CN203118515U - 一种适应电网调峰的压水堆核电厂常规岛 - Google Patents
一种适应电网调峰的压水堆核电厂常规岛 Download PDFInfo
- Publication number
- CN203118515U CN203118515U CN2012204952880U CN201220495288U CN203118515U CN 203118515 U CN203118515 U CN 203118515U CN 2012204952880 U CN2012204952880 U CN 2012204952880U CN 201220495288 U CN201220495288 U CN 201220495288U CN 203118515 U CN203118515 U CN 203118515U
- Authority
- CN
- China
- Prior art keywords
- steam
- power plant
- nuclear power
- generation module
- industrial steam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
Landscapes
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
本实用新型提供了一种适应电网调峰的压水堆核电厂常规岛,包括汽轮发电模块,其特征在于:还包括工业蒸汽供应模块,来自核岛蒸汽发生器的饱和蒸汽分为两路,一路连接至汽轮发电模块,另一路连接至工业蒸汽供应模块,汽轮发电模块接至电网,同时,由工业蒸汽供应模块的工业蒸汽输出端提供工业蒸汽。本实用新型的核电厂常规岛在压水堆核岛保持满负荷功率输出状态下,能够参与电网调峰、并保持经济运行。
Description
技术领域
本实用新型涉及一种适应电网调峰的压水堆核电厂常规岛,属于核能发电技术领域。
背景技术
随着我国对能源安全和环保观念的增强以及对可持续发展的要求,核电作为一种清洁、可靠、唯一可大规模替代化石能源的发电形式,越来越受到青睐,根据《核电中长期发展规划(2005-2020年)》,2020年核电机组装机容量将达到至少4000万千瓦,可以预见,随着一大批百万千瓦级大型核电机组的逐步建成投运,核电装机容量在区域电网比重将逐渐扩大。随着电网负荷峰谷差的不断加大和发电市场竞争规则的完备,大型压水堆核电机组参与电网调峰势在必行。
随着技术的发展,现在的压水堆具备了越来越优秀的负荷适应能力,例如美国核电用户要求文件(URD)规定三代核电机组要具备日负荷跟踪能力。但压水堆核岛参与电网调峰仍面临诸多安全问题(燃料包芯破损、LOCA)和经济损失(反应堆按照满负荷运行进行装料,且换料周期固定)。
发明内容
本实用新型的目的是提供一种在压水堆核岛保持满负荷功率输出状态下,能够参与电网调峰、并保持经济运行的核电厂常规岛。
为了达到上述目的,本实用新型的技术方案是提供了一种适应电网调峰的压水堆核电厂常规岛,包括汽轮发电模块,其特征在于:还包括工业蒸汽供应模块,来自核岛蒸汽发生器的饱和蒸汽分为两路,一路连接至汽轮发电模块,另一路连接至工业蒸汽供应模块,汽轮发电模块接至电网,同时,由工业蒸汽供应模块的工业蒸汽输出端提供工业蒸汽。
优选地,所述汽轮发电模块包括相互连接的汽轮机及发电机,所述饱和蒸汽通过管道及汽轮机发电模块进汽阀组连接汽轮机,汽轮机连接凝汽器,凝汽器的输入端还连接第一除盐水泵,凝汽器的输出端连接第一给水泵。
优选地,所述工业蒸汽供应模块包括蒸汽发生器,所述饱和蒸汽通过管道及工业蒸汽供应模块进汽阀组连接蒸汽发生器,蒸汽发生器与第二除盐水泵及第二给水泵相连。
当汽轮发电模块参与电网调峰时,汽轮机采用节流调节,进汽阀组开度减小。这时候现役核电机组通常的做法是让反应堆控制棒下插,使反应堆功率输出减少,这种做法无疑让堆芯燃料包块、一回路所有设备承受一次热力循环,对安全构成挑战,另外还由于压水堆按照满负荷进行装料、换料周期固定,而造成非常大的经济损失。而本实用新型配备了工业蒸汽供应模块,汽轮发电模块在参与调峰时,反应堆输出功率保持不变,在减小汽轮机发电模块进汽阀组开度的同时,开大工业蒸汽供应模块进汽阀组,来自核岛的蒸汽,再通过一个蒸汽发生器进行换热(确保在核岛一回路发生高能管道破裂时,无放射性物质扩散道输出的工业蒸汽中),并将工业蒸汽输出至厂外工业原料制备的自动化生产及其存贮模块,这样不仅避免了对核岛的安全挑战,还能够使核电机组保持经济运行。
综上所述,本实用新型的核电厂常规岛在压水堆核岛保持满负荷功率输出状态下,能够参与电网调峰、并保持经济运行。
附图说明
图1为本实用新型提供的一种适应电网调峰的压水堆核电厂常规岛的结构示意图。
具体实施方式
为使本实用新型更明显易懂,兹以一优选实施例,并配合附图作详细说明如下。
如图1所示,本实用新型提供的一种适应电网调峰的压水堆核电厂常规岛,包括汽轮发电模块,其特征在于:还包括工业蒸汽供应模块,来自核岛蒸汽发生器的饱和蒸汽分为两路,一路连接至汽轮发电模块,另一路连接至工业蒸汽供应模块,汽轮发电模块接至电网,同时,由工业蒸汽供应模块的工业蒸汽输出端为工业原料自动化生产模块7提供工业蒸汽。
汽轮发电模块包括相互连接的汽轮机ST及发电机G,饱和蒸汽通过管道及汽轮机发电模块进汽阀组STV连接汽轮机ST,汽轮机ST连接凝汽器1,凝汽器1的输入端还连接第一除盐水泵2,凝汽器1的输出端连接第一给水泵3。
工业蒸汽供应模块包括蒸汽发生器SG,饱和蒸汽通过管道及工业蒸汽供应模块进汽阀组STV连接蒸汽发生器SG,蒸汽发生器SG与第二除盐水泵4及第二给水泵5相连。
Claims (3)
1.一种适应电网调峰的压水堆核电厂常规岛,包括汽轮发电模块,其特征在于:还包括工业蒸汽供应模块,来自核岛蒸汽发生器的饱和蒸汽分为两路,一路连接至汽轮发电模块,另一路连接至工业蒸汽供应模块,汽轮发电模块接至电网,同时,由工业蒸汽供应模块的工业蒸汽输出端提供工业蒸汽。
2.如权利要求1所述的一种适应电网调峰的压水堆核电厂常规岛,其特征在于:所述汽轮发电模块包括相互连接的汽轮机(ST)及发电机(G),所述饱和蒸汽通过管道及汽轮机发电模块进汽阀组(STV)连接汽轮机(ST),汽轮机(ST)连接凝汽器(1),凝汽器(1)的输入端还连接第一除盐水泵(2),凝汽器(1)的输出端连接第一给水泵(3)。
3.如权利要求1所述的一种适应电网调峰的压水堆核电厂常规岛,其特征在于:所述工业蒸汽供应模块包括蒸汽发生器(SG),所述饱和蒸汽通过管道及工业蒸汽供应模块进汽阀组(STV)连接蒸汽发生器(SG),蒸汽发生器(SG)与第二除盐水泵(4)及第二给水泵(5)相连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012204952880U CN203118515U (zh) | 2012-09-25 | 2012-09-25 | 一种适应电网调峰的压水堆核电厂常规岛 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012204952880U CN203118515U (zh) | 2012-09-25 | 2012-09-25 | 一种适应电网调峰的压水堆核电厂常规岛 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203118515U true CN203118515U (zh) | 2013-08-07 |
