CN203145461U - Reinforcing steel bar drawing wire - Google Patents

Reinforcing steel bar drawing wire Download PDF

Info

Publication number
CN203145461U
CN203145461U CN 201320170434 CN201320170434U CN203145461U CN 203145461 U CN203145461 U CN 203145461U CN 201320170434 CN201320170434 CN 201320170434 CN 201320170434 U CN201320170434 U CN 201320170434U CN 203145461 U CN203145461 U CN 203145461U
Authority
CN
China
Prior art keywords
bolt
templates
steel bar
reinforcing steel
shanks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320170434
Other languages
Chinese (zh)
Inventor
闫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN 201320170434 priority Critical patent/CN203145461U/en
Application granted granted Critical
Publication of CN203145461U publication Critical patent/CN203145461U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a reinforcing steel bar drawing wire which is connected between two parallel templates in a penetrating mode. The reinforcing steel bar drawing wire comprises a reinforcing steel bar rod, two bolt bars, two nuts and two cover bodies used for separating casting slurry and the two bolt bars. The two bolt bars penetrate through the two templates respectively, are fixedly connected with two ends of the reinforcing steel bar rod, and are detachable. The two cover bodies are sleeved at two ends of the reinforcing steel bar rod respectively and cover one ends, penetrating through the two templates, of the two bolt bars respectively. The two nuts are respectively fastened to the other ends of the bolt bars. According to the reinforcing steel bar drawing wire, the reinforcing steel bar rod and the bolt bars are matched in a detachable mode to support the two templates, the nuts and the cover bodies are used for clamping the two templates, and therefore the templates can be fixed. Due to the structure, after the wall is cast, the bolt bars exposed out of the wall body can be dismantled, later workload is reduced, efficiency is improved, and labor intensity is lowered. Meanwhile, the bolt bars can be reused, and therefore cost is lowered.

