CN203080935U - Device for preventing tube wall of steel tube concrete structure steel tube and concrete from generating stripping damage of preheating steel tube - Google Patents

Device for preventing tube wall of steel tube concrete structure steel tube and concrete from generating stripping damage of preheating steel tube Download PDF

Info

Publication number
CN203080935U
CN203080935U CN 201320024283 CN201320024283U CN203080935U CN 203080935 U CN203080935 U CN 203080935U CN 201320024283 CN201320024283 CN 201320024283 CN 201320024283 U CN201320024283 U CN 201320024283U CN 203080935 U CN203080935 U CN 203080935U
Authority
CN
China
Prior art keywords
steel pipe
concrete
steel tube
tube wall
heating part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320024283
Other languages
Chinese (zh)
Inventor
张琨
黄刚
吴延宏
孙克平
刘志茂
周杰刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN 201320024283 priority Critical patent/CN203080935U/en
Application granted granted Critical
Publication of CN203080935U publication Critical patent/CN203080935U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Disclosed is a device for preventing the tube wall of a steel tube concrete structure steel tube and concrete from generating stripping damage of a preheating steel tube. The device is composed of a heating part, a thermal insulation part and a temperature measurement part, wherein the heating part is evenly laid on the tube wall of the steel tube concrete structure steel tube, the thermal insulation part covers the outer side of the heating part, and the temperature measurement part is arranged on the tube wall of the steel tube concrete structure steel tube. According to the device for preventing the tube wall of the steel tube concrete structure steel tube and the concrete from generating the stripping damage of the preheating steel tube, the temperature of the steel tube in a steel tube concrete structure is controlled, pre-expansion is generated, so that the stripping damage due to inconformity of deformation of the steel tube and the concrete is effectively avoided, and namely the problem that the stripping damage can occur to a junction surface of the steel tube and the concrete due to concrete contraction is solved.

