CN203135307U - Temporary insulating holder for electrically connecting drainage wire - Google Patents
Temporary insulating holder for electrically connecting drainage wire Download PDFInfo
- Publication number
- CN203135307U CN203135307U CN 201320002238 CN201320002238U CN203135307U CN 203135307 U CN203135307 U CN 203135307U CN 201320002238 CN201320002238 CN 201320002238 CN 201320002238 U CN201320002238 U CN 201320002238U CN 203135307 U CN203135307 U CN 203135307U
- Authority
- CN
- China
- Prior art keywords
- wire
- clamp
- utility
- model
- drain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
一种带电接引流线临时绝缘夹持器,有长度大于安全距离100毫米~200毫米的绝缘杆,短绝缘杆的上、下两端分别连有地线夹。使用时,把本实用新型的上端地线夹持在架空电线上的适当位置,然后在10千伏架空电力线上带电安装并沟线夹,在10千伏架空电力线上带电安装并沟线夹后,一只手拿持并沟线夹,用另一只手把夹持在本实用新型下端地线上的引流线取出,然后把引流线固定在并沟线夹上。本实用新型有绝缘杆,短绝缘杆的上、下两端分别连有地线夹,可以很方便地挂置在作业附近的适当位置,也可以很方便地用一只手把夹持在本实用新型下端地线上的引流线取出,是一种在10千伏架空电力线上带电连接引流线作业时能节省设备和人工的引流线专用夹持器。
The utility model relates to a temporary insulation clamper for live connection and drain wire, which has an insulation rod whose length is 100 mm to 200 mm longer than the safety distance, and the upper and lower ends of the short insulation rod are respectively connected with ground wire clamps. When in use, clamp the upper ground wire of the utility model at an appropriate position on the overhead wire, then install the parallel ditch clamp on the 10 kV overhead power line, and install the parallel ditch clamp on the 10 kV overhead power line , hold the parallel ditch clamp with one hand, take out the drainage wire clamped on the ground wire at the lower end of the utility model with the other hand, and then fix the drainage wire on the parallel ditch clamp. The utility model has insulating rods, and the upper and lower ends of the short insulating rods are respectively connected with ground wire clamps, which can be conveniently hung at a suitable position near the operation, and can also be conveniently clamped by one hand. The utility model relates to taking out the drain wire on the ground wire at the lower end, which is a special holder for the drain wire that can save equipment and manpower when the 10 kV overhead power line is live connected to the drain wire.
Description
技术领域 technical field
本实用新型涉及一种10千伏带电接引流线时用辅助工具,特别是一种10千伏带电接引流线时用引流线的临时夹持器。 The utility model relates to an auxiliary tool for connecting a 10-kilovolt electrified drain wire, in particular to a temporary holder for a drain wire when a 10-kilovolt electrified wire is connected to the drain wire.
背景技术 Background technique
从10千伏架空电力线路向地面上的设备或其它分支线路连接引流线时,要用升降机把绝缘斗内的作业人员和提升到高空架空电力线附近作业,在绝缘斗提升前要把引流线的上端固定在绝缘斗上,在提升绝缘斗的同时,引流线的上端随作业人员同时提升到高空架空电力线附近。作业人员带电接引流线时,先在10千伏架空电力线上带电安装并沟线夹,再把引流线的上端连接在并沟线夹上。 When connecting the drain line from the 10 kV overhead power line to the equipment or other branch lines on the ground, use a lift to lift the workers in the insulation bucket to the vicinity of the high-altitude overhead power line. The upper end is fixed on the insulating bucket, and while the insulating bucket is lifted, the upper end of the drainage wire is simultaneously lifted to the vicinity of the high-altitude overhead power line with the operator. When connecting the drain wire with electricity, the operator first installs the parallel ditch clamp on the 10 kV overhead power line, and then connects the upper end of the drain wire to the parallel ditch clamp.
现有技术中,在把引流线的上端固定在绝缘斗上时,没有在高空连接引流线作业时专用的引流线固定工具,引流线是用绝缘锁杆或普通绝缘夹固定在绝缘斗上,从绝缘锁杆或普通绝缘夹上摘取引流线时要两只手并用,一只手开启绝缘锁杆或普通绝缘夹,另一只手握引流线,把引流线从绝缘锁杆或普通绝缘夹中取出。 In the prior art, when fixing the upper end of the drain wire on the insulating bucket, there is no special drain wire fixing tool for connecting the drain wire at high altitude. The drain wire is fixed on the insulating bucket with an insulating lock bar or a common insulating clip. When removing the drain wire from the insulation lock bar or ordinary insulation clip, use both hands. One hand opens the insulation lock bar or ordinary insulation clip, and the other hand holds the drain wire. Pull the drain wire from the insulation lock rod or ordinary insulation out of the folder.