Family
ID=48898838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012204952880U Expired - Lifetime CN203118515U (zh) | 2012-09-25 | 2012-09-25 | 一种适应电网调峰的压水堆核电厂常规岛 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203118515U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104616709A (zh) * | 2015-01-23 | 2015-05-13 | 福建省电力勘测设计院 | 基于核电机组失步振荡的安全稳定控制方法 |
CN107132780A (zh) * | 2017-04-25 | 2017-09-05 | 中广核研究院有限公司 | 一种筛选核电厂待评估系统的方法及装置 |
-
2012
- 2012-09-25 CN CN2012204952880U patent/CN203118515U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104616709A (zh) * | 2015-01-23 | 2015-05-13 | 福建省电力勘测设计院 | 基于核电机组失步振荡的安全稳定控制方法 |
CN107132780A (zh) * | 2017-04-25 | 2017-09-05 | 中广核研究院有限公司 | 一种筛选核电厂待评估系统的方法及装置 |
CN107132780B (zh) * | 2017-04-25 | 2019-09-27 | 中广核研究院有限公司 | 一种筛选核电厂待评估系统的方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107204632B (zh) | 一种提升风电消纳的柔性负荷优化调度方法 | |
CN102820656B (zh) | 风电机组同火电机组联合调度发电负荷的方法 | |
CN103580063A (zh) | 一种基于需方响应消纳大规模并网风电的方法 | |
CN107834584A (zh) | 基于agc控制的辅助调峰调频设施系统 | |
CN103728881A (zh) | 一种多楼宇冷热电联供系统的优化运行方法 | |
CN210568762U (zh) | 一种用于热网侧耦合电蓄热调峰的热电联产集中供热系统 | |
CN201387242Y (zh) | 隧道窑余热发电装置 | |
CN203118515U (zh) | 一种适应电网调峰的压水堆核电厂常规岛 | |
Li et al. | Capacity Coordinated Optimization of Battery, Thermal and Hydrogen Storage System for Multi-energy Complementary Power System | |
Xiong et al. | Case studies of demand response in multi-energy industrial parks | |
CN110259654B (zh) | 太阳能湿空气透平水电联产系统及其工作方法 | |
Xiaoxu et al. | Review on modeling of multi-heterogeneous energy systems | |
CN203533512U (zh) | 一种小型热电联产装置 | |
Kim et al. | The energy-efficient, economical, and environmental impacts of microturbines on residential customers | |
CN207297161U (zh) | 一种多台并网发电机组 | |
Shaoyu et al. | Study on the optimal allocation of regional IES based on homer | |
CN214100875U (zh) | 一种利用热网储能提高供暖期电网调峰调频性能的系统 | |
CN205036415U (zh) | 一种小型高温高压组合式再热汽轮发电机组装置 | |
Yu et al. | Planning of central energy station in community integrated energy system with electrical and heat storage devices | |
Islam et al. | Bagasse, Coal and Biogas Based Cogeneration Rising Trend in Bangladesh for Energy Crisis | |
Volkova et al. | Simulation of the accumulator tank coupled with the power unit of power plant under the conditions of open electricity market | |
Weichun et al. | Research on economic operation of multi-source peak-shaving involving nuclear power | |
Zhang et al. | Economical Dispatching Strategy of Multi-Energy Coupling Energy System of Offshore Island Considering Concentrating Solar Power Plant | |
Wang et al. | Quantitative Analysis of Key Influencing Factors of Renewable Energy Accommodation in Hunan Power Grid | |
Feng et al. | Distributed Robust Optimal Scheduling for Integrated Energy System Considering Source-Load Uncertainty |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130807 |
|
CX01 | Expiry of patent term |