CN203127658U - Material supply system - Google Patents

Material supply system Download PDF

Info

Publication number
CN203127658U
CN203127658U CN 201320007618 CN201320007618U CN203127658U CN 203127658 U CN203127658 U CN 203127658U CN 201320007618 CN201320007618 CN 201320007618 CN 201320007618 U CN201320007618 U CN 201320007618U CN 203127658 U CN203127658 U CN 203127658U
Authority
CN
China
Prior art keywords
belt
belt feeder
cabin
grades
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320007618
Other languages
Chinese (zh)
Inventor
李一勇
刘德进
关秋枫
蒋健
付院平
张乃受
彭瑞
曲俐俐
陆连洲
王正权
马宗田
宿发强
汪立宏
张建军
尚乾坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN 201320007618 priority Critical patent/CN203127658U/en
Application granted granted Critical
Publication of CN203127658U publication Critical patent/CN203127658U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model belongs to immersed tunnel building, and discloses a material supply system. The material supply system comprises a ship body and a material transportation unit arranged on the ship body. The material transportation unit comprises a discharging module and a multi-stage material lifting transportation module, wherein the multi-stage material lifting transportation module is used for receiving materials supplied by the discharging module and transporting the materials, and multi-stage lifting is carried out on the materials by the multi-stage material lifting transportation module, the materials reach the preset height and are transported to a leveling ship. The multi-stage lifting is carried out on the materials by the multi-stage material lifting transportation module, the materials reach the preset height, the multi-stage lifting can guarantee that inclination angles of belt machines used for lifting in each stage are not big, and material conveying efficiency is improved.