在具体连接引流线作业时,作业人员先在10千伏架空电力线上带电安装并沟线夹后,作业人员的一只手不能离开并沟线夹,而只用另一只手不能从上述绝缘锁杆或普通绝缘夹中取出引流线,为了把引流线从上述绝缘锁杆或普通绝缘夹中取出,就需要另有一个人站在另一个绝缘斗上从绝缘锁杆或普通绝缘夹上摘取出引流线,交给作业人员,作业人员接到引流线后,再把引流线的上端连接在并沟线夹上。 When connecting the drain wires, the operator first installs the parallel ditch clamp on the 10 kV overhead power line, and one hand of the operator cannot leave the parallel ditch clamp, and the other hand cannot separate the insulation from the above insulation. Take out the drain wire from the lock bar or ordinary insulating clip. In order to take out the drain wire from the above insulating lock bar or ordinary insulating clip, another person needs to stand on another insulating bucket to remove it from the insulating lock bar or ordinary insulating clip. Take out the drainage line and give it to the operator. After receiving the drainage line, the operator will connect the upper end of the drainage line to the parallel ditch clamp.
在高空连接10千伏高压电的引流线作业虽然并不复杂,但由于电压较高,作业时要保证安全距离,10千伏高压电的安全距离是300毫米,在高空连接引流线时没有适用的专用引流线固定工具,在连接引流线作业时,需要双人双绝缘斗,浪费设备和人工。 Although it is not complicated to connect the drainage wire of 10 kV high-voltage electricity at high altitude, due to the high voltage, a safe distance must be ensured during operation. The safe distance of 10 kV high-voltage electricity is 300 mm. When connecting the drainage wire at high altitude There is no applicable special drainage wire fixing tool. When connecting the drainage wire, two people and double insulating buckets are needed, which wastes equipment and labor.
发明内容 Contents of the invention
本实用新型的目的是为了克服上述不足,提出一种在连接引流线作业时能节省设备和人工的带电接引流线临时绝缘夹持器。 The purpose of the utility model is to overcome the above-mentioned shortcomings, and propose a temporary insulation holder for live connection and drainage wire that can save equipment and labor when connecting the drainage wire.
本实用新型是用如下方法实现的。 The utility model is realized by following method.
带电接引流线临时绝缘夹持器有长度大于安全距离100毫米~200毫米的绝缘杆,短绝缘杆的上、下两端分别连有地线夹。 The temporary insulating holder for live connection and drain wire has an insulating rod with a length greater than the safety distance of 100 mm to 200 mm, and the upper and lower ends of the short insulating rod are respectively connected with ground wire clamps.
使用时,在绝缘斗提升前,用本实用新型把引流线的上端夹持在本实用新型的下端地线夹上,把本实用新型的上端地线夹持在绝缘斗上,在提升绝缘斗的同时,引流线的上端随作业人员同时被提升到高空架空电力线附近。作业人员带电接引流线时,先把夹持引流线的本实用新型从绝缘斗上取下,把本实用新型的上端地线夹持在架空电线上的适当位置,然后在10千伏架空电力线上带电安装并沟线夹,在10千伏架空电力线上带电安装并沟线夹后,一只手拿持并沟线夹,用另一只手把夹持在本实用新型下端地线上的引流线取出,然后把引流线固定在并沟线夹上。 When in use, before the insulation bucket is lifted, use the utility model to clamp the upper end of the drain wire on the lower ground wire clamp of the utility model, clamp the upper ground wire of the utility model on the insulation bucket, and lift the insulation bucket At the same time, the upper end of the drainage line is lifted to the vicinity of the overhead power line along with the operators. When the operator is electrified to connect the drain wire, the utility model holding the drain wire is first removed from the insulating bucket, the upper ground wire of the utility model is clamped at an appropriate position on the overhead wire, and then the utility model is clamped on the 10 kV overhead power line. Install the parallel ditch clamp on the live line, after installing the parallel ditch clamp on the 10 kV overhead power line, hold the parallel ditch clamp with one hand, and use the other hand to clamp the parallel ditch clamp on the ground wire at the lower end of the utility model. Take out the drainage wire, and then fix the drainage wire on the parallel groove clamp.
本实用新型有绝缘杆,短绝缘杆的上、下两端分别连有地线夹,可以很方便地挂置在作业附近的适当位置,也可以很方便地用一只手把夹持在本实用新型下端地线上的引流线取出,是一种在10千伏架空电力线上带电连接引流线作业时能节省设备和人工的引流线专用夹持器。 The utility model has insulating rods, and the upper and lower ends of the short insulating rods are respectively connected with ground wire clamps, which can be conveniently hung at a suitable position near the operation, and can also be conveniently clamped by one hand. The utility model relates to taking out the drain wire on the ground wire at the lower end, which is a special holder for the drain wire that can save equipment and manpower when the 10 kV overhead power line is live connected to the drain wire.
