CN203071653U - Power distribution equipment energy consumption monitoring device - Google Patents
Power distribution equipment energy consumption monitoring device Download PDFInfo
- Publication number
- CN203071653U CN203071653U CN 201220730479 CN201220730479U CN203071653U CN 203071653 U CN203071653 U CN 203071653U CN 201220730479 CN201220730479 CN 201220730479 CN 201220730479 U CN201220730479 U CN 201220730479U CN 203071653 U CN203071653 U CN 203071653U
- Authority
- CN
- China
- Prior art keywords
- equipment
- monitoring device
- consumption monitoring
- controller switching
- shunt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Abstract
The utility model relates to a power distribution equipment energy consumption monitoring device. The power distribution equipment energy consumption monitoring device comprises a host computer, a communication and equipment management server, an intelligent instrument, a piece of shunt metering equipment, a piece of state monitoring equipment and sensors connected on the output end of power distribution equipment. The host computer is connected with the communication and equipment management server. The communication and equipment management server is respectively connected with the intelligent instrument, the shunt metering equipment and the state monitoring equipment. The intelligent instrument and the shunt metering equipment are respectively connected with the sensors. The state monitoring equipment is connected with fault alarm nodes inside the power distribution equipment. Compared with the prior art, the power distribution equipment energy consumption monitoring device acquires signals from sensors connected on each shunt output terminal through the intelligent instrument and the shunt metering equipment, etc. so as to achieve real-time monitoring on the energy consumption of each shunt output terminal. The real power consumption conditions of electric equipments connected with each shunt circuit are thus determined.
Description
Technical field
The utility model relates to a kind of energy-consumption monitoring device, especially relates to a kind of for the energy consumption of each shunt output of controller switching equipment is carried out real-time device for monitoring.
Background technology
The world today, energy problem become more and more outstanding focus, and especially in China, energy problem becomes one of bottleneck that restriction China further develops.Under these circumstances, nationwide promotion energy-saving and emission-reduction.In the managed operation of units such as industrial and commercial enterprises, equipment operation, energy-saving and emission-reduction have become the direction that can not avoid.
The node device that controller switching equipment (as switchboard) uses as power distribution should be able to be accomplished to manage the most intuitively and monitor to the power supply operating position of integral body.Controller switching equipment has one or two power inputs, and a plurality of branch supply outputs (each is connected respectively to each different power consumption equipments along separate routes) are arranged.At present the general energy consumption datas such as electric current to input, voltage that only adopt of controller switching equipment are monitored, can't realize to each along separate routes the energy consumption of output monitor, thereby can't determine actual electricity consumption situation of power consumption equipment that each connects along separate routes.
When along separate routes the energy consumption of output was monitored to each, controller switching equipment need be integrated controller switching equipment and the numerous control monitoring equipments of kind such as the circuit breaker, lightning arrester of various brands and type, and structure and electric property have nothing in common with each other.According to practice, controller switching equipment is difficult to accomplish uniformity, and the introducing of big quantity sensor has caused the degree of difficulty of equipment installation, debugging to promote greatly.
The utility model content
The purpose of this utility model is exactly to provide a kind of for the energy consumption of each shunt output of controller switching equipment is carried out real-time device for monitoring for the defective that overcomes above-mentioned prior art existence.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of controller switching equipment energy-consumption monitoring device, comprise host computer, communication and device management server, intelligence instrument, shunt measuring equipment, status monitor device and the transducer that is connected the controller switching equipment output, described host computer connects communication and device management server, described communication is connected intelligence instrument, shunt measuring equipment and status monitor device respectively with device management server, described intelligence instrument is connected with transducer respectively with the shunt measuring equipment, and described status monitor device connects the fault warning node in the controller switching equipment.
Described transducer comprises current sensor and voltage sensor.
Described energy-consumption monitoring device also is provided with the transducer groove that crosses, and this transducer groove that crosses is provided with a plurality of notches, and a transducer of encapsulation also is connected to intelligence instrument or measuring equipment along separate routes in each notch.
Described energy-consumption monitoring device also is provided with alarm wiring aggregation slot, and this alarm wiring aggregation slot is provided with a plurality of notches, and the connecting line between status monitor device and the fault warning node is arranged in the described notch.