Description

Material suppling system
Technical field
The utility model relates to immersed tube tunnel to be built, and particularly relates to a kind of material suppling system.
Background technology
Carrying out subaqueous tunnel when building, need use the leveling ship, flatten peculiar to vesselly at bottom laying bedding, immersed tube tunnel is arranged on the bedding.The leveling ship need use a large amount of materials when laying bedding, this just need have material suppling system to be continuously the leveling ship provides material.When relating to the laying of immersed tube tunnel bedding in the prior art, selecting steel single deck self-propelled covered lighter usually for use, and the building stones belt feeder system that carries is set thereon, is " rubble is laid the leveling ship " continuous feeding by carrying building stones belt feeder system.
The job content of material suppling system is, building stones are promoted, send in the hopper of leveling ship, and the material suppling system specification requirements is shown in following table one:
Table one
Used material suppling system dimensions is less in the prior art, a belt feeder only is set on the material suppling system carries out the building stones conveying, when relating to mega project, material suppling system of the prior art just is difficult to meet requirements, building stones can't be transported to enough height, especially the building stones of tens meters height are carried, under the limited condition of ship length, can only promote by the angle of inclination that increases belt feeder, but the belt feeder angle of inclination is arranged when excessive, the easy landing of building stones, transport efficiency is low, can not satisfy the engineering construction needs.
The utility model content
(1) technical matters that will solve
The technical problems to be solved in the utility model is how to improve material suppling system is carried building stones in efficient from heavy construction to the high position.
(2) technical scheme
In order to solve the problems of the technologies described above, the utility model provides a kind of material suppling system, and it comprises: hull, and be arranged on mass transport unit on the described hull; Described mass transport unit comprises cutting module and accepts described cutting module and supply with material and the multistage material that this material is carried is promoted conveyor module that described multistage material promotes conveyor module described material multi is promoted to preset height and is sent to the leveling ship.
Wherein, described multistage material lifting conveyor module comprises being arranged in the belt cabin supplies with following belt feeder in the cabin of material to accept described cutting module, and at least three grades of belt elevator machines that connect following belt feeder in the described cabin, described at least three grades of belt elevator machines link to each other in turn, so that described material is promoted step by step.
Wherein, described multistage material promotes conveyor module and comprises three grades of belt elevator machines, the stem of one-level belt elevator machine wherein links to each other with following belt feeder in the described cabin by horizontal belt feeder, the stem of two-stage hoisting belt feeder links to each other with the afterbody of described one-level belt elevator machine, the stem of three grades of belt elevator machines links to each other with the afterbody of described two-stage hoisting belt feeder, and the tail height of described three grades of belt elevator machines is identical with described preset height.
Wherein, link to each other by passage between the stem of the afterbody of described one-level belt elevator machine and described two-stage hoisting belt feeder.
Wherein, the stem of described one-level belt elevator machine is positioned at described belt cabin, and its afterbody is positioned at described hull top.
(3) beneficial effect
The material suppling system that technique scheme provides, use multistage material to promote conveyor module material is carried out multistage lifting, so that it reaches preset height, the existence of multistage lifting, can guarantee that the employed belt feeder of each grade lifting angle of inclination can be very not big, improve the efficient that material transmits, and material can be transmitted higher, satisfy the needs that transmit heavy construction material high position.
Description of drawings
Fig. 1 is the structural representation of the material suppling system of the utility model embodiment.
Wherein, 1: belt feeder under in the cabin; 2: horizontal belt feeder; 3: one-level belt elevator machine; 4: the two-stage hoisting belt feeder; 5: passage; 6: hopper; 7: three grades of belt elevator machines.
The specific embodiment
Below in conjunction with drawings and Examples, the specific embodiment of the present utility model is described in further detail.Following examples are used for explanation the utility model, but are not used for limiting scope of the present utility model.
Fig. 1 shows the structural representation of present embodiment material suppling system, and with reference to diagram, the present embodiment material suppling system comprises hull, and is arranged on the mass transport unit on the described hull; Described mass transport unit comprises cutting module and accepts described cutting module and supply with material and the multistage material that this material is carried is promoted conveyor module that described multistage material promotes conveyor module described material multi is promoted to preset height and is sent to the leveling ship.The material suppling system of this structure utilizes multistage material lifting conveyor module that material is carried out multistage lifting, is satisfying under the situation of preset height, can reduce the angle of inclination of belt feeder in every stage material conveying, improves mass transport efficient.
Particularly, described multistage material lifting conveyor module comprises being arranged in the belt cabin supplies with following belt feeder 1 in the cabin of material to accept described cutting module, and at least three grades of belt elevator machines that connect following belt feeder 1 in the described cabin, described at least three grades of belt elevator machines link to each other in turn, so that described material is promoted step by step, be that following belt feeder 1 is arranged in the belt cabin in the cabin, described cutting module comprises setting a plurality of hoppers 6 belowdecks, the discharging opening of described hopper 6 is positioned at the top of belt feeder 1 under the described cabin, material on the hull is sent to by hopper 6 and descends on the belt feeder 1 in the cabin, be sent to the belt elevator machine by following belt feeder 1 in the cabin again, at least three grades of conveyings that the belt elevator machine hoists to material successively, finally make material reach preset height, use to supply with the leveling ship.
The progression of belt elevator machine waits to set according to the size of the required height that reaches of material in the engineering, hull, and is higher when the height of the required transmission of material, when hull has corresponding length, can suitably increase the progression of belt elevator machine, and vice versa.In the present embodiment, described multistage material promotes conveyor module and is provided with three grades of belt elevator machines, be respectively the one-level belt elevator machine 3 shown in Fig. 1, two-stage hoisting belt feeder 4 and three grades of belt feeders 7, the stem of one-level belt elevator machine 3 is positioned at the belt cabin, afterbody is positioned at the hull top, the stem of one-level belt elevator machine 3 links to each other with following belt feeder 1 in the described cabin by horizontal belt feeder 2, laterally belt feeder 2 is used for material is turned to, belt feeder 1 is in the process of convey materials under in the cabin, at afterbody material is tentatively promoted, material is by one-level belt elevator machine 3 delivers from vault; The stem of two-stage hoisting belt feeder 4 links to each other with the afterbody of described one-level belt elevator machine 3, and the stem of meeting tier 2 belt elevator machine 4 is positioned at the afterbody below of one-level belt elevator machine 3, the stem of three grades of belt elevator machines 7 links to each other with the afterbody of described two-stage hoisting belt feeder 4, the tail height of three grades of belt elevator machines 7 is identical with described preset height, so that material is sent on the two-stage hoisting belt feeder 4, is sent on three grades of belt elevator machines 7 by two-stage hoisting belt feeder 4 by one-level belt elevator machine 3, and finally by three grades of belt elevator machines 7 material is sent to the leveling ship.
In order to realize by the effective conveying of one-level belt elevator machine 3 to the material of two-stage hoisting belt feeder 4, between the stem of the afterbody of one-level belt elevator machine 3 and two-stage hoisting belt feeder 4, passage 5 is set, material is guided on the two-stage hoisting belt feeder 4 by one-level belt elevator machine 3 exactly.
As can be seen from the above embodiments, the utility model uses multistage material lifting conveyor module that material is carried out multistage lifting, so that it reaches preset height, the existence of multistage lifting, can guarantee that the employed belt feeder of each grade lifting angle of inclination can be very not big, improve the efficient that material transmits, and material can be transmitted higher, satisfy the needs that transmit heavy construction material high position.
The above only is preferred implementation of the present utility model; should be understood that; for those skilled in the art; under the prerequisite that does not break away from the utility model know-why; can also make some improvement and replacement, these improvement and replacement also should be considered as protection domain of the present utility model.

