CN202755449U - Air-spaced building construction - Google Patents
Air-spaced building construction Download PDFInfo
- Publication number
- CN202755449U CN202755449U CN 201220369229 CN201220369229U CN202755449U CN 202755449 U CN202755449 U CN 202755449U CN 201220369229 CN201220369229 CN 201220369229 CN 201220369229 U CN201220369229 U CN 201220369229U CN 202755449 U CN202755449 U CN 202755449U
- Authority
- CN
- China
- Prior art keywords
- brickwork
- anchor pole
- reinforcing rib
- heat insulation
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to an air-spaced building construction. The air-spaced building construction comprises a brick masonry body, reinforcing ribs, longitudinal ribs, anchor bolts, waterproof mortar, a polystyrene insulation board and a concrete structure. The polystyrene insulation board is disposed on the right of the masonry body, the concrete structure is disposed on the right of the polystyrene insulation board, air space between the masonry body and the polystyrene insulation board is 30mm-40mm in depth, the masonry body is connected with the concrete structure through the anchor bolts which are made of reinforcing steel bars 18-20mm in diameter, space of the reinforcing steel bars is 300-500mm, a hook is arranged at an end of each anchor bolt, the reinforcing ribs 14-16mm in diameter are disposed at the connections of the masonry body and the anchor bolts, the end of each anchor rod is welded to the corresponding reinforcing rib, the longitudinal ribs are disposed at the connections of the masonry body and the anchor bolts, and the reinforcing ribs, the longitudinal ribs and the anchor bolts are welded. The airs-spaced building construction is simple and practical.
Description
Technical field
The utility model relates to a kind of architectural construction that air layer is arranged, and is applicable to construction field.
Background technology
The concrete structure outside arranges brickwork, and the air layer that brickwork and concrete structure form makes agent structure become a huge heat storage, and indoor temperature change generated in case is reduced.In addition, air layer can make the acoustical vibration ripple be in attenuation state, has played the effect of sound insulation.
The utility model content
The technical problem that the utility model solves provides a kind of architectural construction that air layer is arranged, and solves the acoustical and thermal problem of traditional architecture.
The utility model comprises brickwork, reinforcing rib, longitudinal rib, anchor pole, waterproofing mortar, polyphenylene heat insulation slab, concrete body, the brickwork right side is polyphenylene heat insulation slab, the polyphenylene heat insulation slab right side is concrete body, air layer between brickwork and the polyphenylene heat insulation slab is 30~40mm, brickwork connects by anchor pole and concrete body, it is the reinforcing bar of 18~20mm that anchor pole adopts diameter, rebar spacing is 300~500mm, termination point of anchor rod arranges crotch, brickwork and anchor pole junction arrange reinforcing rib, the reinforcing rib diameter is 14~16mm, termination point of anchor rod and reinforcing rib are taked to be welded to connect, brickwork and anchor pole junction arrange longitudinal rib, reinforcing rib, longitudinal rib is connected the employing welding with anchor pole.
The utility model is simple and practical.
Description of drawings
Fig. 1 has the architectural construction schematic diagram of air layer.
Reference numeral: 1, brickwork, 2, reinforcing rib, 3, longitudinal rib, 4, anchor pole, 5, waterproofing mortar, 6, polyphenylene heat insulation slab, 7, concrete body.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 is the architectural construction schematic diagram that air layer is arranged.Present embodiment comprises brickwork 1, reinforcing rib 2, longitudinal rib 3, anchor pole 4, waterproofing mortar 5, polyphenylene heat insulation slab 6, concrete body 7, brickwork 1 right side is polyphenylene heat insulation slab 6, polyphenylene heat insulation slab 6 right sides are concrete body 7, air layer between brickwork 1 and the polyphenylene heat insulation slab 6 is 35mm, brickwork 1 connects by anchor pole 4 and concrete body 7, it is the reinforcing bar of 20mm that anchor pole 4 adopts diameter, rebar spacing is 400mm, anchor pole 4 terminations arrange crotch, brickwork 1 arranges reinforcing rib 2 with anchor pole 4 junctions, reinforcing rib 2 diameters are 16mm, anchor pole 4 terminations and reinforcing rib 2 are taked to be welded to connect, brickwork 1 arranges longitudinal rib 3, reinforcing rib 2 with anchor pole 4 junctions, longitudinal rib 3 is connected the employing welding with anchor pole 4.