Described host computer connects communication and device management server by wired ethernet, WLAN (wireless local area network) or mobile communications network.
Described communication is connected intelligence instrument, shunt measuring equipment and status monitor device with device management server respectively by RS485 interface or RS232 interface.
Compared with prior art, the utlity model has following advantage:
1, the utility model carries out signals collecting by intelligence instrument, shunt measuring equipment etc. to the transducer that is connected each shunt output, thereby realize the energy consumption of each shunt output is monitored in real time, to determine the actual electricity consumption situation of each power consumption equipment that connects along separate routes.
2, the transducer groove that crosses provides the unified mounting means of transducer, voltage, current sensor are installed in the groove that crosses, encapsulation in advance, and quantity is variable, because the transducer groove that crosses can provide good cabling guiding function, and provide convenience for later operation maintenance such as more emat sensor.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the cross schematic diagram of groove of the utility model transducer.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.
Embodiment
As shown in Figure 1, a kind of controller switching equipment energy-consumption monitoring device comprises host computer 1, communication and device management server 2, intelligence instrument 3, shunt measuring equipment 4, status monitor device 5 and the transducer that is connected the controller switching equipment output.Host computer 1 connects communication and device management server 2 by wired ethernet, in addition, according to different application scenarios, can also adopt modes such as WLAN (wireless local area network) or mobile communications network to carry out transfer of data.Communication generally is connected intelligence instrument 3, shunt measuring equipment 4 and status monitor device 5 respectively by the RS485 interface with device management server 2, communication protocol is standard MODBUS agreement, in addition also can be by RS232 interface etc. with intelligence instrument 3, checkout equipments such as measuring equipment 4 and status monitor device 5 carry out point-to-point the connection along separate routes.
Intelligence instrument 3 is connected with transducer respectively with shunt measuring equipment 4, is used for concentrating the information of pick-up transducers.Measuring equipment 4 can adopt these class intelligent shunt circuit measuring equipments such as the refined YMS-1M of reaching series, the electricity SMB350 of platform section or An Kerui AMC16 along separate routes, and multi parameter intallingent instrument such as intelligence instrument 3 can adopt the refined YD2000 of reaching series, the high beautiful A40 that traces back, Schneider PM800 series.According to practice, when carrying out the energy consumption monitoring of each shunt output, because the introducing of big quantity sensor has caused the degree of difficulty of equipment installation, debugging to promote greatly, therefore, native system adopts the transducer groove 6 that crosses, for transducer provides unified mounting means, as shown in Figure 2, the transducer groove that crosses is provided with a plurality of notches, voltage, current sensor are installed in the notch of the groove that crosses, encapsulation in advance, and quantity is variable, because the transducer groove that crosses can provide good cabling guiding function, and provide convenience for later operation maintenance such as more emat sensor.
The fault warning node that status monitor device 5 then connects in the controller switching equipment by alarm wiring aggregation slot 7, the fault alarm signal of gathering all kinds of circuit breakers in fault warning node place, lightning arrester etc.Alarm wiring aggregation slot 7 and the transducer groove 6 that crosses is similar, is provided with a plurality of notches, and the connecting line between status monitor device and the fault warning node is arranged in the described notch, plays the effect that cabling guides, gathers, and maintains easily.
Claims (6)
1. controller switching equipment energy-consumption monitoring device, it is characterized in that, comprise host computer, communication and device management server, intelligence instrument, shunt measuring equipment, status monitor device and the transducer that is connected the controller switching equipment output, described host computer connects communication and device management server, described communication is connected intelligence instrument, shunt measuring equipment and status monitor device respectively with device management server, described intelligence instrument is connected with transducer respectively with the shunt measuring equipment, and described status monitor device connects the fault warning node in the controller switching equipment.
2. a kind of controller switching equipment energy-consumption monitoring device according to claim 1 is characterized in that described transducer comprises current sensor and voltage sensor.
3. a kind of controller switching equipment energy-consumption monitoring device according to claim 1, it is characterized in that, described energy-consumption monitoring device also is provided with the transducer groove that crosses, and this transducer groove that crosses is provided with a plurality of notches, and a transducer of encapsulation also is connected to intelligence instrument or measuring equipment along separate routes in each notch.