Claims (5)

1. a material suppling system is characterized in that, comprising: hull, and be arranged on mass transport unit on the described hull; Described mass transport unit comprises cutting module and accepts described cutting module and supply with material and the multistage material that this material is carried is promoted conveyor module that described multistage material promotes conveyor module described material multi is promoted to preset height and is sent to the leveling ship.
2. material suppling system as claimed in claim 1, it is characterized in that, described multistage material lifting conveyor module comprises being arranged in the belt cabin supplies with following belt feeder in the cabin of material to accept described cutting module, and at least three grades of belt elevator machines that connect following belt feeder in the described cabin, described at least three grades of belt elevator machines link to each other in turn, so that described material is promoted step by step.
3. material suppling system as claimed in claim 2, it is characterized in that, described multistage material promotes conveyor module and comprises three grades of belt elevator machines, the stem of one-level belt elevator machine wherein links to each other with following belt feeder in the described cabin by horizontal belt feeder, the stem of two-stage hoisting belt feeder links to each other with the afterbody of described one-level belt elevator machine, the stem of three grades of belt elevator machines links to each other with the afterbody of described two-stage hoisting belt feeder, and the tail height of described three grades of belt elevator machines is identical with described preset height.
4. material suppling system as claimed in claim 3 is characterized in that, links to each other by passage between the afterbody of described one-level belt elevator machine and the stem of described two-stage hoisting belt feeder.
5. material suppling system as claimed in claim 3 is characterized in that, the stem of described one-level belt elevator machine is positioned at described belt cabin, and its afterbody is positioned at described hull top.
CN 201320007618 2013-01-08 2013-01-08 Material supply system Expired - Lifetime CN203127658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320007618 CN203127658U (en) 2013-01-08 2013-01-08 Material supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320007618 CN203127658U (en) 2013-01-08 2013-01-08 Material supply system

Publications (1)

Publication Number Publication Date
CN203127658U true CN203127658U (en) 2013-08-14

Family

ID=48935658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320007618 Expired - Lifetime CN203127658U (en) 2013-01-08 2013-01-08 Material supply system

Country Status (1)

Country Link
CN (1) CN203127658U (en)

Similar Documents

Publication Publication Date Title
CN203127109U (en) Feeding backfilling boat
CN103911999B (en) Material backfill system
CN201834537U (en) Spacer device for ordered conveying of production line
CN203127658U (en) Material supply system
CN106429487B (en) A kind of optimal path transport system and its raw material store production technology in parallel with mixing
CN103350891B (en) Vibrate stacking clearing system
CN106608510B (en) A kind of two-way conveying equipment and its application method
CN103723528B (en) Ore stockpile discharge system
CN106494905A (en) A kind of bridge-type chain bucket reclaimer of the continuous feeding in many storehouse lattice raw material workshops
CN203667459U (en) Concrete aggregate belt conveying and sorting device
CN206494539U (en) A kind of continuous feeding device of not building bridge of fruit shell carbon production line
CN202924332U (en) Conveying system in cement production
CN204847413U (en) Large -scale bauxite is stored up and is carried
CN203450745U (en) Material receiving and conveying mechanism applicable to automatic pulp feeder
CN103395614B (en) Surface mining conveyer device and carrying method
CN202953411U (en) Large-dip-angle belt conveyor for light materials
CN206307676U (en) A kind of efficient mixed slack coal transferring mechanism
CN206395489U (en) A kind of optimal path induction system
CN202640569U (en) Mining concrete concentrated stirring station
CN206529064U (en) A kind of novel granary multiple spot heap feeding device
CN203638797U (en) Lateral grain guide plate of barn conveyor
CN204616726U (en) The semi-automatic track pay-off of a kind of duck shed balk cargo
CN203359551U (en) Petroleum coke raw material conveying device in electrolytic aluminum industry anode manufacturing plant
CN203545183U (en) Ore storage yard discharge system
CN201914859U (en) Stone material delivery device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130814

CX01 Expiry of patent term