterized in that, described vertical press strip comprises for the C type groove of filling perps and two fixed parts that are used for the auxiliary fixing plate material, described fixed part is arranged on the both sides of described C type groove, and the opening of described C type groove is outside; Described fixed part is arranged between sheet material and the keel.
6. the horizontal press strip of energy Fast Installation according to claim 2 does not have inside casing metope system, it is characterized in that, described angle sign indicating number is L type angle sign indicating number, and one side of described L type angle sign indicating number is fixed on the metope by swell fixture, and the another side of described L type angle sign indicating number is fixedlyed connected with described keel by hex bolts;
The described keel of going up comprise for getting on the right track and be used for getting on the right track described first and be fixed on first support portion on the sign indicating number of angle in first of fixing described sheet material upper end, described first support portion be arranged on described first get on the right track on;
Described lower keel comprises that described second support portion is arranged on described second lower railway for second lower railway of fixing described sheet material lower end with for second support portion that described second lower railway is fixed on the sign indicating number of angle.
7. horizontal press strip that can Fast Installation according to claim 6 does not have inside casing metope system, it is characterized in that, one side being provided with for the waist-shaped hole of regulating the distance between installation metope and the metope of fixedlying connected with keel of the angle sign indicating number of described L type.
8. the horizontal press strip of energy Fast Installation according to claim 1 does not have inside casing metope system, it is characterized in that the C type channel opening of described horizontal press strip is outside, and described horizontal press strip is fixed on the aluminium of described L type angle by countersunk head screw.
9. the horizontal press strip of energy Fast Installation according to claim 8 does not have inside casing metope system, it is characterized in that, is provided with profile in the C type groove of described horizontal press strip.
10. the horizontal press strip of energy Fast Installation according to claim 1 does not have inside casing metope system, it is characterized in that, also be provided with L type carrier link between described metope and the angle sign indicating number, described L type carrier link is arranged on the described metope, and described L type carrier link links to each other with described angle sign indicating number by support post.
CN 201320064199 2013-02-01 2013-02-01 Transverse pressing strip interior-casing-free wall space system capable of being installed rapidly Expired - Fee Related CN203160582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320064199 CN203160582U (en) 2013-02-01 2013-02-01 Transverse pressing strip interior-casing-free wall space system capable of being installed rapidly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320064199 CN203160582U (en) 2013-02-01 2013-02-01 Transverse pressing strip interior-casing-free wall space system capable of being installed rapidly

Publications (1)

Publication Number Publication Date
CN203160582U true CN203160582U (en) 2013-08-28

Family

ID=49021777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320064199 Expired - Fee Related CN203160582U (en) 2013-02-01 2013-02-01 Transverse pressing strip interior-casing-free wall space system capable of being installed rapidly

Country Status (1)

Country Link
CN (1) CN203160582U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638342A (en) * 2016-12-01 2017-05-10 辽宁融达新材料科技有限公司 Foamed aluminum substrate sound barrier of U-shaped beam of metro
CN107090960A (en) * 2017-06-14 2017-08-25 安徽中烟工业有限责任公司 The cladding supporting and limiting device of wall brick and wall brick assembled dry hanging construction method
CN107254953A (en) * 2017-06-21 2017-10-17 上海全筑建筑装饰集团股份有限公司 A kind of indoor wall board mounting structure, component and installation method
CN110080477A (en) * 2019-05-23 2019-08-02 金螳螂精装科技(苏州)有限公司 A kind of assembled wallboard mounting structure and installation method convenient for changeing
CN111608682A (en) * 2020-04-23 2020-09-01 上海市建筑装饰工程集团有限公司 Durable, wear-resisting mounting structure of novel curtain decorative board
CN111608683A (en) * 2020-04-23 2020-09-01 上海市建筑装饰工程集团有限公司 High-precision and weldless curtain wall decorative plate mounting structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638342A (en) * 2016-12-01 2017-05-10 辽宁融达新材料科技有限公司 Foamed aluminum substrate sound barrier of U-shaped beam of metro
CN107090960A (en) * 2017-06-14 2017-08-25 安徽中烟工业有限责任公司 The cladding supporting and limiting device of wall brick and wall brick assembled dry hanging construction method
CN107090960B (en) * 2017-06-14 2022-11-08 安徽中烟工业有限责任公司 Supporting and limiting device for dry hanging of wall bricks and wall brick assembly type dry hanging construction method
CN107254953A (en) * 2017-06-21 2017-10-17 上海全筑建筑装饰集团股份有限公司 A kind of indoor wall board mounting structure, component and installation method
CN110080477A (en) * 2019-05-23 2019-08-02 金螳螂精装科技(苏州)有限公司 A kind of assembled wallboard mounting structure and installation method convenient for changeing
CN111608682A (en) * 2020-04-23 2020-09-01 上海市建筑装饰工程集团有限公司 Durable, wear-resisting mounting structure of novel curtain decorative board
CN111608683A (en) * 2020-04-23 2020-09-01 上海市建筑装饰工程集团有限公司 High-precision and weldless curtain wall decorative plate mounting structure

Similar Documents

Publication Publication Date Title
CN203160582U (en) Transverse pressing strip interior-casing-free wall space system capable of being installed rapidly
CN103485460B (en) Be convenient for changing the curtain wall of face glass
CN202925723U (en) Open stone curtain wall system
CN203222953U (en) Non-inner-frame installation wall system capable of rapidly installing
CN203160613U (en) Exposed frame installation wall space system capable of being disassembled and assembled rapidly
CN202017287U (en) Connection structure capable of realizing optional quick-assembly and quick-disassembly of glass decorating plates of interior walls
CN213477314U (en) Hang stone material formula curtain mounting structure futilely
CN203626854U (en) Tunnel stand column mounting system
CN102979014A (en) Sensing plate assembling structure of track panel for maglev train
CN204323376U (en) The Undercarriage structure of aluminum alloy bodywork of rail vehicle
CN207177007U (en) A kind of bright frame decorative strip installing structure of building curtain wall
CN110629693A (en) Bridge insert plate type sound barrier and mounting process
CN202787106U (en) Sound barrier plate fixing device
CN212104740U (en) Cement fiberboard curtain wall system
CN204001411U (en) A kind of cellular board
CN213390976U (en) Mounting structure of interior wall decorative board
CN203097200U (en) Subway wall board mounting structure
CN204753382U (en) Prefabricated pavement of voiced protective screen of inter -city railway
CN204826337U (en) Aluminium honeycomb curtain
CN213268514U (en) Detachable ceramic plate curtain wall connecting structure
CN207846956U (en) A kind of cladding panel of compound microlite
CN208584769U (en) A kind of extruding machine cable disc mounting device
CN207003283U (en) High ferro non-metallic baffle is seated device and connected structure
CN206554448U (en) A kind of decoration board mounting structure
CN202188611U (en) Vertically-installed FFU (fan filter unit) system for clean room

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20190201

CF01 Termination of patent right due to non-payment of annual fee