Claims (1)
1. architectural construction that air layer is arranged, comprise brickwork, reinforcing rib, longitudinal rib, anchor pole, waterproofing mortar, polyphenylene heat insulation slab, concrete body, the brickwork right side is polyphenylene heat insulation slab, the polyphenylene heat insulation slab right side is concrete body, air layer between brickwork and the polyphenylene heat insulation slab is 30~40mm, brickwork connects by anchor pole and concrete body, it is the reinforcing bar of 18~20mm that anchor pole adopts diameter, rebar spacing is 300~500mm, termination point of anchor rod arranges crotch, brickwork and anchor pole junction arrange reinforcing rib, the reinforcing rib diameter is 14~16mm, termination point of anchor rod and reinforcing rib are taked to be welded to connect, and brickwork and anchor pole junction arrange longitudinal rib, reinforcing rib, longitudinal rib is connected the employing welding with anchor pole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220369229 CN202755449U (en) | 2012-07-17 | 2012-07-17 | Air-spaced building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220369229 CN202755449U (en) | 2012-07-17 | 2012-07-17 | Air-spaced building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202755449U true CN202755449U (en) | 2013-02-27 |
Family
ID=47734638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220369229 Expired - Fee Related CN202755449U (en) | 2012-07-17 | 2012-07-17 | Air-spaced building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202755449U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915290A (en) * | 2018-07-25 | 2018-11-30 | 悉地国际设计顾问(深圳)有限公司 | A kind of fixed device of wall brick, wall brick installation method and wall |
CN110185158A (en) * | 2019-04-29 | 2019-08-30 | 江苏硕尔邦新材料科技有限公司 | A kind of assembled architecture Special-Shaped Column node connecting structure |
-
2012
- 2012-07-17 CN CN 201220369229 patent/CN202755449U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915290A (en) * | 2018-07-25 | 2018-11-30 | 悉地国际设计顾问(深圳)有限公司 | A kind of fixed device of wall brick, wall brick installation method and wall |
CN110185158A (en) * | 2019-04-29 | 2019-08-30 | 江苏硕尔邦新材料科技有限公司 | A kind of assembled architecture Special-Shaped Column node connecting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203097032U (en) | Cast-in-place wall body | |
CN102877559A (en) | Cast-in-situ heat preservation and heat isolation beam, column or shear wall and construction method thereof | |
CN202755449U (en) | Air-spaced building construction | |
CN105155763A (en) | Prefabricated core pulling hole-forming slab | |
CN102787683A (en) | Novel reinforced composite wall body of detachable template | |
CN205242658U (en) | External wall insulation adds muscle composite sheet, Thermal insulation wall integral structure | |
CN203096973U (en) | Long-plate-shaped thermal insulation plate support | |
CN202767228U (en) | Hollow building structure | |
CN207003736U (en) | Embedding even composite wallboard | |
CN203701328U (en) | Townhouse building midfeather civil engineering structure | |
CN202755448U (en) | Hollow building | |
CN203716389U (en) | Multi-pore brick | |
CN203160463U (en) | Insertion connection type large-mold built-in cast-in-situ external heat insulation structure | |
CN202787487U (en) | Hollow building wall foot structure | |
CN203066303U (en) | Fireproof heat-insulation heat-preservation building external wall board | |
CN203394091U (en) | Casing type reinforced structure | |
CN203200938U (en) | Reinforcing type rock wool board warm-keeping structure | |
CN202755466U (en) | Expansion gap structure for hollow building | |
CN202559544U (en) | Outer wall insulation structure | |
CN202299100U (en) | Stepped concrete heat-insulating building block | |
CN205153298U (en) | Prefabricated orifice plate of loosing core into | |
CN201614676U (en) | Energy-saving heat preservation double-lattice exterior wall without cold bridge | |
CN203640083U (en) | Integral combination wall | |
CN202755447U (en) | Hollow building foundation structure | |
CN215406930U (en) | Concrete form constructional column and thermal insulation wall connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: Ouhai District of Zhejiang city in Wenzhou province 325000 Rong Road No. 39 Patentee after: Zhu Kui Address before: 325000 snow mountain apartment No. 12, Lucheng District, Zhejiang, Wenzhou Patentee before: Zhu Kui |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130227 Termination date: 20130717 |