CN203114332U - Installation structure of prop pulling hoist in tunnel - Google Patents

Installation structure of prop pulling hoist in tunnel Download PDF

Info

Publication number
CN203114332U
CN203114332U CN 201320033368 CN201320033368U CN203114332U CN 203114332 U CN203114332 U CN 203114332U CN 201320033368 CN201320033368 CN 201320033368 CN 201320033368 U CN201320033368 U CN 201320033368U CN 203114332 U CN203114332 U CN 203114332U
Authority
CN
China
Prior art keywords
tunnel
prop pulling
pillar
pulling hoist
drawing hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320033368
Other languages
Chinese (zh)
Inventor
杨家坤
张德华
马彦领
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Suzhou Longhua Machinery Manufacturing Co Ltd
Original Assignee
Anhui Suzhou Longhua Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Suzhou Longhua Machinery Manufacturing Co Ltd filed Critical Anhui Suzhou Longhua Machinery Manufacturing Co Ltd
Priority to CN 201320033368 priority Critical patent/CN203114332U/en
Application granted granted Critical
Publication of CN203114332U publication Critical patent/CN203114332U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses an installation structure of a prop pulling hoist in a tunnel. The installation structure of the prop pulling hoist in the tunnel comprises the tunnel, a shed support which is installed inside the tunnel, and the prop pulling hoist which is located inside the tunnel. A front inclined strut which inclines forwards and a back inclined strut which inclines backwards are respectively fixed at the front end and the back end of a prop pulling hoist base large U-bar. The upper ends of the front inclined strut and the back inclined strut are installed on a shed beam inside the tunnel in a hinge joint mode. A vertical strut is vertically fixed at the middle position of the prop pulling hoist base large U-bar. The upper end of the vertical strut is also installed on the shed beam inside the tunnel in a hinge joint mode. The front inclined strut and a tunnel inner baseboard form a 75-degree included angle, and the back inclined strut and the tunnel inner baseboard form a 70-80-degree included angle. The installation structure of the prop pulling hoist in the tunnel is simple in installation method, good in stability, convenient to move, reliable and safe to use, and good in practical performance by the adoption of a plurality of struts to drag and stabilize the prop pulling hoist.

Description

The mounting structure of drawing hoist in the tunnel
Technical field
The utility model mainly is the mounting structure of drawing hoist in a kind of tunnel, particularly is applicable in girdle, medium-thickness seam and half-edge coal seam coal-face or the tunnel of gradient less than 30o to be used as haul, to move chute and to move the drawing hoist of back work such as belt conveyer head traction.
Background technology
Drawing hoist is mainly used in the resettlement of prop drawing caving under the coal mine, performing comprehensive coal mining equipment and the traction that work plane is installed, and the installation site of winch should make its rope outlet direction vertical with spool axis as far as possible, to be conducive to row's rope.Because winch must often move with the propelling of coal-face, require that fixing means is easy, reliable, safety.Thereby the normal rope bolt method that adopts, by rope drawing hoist is installed, its strong point is few, and is wayward.
The utility model content
Technical problem to be solved in the utility model provides the mounting structure of drawing hoist in a kind of tunnel, and its mounting means is simple, utilizes the traction of many pillars stablize drawing hoist, and not only stability well but also convenient movement used reliable and securely, and Practical Performance is good.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
The mounting structure of drawing hoist in a kind of tunnel, include the shed shoring of installing in tunnel, the tunnel, the drawing hoist that is positioned at the tunnel, it is characterized in that: the top rake pillar and the sweptback rear-inclined pillar that turn forward are fixedly arranged respectively on the front and back ends of the big channel-section steel of described drawing hoist base, the upper end of described forward and backward oblique strut is hingedly mounted on the capplce in the tunnel, the centre position vertical fixing of the big channel-section steel of described drawing hoist base has plumb post, and the upper end of described plumb post also is hingedly mounted on the capplce in the tunnel; Described top rake pillar becomes 75 ° of angles with the tunnel inner bottom plating, the rear-inclined pillar becomes the angle of 70o~80 ° with the tunnel inner bottom plating.
Top rake pillar on the big channel-section steel of described drawing hoist base, middle plumb post and rear-inclined pillar have two respectively.
Float coal, the rubble of installation place are cleaned out in must be with the tunnel before drawing hoist is installed, and the ground of installation place should smooth, no concave-convex phenomenon, with pillar winch is withstood between tunnel inside ceiling panel and the base plate after the position of winch, direction etc. are adjusted again.
The utility model has the advantages that:
The utility model mounting means is simple, utilizes the traction of many pillars stablize drawing hoist, and not only stability well but also convenient movement used reliable and securely, and Practical Performance is good.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Referring to Fig. 1, the mounting structure of drawing hoist in a kind of tunnel, include tunnel 1, the shed shoring of installing in the tunnel 12, be positioned at the drawing hoist 3 in tunnel 1, before the big channel-section steel 4 of described drawing hoist 3 bases, the top rake pillar 5 and the sweptback rear-inclined pillar 6 that turn forward are fixedly arranged respectively on the rear end, before described, rear- inclined pillar 5,6 upper end is hingedly mounted on the capplce 8 in the tunnel 1, the centre position vertical fixing of the big channel-section steel 4 of described drawing hoist 3 bases has plumb post 7, and the upper end of described plumb post 7 also is hingedly mounted on the capplce 8 in the tunnel 1; 9 one-tenth 75 ° of angles of described top rake pillar 5 and tunnel 1 inner bottom plating, the angle of 9 one-tenth 70o of rear-inclined pillar 6 and tunnel 1 inner bottom plating~80 °.
Top rake pillar 5 on the big channel-section steel 4 of described drawing hoist base, middle plumb post 7 and rear-inclined pillar 6 have two respectively.