Description

Preheated steel pipe prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage
Technical field
The utility model relates to construction technology of concrete filled steel tubular.
Background technology
At present, in the architectural engineering construction technique field, especially in the superelevation layer project construction, encased structures is widely used.Encased structures can be with steel pipe and concrete advantages together, make concrete be in the side loaded state, its compressive strength can significantly improve, simultaneously because concrete existence, improved the rigidity of steel pipe, both play a role jointly, thereby have improved structural-load-carrying capacity widely, have improved structural seismic performance and fireproof performance etc.
But, that the encased structures system is often followed is high-strength, self-compacting concrete uses simultaneously, because the concrete self-constriction is bigger, in the process of hardening of concrete and self-constriction, steel pipe and concrete deformation are inconsistent, very easily produce between steel pipe in the encased structures and concrete and peel off damage, closely influence the stress of structural system.This technical problem does not still have solution at present.
The utility model content
The purpose of this utility model provides a kind of preheated steel pipe and prevents that steel pipe concrete structural iron tube wall and concrete from producing and peel off the device of damage, solve easily to produce between steel pipe in the encased structures and concrete to peel off the technical problem of damage.
For achieving the above object, the utility model adopts following technical scheme: a kind of preheated steel pipe prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage, it is characterized in that: form by heating part, insulating sections and temperature measurement fraction, described heating part evenly is laid on the tube wall of steel pipe concrete structured steel pipe, described insulating sections covers the outside of heating part, and described temperature measurement fraction is arranged on the tube wall of described steel pipe concrete structured steel pipe.
Described heating part can be heating wire, ribbon heater, electric blanket, electric heating bar, heat conduction coil pipe, ceramic heater, crawler belt heater or electromagnetic heater.
Described heating part can by paste, on the tube wall of strong magnets absorption, bolt connects or welding manner evenly is laid in steel pipe concrete structured steel pipe.
Described insulating sections can be insulation quilt or the cotton felt of accumulation of heat.
Described temperature measurement fraction can be the surface-mount type temperature transducer.
Compared with prior art the utlity model has following characteristics and beneficial effect: the utility model has been expanded structure and has been peeled off the means of damage control, by means such as in the past Passive Control concrete mix, concrete casting building technologies, become ACTIVE CONTROL steel pipe temperature, adjusted the means of steel pipe temperature synchronously in conjunction with concrete self-constriction rule simultaneously.
The utility model is by the temperature of steel pipe in the control encased structures, make it produce pre-the expansion, thereby effectively controlled the damage of peeling off that produces owing to steel pipe and concrete deformation are inconsistent, steel pipe and the concrete joint surface promptly having avoided causing because of concrete shrinkage produce the problem of damage of peeling off.
The utility model makes steel pipe produce certain precompressed effect to concrete when preventing that damage is peeled off in generation between steel pipe and concrete, and the bearing capacity that improves structural entity is had very great help.
The utility model utilizes heat energy, electric energy that steel pipe is preheated and temperature control, and equipment is simple, be convenient to operation.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is a structural representation of the present utility model.
Reference numeral: 1-steel pipe, 2-concrete, 3-heating part, 4-insulating sections, 5-temperature measurement fraction.
The specific embodiment
Embodiment is referring to shown in Figure 1, and this preheated steel pipe prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage, is made up of heating part 3, insulating sections 4 and temperature measurement fraction 5.
Described heating part 3 evenly is laid on the tube wall of steel pipe concrete structured steel pipe 1, and described insulating sections 4 covers the outside of heating part 3, and described temperature measurement fraction 5 is arranged on the tube wall of described steel pipe concrete structured steel pipe 1.
Described heating part 3 can be heating wire, ribbon heater, electric blanket, electric heating bar, heat conduction coil pipe, ceramic heater, crawler belt heater or electromagnetic heater etc.
Described heating part 3 can be by paste, on the tube wall of strong magnets absorption, bolt connects or mode such as welding evenly is laid in steel pipe concrete structured steel pipe 1.
Described insulating sections 4 can be insulation quilt, the cotton felt of accumulation of heat etc., and the outside of the heating part that is laid in can consider whether add according to actual conditions, and can carry out as required freely adding and removing.
As most preferred embodiment, described temperature measurement fraction 5 is the surface-mount type temperature transducer, and it closely contacts with the steel pipe concrete structured steel pipe, and the collecting temperature data also can read in real time automatically.
Use said system and prevent that steel pipe concrete structured steel pipe and concrete generation from peeling off the method for damage, its step is as follows.
Step 1, according to the wall thickness of environment temperature, steel pipe concrete structured steel pipe, diameter, concrete strength, concrete temperature rise rate and the thermal insulation warming of steel pipe concrete structured steel pipe, determine the efficiency of heating surface and the corresponding insulation measure of heating part 3.
After steel pipe concrete structured steel pipe 1 installation in step 2, the steel pipe concrete structure (promptly lift, weld finish after), heating part 3 is applied on the tube wall of steel pipe concrete structured steel pipe 1, heating part 3 is closely contacted with steel pipe concrete structured steel pipe 1, on the tube wall of steel pipe concrete structured steel pipe 1, arrange temperature measurement fraction 5, according to the outer side covers insulating sections 4 of heat demand at heating part 3.
Step 3, the steel pipe concrete structured steel pipe is preheated processing, promptly heat with 3 pairs of steel pipe concrete structured steel pipes 1 of heating part, the variations in temperature of observing the steel pipe concrete structured steel pipe by temperature measurement fraction 5 makes steel pipe concrete structured steel pipe 1 reach design temperature and produce in advance and expands simultaneously.
Step 4, concreting 2 by the effect of heating part 3, insulating sections 4 and temperature measurement fraction 5, make steel pipe concrete structured steel pipe 1 be in design temperature simultaneously always.
Step 5, in the process of concrete 2 setting and hardens, rate of self-contraction according to concrete 2, regulate the temperature of control steel pipe concrete structured steel pipe 1 in real time by heating part 3, insulating sections 4 and temperature measurement fraction 5, up to concrete 2 final set, stop steel pipe concrete structured steel pipe 1 is heated, make steel pipe concrete structured steel pipe 1 produce default shrinkage value, and concrete 2 is produced the precompressed effect.The situation of damage is peeled off in steel pipe concrete structured steel pipe and concrete joint surface generation that this process can be avoided causing because of concrete shrinkage, promptly can avoid the unfavorable variation of the stressed generation of steel pipe concrete structural system.
Above disclose only for preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this.Therefore, the equivalent variations according to the utility model claim is done still belongs to the scope that the utility model is contained.

Claims (5)

1. a preheated steel pipe prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage, it is characterized in that: form by heating part (3), insulating sections (4) and temperature measurement fraction (5), described heating part (3) evenly is laid on the tube wall of steel pipe concrete structured steel pipe (1), described insulating sections (4) covers the outside of heating part (3), and described temperature measurement fraction (5) is arranged on the tube wall of described steel pipe concrete structured steel pipe (1).
2. preheated steel pipe according to claim 1 prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage that it is characterized in that: described heating part (3) is heating wire, ribbon heater, electric blanket, electric heating bar, heat conduction coil pipe, ceramic heater, crawler belt heater or electromagnetic heater.
3. preheated steel pipe according to claim 1 prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage, it is characterized in that: described heating part (3) by paste, on the tube wall of strong magnets absorption, bolt connects or welding manner evenly is laid in steel pipe concrete structured steel pipe (1).
4. preheated steel pipe according to claim 1 prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage that it is characterized in that: described insulating sections (4) is insulation quilt or the cotton felt of accumulation of heat.
5. preheated steel pipe according to claim 1 prevents that steel pipe concrete structural iron tube wall and concrete from producing and peels off the device of damage that it is characterized in that: described temperature measurement fraction (5) is the surface-mount type temperature transducer.
CN 201320024283 2013-01-17 2013-01-17 Device for preventing tube wall of steel tube concrete structure steel tube and concrete from generating stripping damage of preheating steel tube Expired - Lifetime CN203080935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320024283 CN203080935U (en) 2013-01-17 2013-01-17 Device for preventing tube wall of steel tube concrete structure steel tube and concrete from generating stripping damage of preheating steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320024283 CN203080935U (en) 2013-01-17 2013-01-17 Device for preventing tube wall of steel tube concrete structure steel tube and concrete from generating stripping damage of preheating steel tube