Description

The reinforcing bar wire drawing
Technical field
The utility model relates to a kind of transformer station civil engineering equipment, especially a kind of reinforcing bar wire drawing for fixed form.
Background technology
In transformer station's civil engineering process, for guaranteeing that board wall carrying out stable, the anti-extrusion distortion of concreting process, improves the body of wall appearance flatness.Usually way is for to arrange a common reinforcing bar wire drawing in the template centre position in carrying out the template support process, and the template both sides are fixed, cut again after finishing when building, anticorrosion, repair, causing construction early stage fixing and construction material to waste bigger.And since bend fixing make and the adjusting process error bigger, cause and build back wall face poor flatness, very easily take place to run mould, spillage phenomenon, and in the post-processed process time-consuming taking a lot of work.
Summary of the invention
The technical problems to be solved in the utility model provides a kind of reinforcing bar wire drawing that can save cost, reduction labour intensity, reduce the later stage work amount.
In order to solve the problems of the technologies described above, the utility model runs through and is connected between two templates that be arranged in parallel, described reinforcing bar wire drawing comprises reinforcement rod, two shanks of bolt, two nuts and two cover bodies of building slurry and shank of bolt for isolation, the two ends that two described shanks of bolt pass two described templates and described reinforcement rod respectively are affixed and dismantled and assembled, two described cover bodies are set in the two ends of described reinforcement rod, and two described cover bodies cover the end that two described shanks of bolt pass two described templates respectively, and two described nuts are fixed tightly in the other end of two described shanks of bolt respectively.
The two ends of described reinforcement rod are connected with the threaded one end of two described shanks of bolt respectively, and the other end of two described shanks of bolt all is formed with the external screw thread that cooperates for two described nuts.
Two described cover bodies are the conical shell structure that rubber is made, and two described cover body one ends all are formed with an opening and this end is fitted on the template inside wall, and the other end all is formed with a screwed hole and this end is threaded on the described reinforcement rod.
Described reinforcement rod middle part is welded with a circular sealing sheet.
Adopt technique scheme, reinforcement rod supports two templates with removable cooperation of shank of bolt in the utility model, and by nut and cover body two templates is clamped, and has realized fixing template.After such structure makes body of wall build to finish, the shank of bolt that is exposed to the body of wall outside can be pulled down, reduce the later stage work amount, improve efficient, reduce labour intensity, shank of bolt can be utilized again simultaneously, reduce cost.
Description of drawings
Fig. 1 is the structural representation of the utility model reinforcing bar wire drawing;
Fig. 2 is the structural representation of shank of bolt in the utility model;
Fig. 3 is the structural representation of cover body in the utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail:
Referring to Fig. 1 to Fig. 3, reinforcing bar wire drawing of the present utility model runs through and is connected 1 of two template that be arranged in parallel, and described reinforcing bar wire drawing comprises that reinforcement rod 2, two shanks of bolt 3, two nuts 4 and two are used for isolating the cover bodies 5 of building slurry and shank of bolt 3.
Two described shanks of bolt 3 pass respectively that two described templates 1 are threaded with the two ends of described reinforcement rod 2 and are dismantled and assembled, the two ends of described reinforcement rod 2 all are formed with external screw thread, one end of two described shanks of bolt 3 all is formed with internal thread, and the two ends of reinforcement rod 2 are being threaded in two shanks of bolt 3 of correspondence respectively.The other end of two described shanks of bolt 3 all is formed with external screw thread, is used for cooperating with two described nuts 4.Dismantled and assembled cooperation the by shank of bolt 3 and reinforcement rod 2 supported two templates 1, body of wall build finish after, the shank of bolt 3 that is exposed to the body of wall outside can be pulled down, reduce the later stage work amount, improved efficient, reduced labour intensity, shank of bolt 3 can be utilized again simultaneously, reduce cost.
Two described cover bodies 5 are the conical shell structure that rubber is made, and the cover body 5 of rubber system can effectively be prevented the infiltration of sealing, and two described cover body 5 one ends all are formed with an opening 51 and this end is fitted on template 1 inside wall, and the other end all is formed with a screwed hole 52.Two described cover bodies 5 are connected the two ends of described reinforcement rod 2 respectively by screwed hole 52, and two described cover bodies 5 cover two described shanks of bolt 3 respectively and pass an end of two described templates 1.By nut 4 and cover body 5 two templates 1 are clamped, realized fixing to template 1, isolate by cover body 5 and build slurry and shank of bolt 3, the unlikely slurry of building is fixed, and makes the shank of bolt 3 can be more convenient in dismounting.
Described reinforcement rod 2 middle parts are welded with a circular sealing sheet 6.Body of wall build finish after, penetrate into body of wall when inner as water along reinforcement rod 2, by the effect of sealing sheet 6, can prevent effectively that sealing oozes body through walls along reinforcement rod 2, avoided the further damage of water to strength of wall body.
Installation process of the present utility model is as follows:
Earlier two cover bodies are threaded in reinforcement rod 2 two ends, its integral body is placed between two templates 1 afterwards, two shanks of bolt 3 being passed hole corresponding on two templates 1 respectively is threaded with reinforcement rod 2 two ends again, regulating two cover body 5 to its openends fits tightly on template 1 inside wall, make it can cover shank of bolt 3 one ends that are exposed to template 1 inboard fully, then two nuts 4 are distinguished the other end of two shanks of bolt 3 of precessions, under the effect of cover body 5 and nut 4, the clamping that is fixed of two templates 1.
After the installation, build slurry in the model that can constitute to template 1, treat that slurry is shaped after, can unload shank of bolt 3, recycling again.
In sum, content of the present utility model is not limited in the above-described embodiment, and those skilled in the art can propose other embodiment within technological guidance's thought of the present utility model, but these embodiment are included within the scope of the present utility model.