Claims (2)

1. the mounting structure of drawing hoist in the tunnel, include the shed shoring of installing in tunnel, the tunnel, the drawing hoist that is positioned at the tunnel, it is characterized in that: the top rake pillar and the sweptback rear-inclined pillar that turn forward are fixedly arranged respectively on the front and back ends of the big channel-section steel of described drawing hoist base, the upper end of described forward and backward oblique strut is hingedly mounted on the capplce in the tunnel, the centre position vertical fixing of the big channel-section steel of described drawing hoist base has plumb post, and the upper end of described plumb post also is hingedly mounted on the capplce in the tunnel; Described top rake pillar becomes 75 ° of angles with the tunnel inner bottom plating, the rear-inclined pillar becomes the angle of 70o~80 ° with the tunnel inner bottom plating.
2. the mounting structure of drawing hoist in a kind of tunnel according to claim 1 is characterized in that: the top rake pillar on the big channel-section steel of described drawing hoist base, middle plumb post and rear-inclined pillar have two respectively.
CN 201320033368 2013-01-22 2013-01-22 Installation structure of prop pulling hoist in tunnel Expired - Fee Related CN203114332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320033368 CN203114332U (en) 2013-01-22 2013-01-22 Installation structure of prop pulling hoist in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320033368 CN203114332U (en) 2013-01-22 2013-01-22 Installation structure of prop pulling hoist in tunnel

Publications (1)

Publication Number Publication Date
CN203114332U true CN203114332U (en) 2013-08-07

Family

ID=48894692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320033368 Expired - Fee Related CN203114332U (en) 2013-01-22 2013-01-22 Installation structure of prop pulling hoist in tunnel

Country Status (1)

Country Link
CN (1) CN203114332U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105921941A (en) * 2016-05-27 2016-09-07 张建 Assembling process of prop-pulling hoist

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105921941A (en) * 2016-05-27 2016-09-07 张建 Assembling process of prop-pulling hoist
CN105921941B (en) * 2016-05-27 2017-11-07 张建 A kind of assembly technology of drawing hoist

Similar Documents

Publication Publication Date Title
CN204899184U (en) Hanging flower basket equipment
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
CN202596762U (en) Baffle-type filling hydraulic bracket
CN203114332U (en) Installation structure of prop pulling hoist in tunnel
CN102305025A (en) Anchor cable rig bracket
CN209081290U (en) Bailey truss pylon and distributing earth anchor CABLEWAY ERECTION SYSTEM that can be traversing
CN203891905U (en) Leg-free shed support
CN203308109U (en) External carrying net device
CN202690098U (en) Hexastyle supporting type split combination ended hydraulic support
CN203531931U (en) Underground coal mine excavation working face temporary supporting device
CN202731945U (en) Cable for underground coal mine tunnel U-shaped steel shed locking leg support
CN203846494U (en) Breast beam soil anchor rod segmented connection structure
CN204283460U (en) Portion of side, convenient stable type adjustable height tunnel anchor cable construction platform
CN204225491U (en) The support chock of formwork keel
CN207920616U (en) A kind of suspension device for taking out tunnel speedy drivage the bottom of for
CN204344144U (en) The anti-wall caving temporary support device of hacking shed tunnel
CN204355996U (en) Colliery Stage winch New Supporting Equipment of Primary
CN202509912U (en) Position limiting device for pneumatic door stop
CN205154219U (en) Scalable temporary support device of face end is tunneled in pit in colliery
CN211370451U (en) Novel front canopy lifting ring for mine
CN202483605U (en) Multi-adaptability spile type end head bracket
CN203463122U (en) Temporary support equipment for tunneling face in underground coal mine
CN205370623U (en) Goaf filling hydraulic support
CN202148057U (en) Novel arm support for blending material stacking machine
CN204492861U (en) A kind of detachable hydraulic support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20150122

EXPY Termination of patent right or utility model