CN203097407U CN 201320109659 CN201320109659U CN203097407U CN 203097407 U CN203097407 U CN 203097407U CN 201320109659 CN201320109659 CN 201320109659 CN 201320109659 U CN201320109659 U CN 201320109659U CN 203097407 U CN203097407 U CN 203097407U
Authority
CN
China
Prior art keywords
iron tower
guide rail
moving track
vertical test
test assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320109659
Other languages
Chinese (zh)
Inventor
陈传金
刘桂祥
纪旭
樊志勇
赵雪建
徐文敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hong Yuan Steel Tower Co Ltd
Original Assignee
Anhui Hong Yuan Steel Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hong Yuan Steel Tower Co Ltd filed Critical Anhui Hong Yuan Steel Tower Co Ltd
Priority to CN 201320109659 priority Critical patent/CN203097407U/en
Application granted granted Critical
Publication of CN203097407U publication Critical patent/CN203097407U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a guide rail tool for iron tower vertical test assembly. The guide rail tool for iron tower vertical test assembly comprises a moving rail. A moving base is fixed on the moving rail through rail clamping plates, fake legs are connected on the moving base, and the moving rail is fixed on ground anchors through foundation bolts. The guide rail tool for iron tower vertical test assembly is reasonable in design and convenient to use, four tower legs of an iron tower can be on the same plane through adjustment of adjusting lead screws on the moving rail, and due to the facts that the foundation bolts are fixed on the ground anchors of different distances, and the moving base is adjusted on the moving rail, the guide rail tool for iron tower vertical test assembly can be applicable to iron tower vertical test assemblies of different foot distances.

Description

A kind of guide rail frock that is used for the vertical examination assembling of iron tower
Technical field
The utility model relates to a kind of track-type facilities, is specifically related to a kind of guide rail frock that is used for the vertical examination assembling of iron tower.
Background technology
The facility of the bracing frame ceases to be busy that electric power tower uses when being the high-tension overhead line transmission of electricity, it can be divided into angle steel tower, steel pipe pole and steel pipe narrow base tower on structure, and wherein the angle steel tower generally uses in the open air, and steel pipe pole and steel pipe narrow base tower mainly use in the city.Electric power towers such as angle steel tower are bulky, load-carrying is big, and for ease of carrying, electric power tower needs a kind of track-type facilities when vertical examination is assembled.
The utility model content
Technical problem to be solved in the utility model provides a kind of guide rail frock that is used for the vertical examination assembling of iron tower easy to use, applied widely.
For solving the problems of the technologies described above, a kind of guide rail frock that is used for the vertical examination assembling of iron tower of the utility model comprises moving track, moves seat and is fixed on the described moving track by folder rail plate, be connected with artificial leg on the described mobile seat, described moving track is fixed on the earth anchor by stone bolt.
For four tower legs that make electric power tower are on the same plane, the adjusting screw mandrel of regulating the integral planar degree is housed on the above-mentioned moving track.
Further, above-mentioned adjusting screw mandrel is six, lays respectively at the two ends and the centre position of described moving track both sides.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is reasonable in design, easy to use, the adjusting screw mandrel of regulating on the moving track can make four tower legs of iron tower be on the same plane, and stone bolt is fixed on the earth anchor of different distance and moves seat and goes for the vertical examination assembling of iron tower that different roots are opened in the moving track adjusted.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is used for the structural representation of the guide rail frock of the vertical examination assembling of iron tower for the utility model is a kind of.
The specific embodiment
As shown in Figure 1, a kind of guide rail frock that is used for the vertical examination assembling of iron tower comprises moving track 1, moves seat 4 and is fixed on the described moving track 1 by folder rail plate 5, be connected with artificial leg 3 on the described mobile seat 4, described moving track 1 is fixed on the earth anchor 7 by stone bolt 6.The adjusting screw mandrel 2 of regulating the integral planar degree is housed on the described moving track 1.Described adjusting screw mandrel 2 is six, lays respectively at the two ends and the centre position of described moving track 1 both sides.
During use, earlier moving track 1 usefulness stone bolt 6 is fixed on the earth anchor 7; To move seat 4 again is fixed on the moving track 1 by folder rail plate 5; Make four tower legs in the same plane by regulating screw mandrel 2, for the vertical examination assembling of iron tower facilitates; Stone bolt 6 is fixed on the earth anchor 7 of different distance and moves seat 4 and goes for the vertical examination assembling of iron tower that different roots are opened in moving track 1 adjusted.