Claims (4)

1. reinforcing bar wire drawing, run through and be connected between two templates that be arranged in parallel (1), it is characterized in that: described reinforcing bar wire drawing comprises reinforcement rod (2), two shanks of bolt (3), two nuts (4) and two cover bodies (5) of building slurry and shank of bolt (3) for isolation, it is affixed and dismantled and assembled with the two ends of described reinforcement rod (2) that two described shanks of bolt (3) pass two described templates (1) respectively, two described cover bodies (5) are set in the two ends of described reinforcement rod (2), and two described cover bodies (5) cover the end that two described shanks of bolt (3) pass two described templates (1) respectively, and two described nuts (4) are fixed tightly in the other end of two described shanks of bolt (3) respectively.
2. according to the described reinforcing bar wire drawing of claim 1, it is characterized in that: the two ends of described reinforcement rod (2) are connected with the threaded one end of two described shanks of bolt (3) respectively, and the other end of two described shanks of bolt (3) all is formed with the external screw thread that cooperates for two described nuts (4).
3. according to the described reinforcing bar wire drawing of claim 2, it is characterized in that: two described cover bodies (5) are the conical shell structure that rubber is made, two described cover body (5) one ends all are formed with an opening (51) and this end is fitted on template (1) inside wall, and the other end all is formed with a screwed hole (52) and this end is threaded on the described reinforcement rod (2).
4. according to each described reinforcing bar wire drawing in the claim 1 to 3, it is characterized in that: described reinforcement rod (2) middle part is welded with a circular sealing sheet (6).
CN 201320170434 2013-04-08 2013-04-08 Reinforcing steel bar drawing wire Expired - Lifetime CN203145461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320170434 CN203145461U (en) 2013-04-08 2013-04-08 Reinforcing steel bar drawing wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320170434 CN203145461U (en) 2013-04-08 2013-04-08 Reinforcing steel bar drawing wire

Publications (1)

Publication Number Publication Date
CN203145461U true CN203145461U (en) 2013-08-21

Family

ID=48973000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320170434 Expired - Lifetime CN203145461U (en) 2013-04-08 2013-04-08 Reinforcing steel bar drawing wire

Country Status (1)

Country Link
CN (1) CN203145461U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108716249A (en) * 2018-09-04 2018-10-30 苏州中正建设工程有限公司 A kind of pre-buried connection component of prefabricated outer wall panel bearing diagonal
CN114232452A (en) * 2021-12-02 2022-03-25 中铁十一局集团有限公司 Construction method and device for quick pull rod of large-section tower column of cable-stayed bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108716249A (en) * 2018-09-04 2018-10-30 苏州中正建设工程有限公司 A kind of pre-buried connection component of prefabricated outer wall panel bearing diagonal
CN114232452A (en) * 2021-12-02 2022-03-25 中铁十一局集团有限公司 Construction method and device for quick pull rod of large-section tower column of cable-stayed bridge

Similar Documents

Publication Publication Date Title
CN202644997U (en) Simple plugging device for wall-penetrating holes of wall
CN102296810A (en) Deformation joint template support structure and construction method thereof
CN202430997U (en) Reinforcing device for template of sump or elevator shaft
CN203145461U (en) Reinforcing steel bar drawing wire
CN204094925U (en) The internal mould device of prefabricated small box girder
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN207348459U (en) A kind of concrete blinding piece regulating device
CN202831624U (en) Template for deformation joint of shear wall
CN205000643U (en) Wall stagnant water bolt is worn to waterproof concrete shear force wall
CN205024827U (en) Prefabricated plate and roof beam connection structure
CN204676885U (en) A kind of steel concrete column template fast pacifies the system of tearing open
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN203097290U (en) Assembled type split bolt
CN210316555U (en) Novel female corner reinforcing piece for wood mold
CN201214898Y (en) Low beam template reinforcement machine
CN210152282U (en) Device for controlling thickness of cast-in-situ reinforced concrete floor
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN203050105U (en) Novel beam clamp capable of being used in turnover mode
CN203034796U (en) Reinforced device of shear wall end formwork
CN206987374U (en) A kind of formwork reinforcement system external corner fixture
CN202937002U (en) Metal net supporting fabricated formwork
CN203308098U (en) Trapezoid tooth split bolt
CN202380404U (en) Pot type rubber bearing mortar template
CN103195243A (en) Adjustable water stop split bolt
CN206158182U (en) A support system for single -side supporting formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130821

CX01 Expiry of patent term