下面结合附图,对本实用新型作进一步地说明。 Below in conjunction with accompanying drawing, the utility model is described further.
附图说明 Description of drawings
图1是根据本实用新型的发明方案提出的一种带电接引流线临时绝缘夹持器的主视示意图。 Fig. 1 is a schematic front view of a temporary insulating holder for live connection and drain wires proposed according to the inventive solution of the utility model.
具体实施方式 Detailed ways
图1中,带电接引流线临时绝缘夹持器有长度大于安全距离100毫米~200毫米的绝缘杆1,短绝缘杆的上、下两端分别连有地线夹2、3。上、下两端的地线夹之间是电绝缘。 In Fig. 1, the temporary insulating holder for the electrified drain wire has an insulating rod 1 with a length greater than the safety distance of 100 mm to 200 mm, and the upper and lower ends of the short insulating rod are respectively connected with ground wire clamps 2 and 3. There is electrical insulation between the ground clamps at the upper and lower ends.
10千伏高压电的安全距离是300毫米,本实用新型绝缘杆的长度是400毫米~500毫米。 The safe distance of 10 kV high voltage is 300 millimeters, and the length of the insulating rod of the utility model is 400 millimeters ~ 500 millimeters.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320002238 CN203135307U (en) | 2013-01-05 | 2013-01-05 | Temporary insulating holder for electrically connecting drainage wire |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320002238 CN203135307U (en) | 2013-01-05 | 2013-01-05 | Temporary insulating holder for electrically connecting drainage wire |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203135307U true CN203135307U (en) | 2013-08-14 |
Family
ID=48943248
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201320002238 Expired - Lifetime CN203135307U (en) | 2013-01-05 | 2013-01-05 | Temporary insulating holder for electrically connecting drainage wire |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203135307U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103022933A (en) * | 2013-01-06 | 2013-04-03 | 辽宁省电力有限公司铁岭供电公司 | Temporary insulating clamper for electrically connecting drainage wire |
| CN105186153A (en) * | 2015-09-11 | 2015-12-23 | 国家电网公司 | Multi-layer line grounding wire |
| CN111604872A (en) * | 2020-06-08 | 2020-09-01 | 国网天津市电力公司 | An insulating bucket tool box |
-
2013
- 2013-01-05 CN CN 201320002238 patent/CN203135307U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103022933A (en) * | 2013-01-06 | 2013-04-03 | 辽宁省电力有限公司铁岭供电公司 | Temporary insulating clamper for electrically connecting drainage wire |
| CN105186153A (en) * | 2015-09-11 | 2015-12-23 | 国家电网公司 | Multi-layer line grounding wire |
| CN111604872A (en) * | 2020-06-08 | 2020-09-01 | 国网天津市电力公司 | An insulating bucket tool box |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102185267B (en) | 66KV ground potential hot-line make-and-break bypassing method | |
| CN203260950U (en) | 10kV power distribution rack live-replacement drop-out type fuse device | |
| CN202384516U (en) | Secondary voltage drop live-line wiring device | |
| CN103022933A (en) | Temporary insulating clamper for electrically connecting drainage wire | |
| CN102931612A (en) | Conducting wire fixer for 10kV live working | |
| CN201562769U (en) | UHV grounding wire device | |
| CN203551609U (en) | Telescopic short circuit device | |
| CN104134963A (en) | Parallel groove clamp insulation protective cover | |
| CN105259375A (en) | Wire clamp type insulating rod apparatus specially for point polarity | |
| CN202026035U (en) | Wire fixing device for live line work of overhead line | |
| CN103532040A (en) | Special tool and method for fixing middle-phase bypass jumper during 10kV hot-line working | |
| CN104184071B (en) | Unmanned plane installs 110kV 500kV line security ground wire device | |
| CN203224514U (en) | Current transformer polarity test wire hanging rod | |
| CN203039273U (en) | Transformer station tubular busbar double-clamp grounding device | |
| CN203553399U (en) | Grounding wire apparatus for transformer station | |
| CN203607727U (en) | Substation grounding device | |
| CN202550391U (en) | High-voltage power maintenance implement | |
| CN203085783U (en) | 10kV overhead line fixed-point installation grounding device | |
| CN203180115U (en) | Rapid wiring device of wires | |
| CN203942245U (en) | Bispin compact form connects cable guide | |
| CN207183201U (en) | Livewire work fuse switch part flow arrangement | |
| CN204030428U (en) | A kind of parallel groove clamp insulating shield special isolation mounting rod head | |
| CN204011797U (en) | A kind of earthing wire clip | |
| CN202189907U (en) | Grounding device with electricity testing function | |
| CN103532046B (en) | A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20130814 |
|
| CX01 | Expiry of patent term |