4. a kind of controller switching equipment energy-consumption monitoring device according to claim 1, it is characterized in that, described energy-consumption monitoring device also is provided with alarm wiring aggregation slot, this alarm wiring aggregation slot is provided with a plurality of notches, and the connecting line between status monitor device and the fault warning node is arranged in the described notch.
5. a kind of controller switching equipment energy-consumption monitoring device according to claim 1 is characterized in that, described host computer connects communication and device management server by wired ethernet, WLAN (wireless local area network) or mobile communications network.
6. a kind of controller switching equipment energy-consumption monitoring device according to claim 1 is characterized in that, described communication is connected intelligence instrument, shunt measuring equipment and status monitor device with device management server respectively by RS485 interface or RS232 interface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220730479 CN203071653U (en) | 2012-12-26 | 2012-12-26 | Power distribution equipment energy consumption monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220730479 CN203071653U (en) | 2012-12-26 | 2012-12-26 | Power distribution equipment energy consumption monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203071653U true CN203071653U (en) | 2013-07-17 |
Family
ID=48770403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220730479 Expired - Lifetime CN203071653U (en) | 2012-12-26 | 2012-12-26 | Power distribution equipment energy consumption monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203071653U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103713226A (en) * | 2014-01-15 | 2014-04-09 | 赖东峰 | On-line fault pre-diagnosis device of low voltage distribution panel |
-
2012
- 2012-12-26 CN CN 201220730479 patent/CN203071653U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103713226A (en) * | 2014-01-15 | 2014-04-09 | 赖东峰 | On-line fault pre-diagnosis device of low voltage distribution panel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201541098U (en) | Intelligent energy consumption monitoring and measuring single-phase distribution box | |
CN203800700U (en) | Power distribution network monitoring system | |
CN201662884U (en) | Solar battery pack wireless monitoring system based on internet of things | |
CN205506953U (en) | Electric energy quality detection device based on radio communication | |
CN102956096A (en) | Ethernet passive optical network (EPON) and wireless ad hoc network technology-based electricity consumption information acquisition system | |
CN203071653U (en) | Power distribution equipment energy consumption monitoring device | |
CN205540716U (en) | System communication module | |
CN205104771U (en) | Outdoor basic station of fault self diagnosis formula intelligent power distribution case | |
CN204360158U (en) | A kind of intelligent PDU system | |
CN203775473U (en) | Power-saving control cabinet of intelligent street lamp | |
CN102694418A (en) | Alternating-current distribution intelligent monitoring system | |
CN208422100U (en) | A kind of electric energy meter collector with remote failure monitoring function | |
CN202077160U (en) | Intelligent switch cabinet display control device with remote wireless communication module | |
CN201910670U (en) | Intelligent parameter acquisition cabinet | |
CN108599372A (en) | A kind of novel distribution network automatic measure control terminal | |
CN205231540U (en) | Intelligence hot plug power is listed as cabinet | |
CN204241617U (en) | Energy-saving transmission line malfunction monitoring system | |
CN103840849A (en) | Electric power wireless data terminal | |
CN102681512A (en) | Laboratory power supply controlling and monitoring system based on ZigBee | |
CN202159398U (en) | Fire pre-alarming system of electric apparatus | |
CN202600458U (en) | Laboratory power supply management system | |
CN205920365U (en) | Power switch cabinet intelligent online monitoring controlling means | |
CN202815949U (en) | Cable information handheld polling device | |
CN207124455U (en) | One kind metering rack electric power system | |
CN206640395U (en) | The multi-functional data processor and remote monitoring system of a kind of industry spot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180104 Address after: 200072 New Road No. 2802, Jingan District Republic, Shanghai City, No. 5, 6, 7 and 8 Patentee after: Shanghai City letter and Communication Service Co.,Ltd. Jingan branch Address before: No. 2802, Zhabei District republic new road, Shanghai City, Shanghai Patentee before: SHANGHAI TELECOM COMMUNICATION EQUIPMENT Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130717 |