Claims (3)

1. one kind is used for the guide rail frock that the vertical examination of iron tower is assembled, comprise moving track (1), it is characterized in that: move seat (4) and be fixed on the described moving track (1) by folder rail plate (5), be connected with artificial leg (3) on the described mobile seat (4), described moving track (1) is fixed on the earth anchor (7) by stone bolt (6).
2. a kind of guide rail frock that is used for the vertical examination assembling of iron tower according to claim 1 is characterized in that: the adjusting screw mandrel (2) of regulating the integral planar degree is housed on the described moving track (1).
3. a kind of guide rail frock that is used for the vertical examination assembling of iron tower according to claim 1, it is characterized in that: described adjusting screw mandrel (2) is six, lays respectively at the two ends and the centre position of described moving track (1) both sides.
CN 201320109659 2013-03-11 2013-03-11 Guide rail tool for iron tower vertical test assembly Expired - Fee Related CN203097407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320109659 CN203097407U (en) 2013-03-11 2013-03-11 Guide rail tool for iron tower vertical test assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320109659 CN203097407U (en) 2013-03-11 2013-03-11 Guide rail tool for iron tower vertical test assembly

Publications (1)

Publication Number Publication Date
CN203097407U true CN203097407U (en) 2013-07-31

Family

ID=48848819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320109659 Expired - Fee Related CN203097407U (en) 2013-03-11 2013-03-11 Guide rail tool for iron tower vertical test assembly

Country Status (1)

Country Link
CN (1) CN203097407U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763512A (en) * 2019-01-23 2019-05-17 浙江省送变电工程有限公司 A kind of adjustable basic platform of angle steel tower vertical assembled

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763512A (en) * 2019-01-23 2019-05-17 浙江省送变电工程有限公司 A kind of adjustable basic platform of angle steel tower vertical assembled
CN109763512B (en) * 2019-01-23 2024-04-19 浙江省送变电工程有限公司 Vertical equipment adjustable foundation platform of angle steel tower

Similar Documents

Publication Publication Date Title
CN204884841U (en) Undercurrent route selection is high accuracy opening CT for device
CN201769024U (en) Welding and clamping device for accelerator pedal
CN202633786U (en) Inlet wire bridge stand mounting platform for mid-set switch cabinet
CN203097407U (en) Guide rail tool for iron tower vertical test assembly
CN102996585B (en) Embracing hoop applied transformer rack assembling method
CN201812843U (en) Framework installing machine
CN204068039U (en) A kind of take-up for low-voltage circuit transformation, actinobacillus device
CN203310337U (en) Quick range finder for electric pole root spacing
CN201990391U (en) Rail steering device
CN203617128U (en) Adjustable permanent connection structure for transformer core clamping piece
CN204167712U (en) A kind of regulator cubicle installs height-regulating device
CN203791344U (en) Connection structure for connecting shaft bracket and rolling mill base in short stress path rolling mill
CN203487548U (en) Connecting structure of transformer substation steel bracket and concrete foundation joint
CN205393902U (en) Hubbed flange dish interfacing apparatus of special high -tension transmission steel pipe tower
CN206873482U (en) A kind of tune stake device of offshore wind farm multi-column pier foundation
CN203701282U (en) Pre-buried channel and support structure matched with same
CN201579722U (en) Pole piece laminating fixture
CN204481426U (en) Novel rail support
CN202126876U (en) Cable-threading tensioning wheel
CN203324315U (en) Electric meter box fixation rack
CN203866660U (en) Assembly and disassembly tool for fasteners
CN204111227U (en) A kind of electric block steel cable locking structure
CN202674539U (en) Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames
CN207920345U (en) A kind of bidirectionally anchoring device for fixing door machine
CN204782193U (en) High -strength concrete door type pole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130731

Termination date: 20190311

CF01 Termination of patent right due to non-payment of annual fee