Publications (1)

Publication Number Publication Date
CN203080935U true CN203080935U (en) 2013-07-24

Family

ID=48826786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320024283 Expired - Lifetime CN203080935U (en) 2013-01-17 2013-01-17 Device for preventing tube wall of steel tube concrete structure steel tube and concrete from generating stripping damage of preheating steel tube

Country Status (1)

Country Link
CN (1) CN203080935U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653437A (en) * 2019-01-14 2019-04-19 沈阳建筑大学 A kind of preparation method of the strength round steel pipe concrete column using steel pipe active constraint
CN111501520A (en) * 2020-05-08 2020-08-07 重庆交通大学 Pouring process for preventing concrete filled steel tube from being emptied
CN116657573A (en) * 2021-02-05 2023-08-29 成都蜂装钢构集团有限公司 Offshore platform structure
CN116732859A (en) * 2021-02-05 2023-09-12 成都蜂装钢构集团有限公司 Assembled elevated road and bridge mounting structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653437A (en) * 2019-01-14 2019-04-19 沈阳建筑大学 A kind of preparation method of the strength round steel pipe concrete column using steel pipe active constraint
CN111501520A (en) * 2020-05-08 2020-08-07 重庆交通大学 Pouring process for preventing concrete filled steel tube from being emptied
CN116657573A (en) * 2021-02-05 2023-08-29 成都蜂装钢构集团有限公司 Offshore platform structure
CN116732859A (en) * 2021-02-05 2023-09-12 成都蜂装钢构集团有限公司 Assembled elevated road and bridge mounting structure

Similar Documents

Publication Publication Date Title
CN203080935U (en) Device for preventing tube wall of steel tube concrete structure steel tube and concrete from generating stripping damage of preheating steel tube
CN103437439B (en) A kind of prefabricated steel wire net rack thermal-insulating board and preparation method thereof and construction method
CN203097276U (en) Electric-heating heat preservation formwork
CN204152000U (en) A kind of inorganic compounding insulation construction for in-situ concrete wall
CN111851310A (en) Heating and heat-insulating system, heat-insulating method and construction method for winter construction pouring template
CN206703268U (en) A kind of pre-cast concrete walling with heat-insulation layer
CN102650165B (en) Construction method for eliminating concrete shrinkage cracks of steel plate and concrete combined shear wall by preheating steel plate
CN203435172U (en) Wet heating cable installation structure
RU2487981C1 (en) Method to erect monolithic reinforced concrete structures in winter conditions
CN107218478A (en) A kind of prefabricated composite thermal-insulating pipe of steam direct-buried and its construction method
CN204612484U (en) A kind of high temperature industrial furnace novel lining structure
CN207420017U (en) A kind of building template of pouring water and heat preservation
CN206941962U (en) A kind of heat-insulated beam column in light steel house
CN212452319U (en) Heating and heat-insulating system for winter construction pouring template
CN106003398B (en) A kind of PC components High Efficiency Thermal die station
CN202164816U (en) Cast-in-place concrete structure and general prefabricated component energy-saving heat-insulating template
CN105297734A (en) Construction method for controlling mass concrete crack formation
CN209787499U (en) Electromagnetic heating induction coil made of high-temperature-resistant alloy steel material
CN207110093U (en) A kind of built-in steel wire net rack fireproof heated board
CN202755449U (en) Air-spaced building construction
CN202157458U (en) Thermal insulation building energy conservation wallboard
CN201665930U (en) Heat insulation structure external wall of high-rise buildings
CN204646913U (en) In a kind of petroleum chemical industry catalysis device hexsteel heat insulation and wear resistance dual-layer lining structure, thermal-protective coating can realize the anchor nails of formwork cast
CN204126162U (en) For installing the composite module of radiation heat transfer thermal source pipeline
CN203726705U (en) Foaming drying room for phenolic foam production