CN203066536U - Moving workshop for installation and maintenance of electric transmission and transformation equipment - Google Patents
Moving workshop for installation and maintenance of electric transmission and transformation equipment Download PDFInfo
- Publication number
- CN203066536U CN203066536U CN 201220681402 CN201220681402U CN203066536U CN 203066536 U CN203066536 U CN 203066536U CN 201220681402 CN201220681402 CN 201220681402 CN 201220681402 U CN201220681402 U CN 201220681402U CN 203066536 U CN203066536 U CN 203066536U
- Authority
- CN
- China
- Prior art keywords
- maintenance
- workshop
- moving
- box body
- house
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 17
- 230000005540 biological transmission Effects 0.000 title claims abstract description 14
- 238000009434 installation Methods 0.000 title abstract description 4
- 230000009466 transformation Effects 0.000 title abstract 3
- 238000004519 manufacturing process Methods 0.000 claims abstract description 3
- 230000001131 transforming effect Effects 0.000 claims description 11
- 238000007514 turning Methods 0.000 claims description 8
- 230000005611 electricity Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 10
- 238000003754 machining Methods 0.000 abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 2
- JRBRVDCKNXZZGH-UHFFFAOYSA-N alumane;copper Chemical compound [AlH3].[Cu] JRBRVDCKNXZZGH-UHFFFAOYSA-N 0.000 abstract 1
- 229910052742 iron Inorganic materials 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Abstract
A moving workshop for installation and maintenance of electric transmission and transformation equipment comprises a standard container box body. The front box wall, the rear box wall, the left box wall and the right box wall of the box body are door leaves capable of being opened. A multifunctional electric power device machining operation platform is arranged in the middle of an inner chamber of the box body. A distribution box is arranged on one side of the box body. The moving workshop is designed on the basis of an existing standard container aiming at installation and maintenance requirements of electric transmission and transformation equipment at present. At first, because the external form of the moving workshop is a standard container, hoisting transportation and placement are quite convenient. Secondly, box body walls in four faces are the door leaves capable of being opened, so machining problems that hardware fittings, iron pieces, cable cleats and copper aluminum bars of usually-met equipment are overlong in power grid construction and overhauling are solved. The moving workshop has the advantages of being high in standardized operation degree, standard in power grid construction and overhauling construction operation, low in project manufacturing cost and overhauling, and the like.
Description
[technical field]
The utility model relates to a kind of power transmission and transforming equipment that uses and installs and the mobile worker-house of maintenance in power system.
[background technology]
For adapting to the developing steps of power grid construction under the new situation, satisfy resource-conserving and environmentally friendly " amphitypy " maintenance requirement, realize the standardized target of power grid construction, develop a kind of power transmission and transforming equipment and install with maintenance extremely urgent with mobile worker-house.Before this practicality was newly made, electric power installation and maintenance worker-house was that simple on-site is built and can not be moved, and former worker-house not only influences construction environment, need take bigger construction plant, and each dismounting worker-house all can cause the waste of a large amount of artificial and materials.
[summary of the invention]
For solving the problems of the technologies described above, the utility model aims to provide a kind of power transmission and transforming equipment with new structure and installs and the mobile worker-house of maintenance, rely on this to move the worker-house, not only can satisfy the electric power personnel substantially and carry out the job requirements that power transmission and transforming equipment is installed and overhauled, and have conveniently moving, build simple advantage.
For achieving the above object, the utility model has adopted following technical scheme: this power transmission and transforming equipment is installed the container body that has a standard with mobile worker-house with maintenance, and its structural feature is: this casing tank wall all around is openable door leaf; Inner room middle part at described casing is provided with a multifunction power device fabrication operating platform; Side at described casing is provided with switchbox.
During as preferred concrete enforcement, pre-buried water, electricity and tracheae in the base wall of described casing.
During as preferred concrete enforcement, two length of described casing to the side constituted by upper-turn-type door leaf and lower turning type gangboard respectively.
During as preferred concrete enforcement, described upper-turn-type door leaf is that hydraulic pressure supports door leaf; The lower turning type gangboard is hinged on the diapire of casing by hinge.
Beneficial effect: compared with prior art, the utility model is installed and the maintenance demand at present power transmission and transforming equipment, designs on existing standard container basis.At first, this moves the profile in worker-house owing to be the container of standard, therefore, lifts, transports, settles all very convenient.Secondly, the box body wall of four faces is openable door leaf, thereby solved the equipment gold utensil, ironware, wire clamp and the copper aluminium that in power grid construction and maintenance, often run into and arranged processing problems such as long, had advantages such as standardized work degree height, power grid construction and maintenance constructing operation standard, good work environment and the construction costs cost of overhaul are low.
[description of drawings]
Fig. 1 is the perspective view of an embodiment of the utility model.
Among the figure: top 1, side door 2, switchbox 3, hydraulic pressure support bar 4, operating platform 5, upper-turn-type door leaf 6, lower turning type gangboard 7, side door 8.
[specific embodiment]
Referring to Fig. 1.The profile in this mobile worker-house is consistent with the container of standard.Four sides are openable door leaf, and wherein, the box body wall of two shorts is side door 2 and 8, and they are hinged on the casing edge by hinge; Two length to door leaf both can adopt the structure of side door 2 and 8, also can adopt the structure of upper-turn-type door leaf 6 and lower turning type gangboard 7, upper-turn-type door leaf 6 is that hydraulic pressure supports door leaf; Lower turning type gangboard 7 is hinged on the diapire of casing by hinge.Being provided with of lower turning type gangboard 7 is beneficial to operating personnel and passes in and out mobile worker-house.
At the inner room in mobile worker-house middle part one operating platform is set, can more integrated general electrical device machining tools on the operating platform, for example: the processing of efficient small-sized busbar (pipe is female), ironware processing, equipment such as conductor compression jointing and emergency power generation.For this reason, answer pre-buried water, electricity and tracheae in the mobile worker-house or on its wall, switchbox 3 etc. is set, for operation provides power and corresponding condition of work.
Above-described embodiment only is used for explanation the utility model mentality of designing, and should be as limiting invention thinking of the present utility model, and the simple deformation structure that all have been done under the present utility model thinking inspires all should be considered as falling into protection domain of the present utility model.
Claims (4)
1. a power transmission and transforming equipment is installed with maintenance and is used mobile worker-house, comprises the container body of a standard, and it is characterized in that: this casing tank wall all around is openable door leaf; Inner room middle part at described casing is provided with a multifunction power device fabrication operating platform (4); Side at described casing is provided with switchbox (3).
2. power transmission and transforming equipment as claimed in claim 1 is installed with maintenance and use mobile worker-house, it is characterized in that: the wall of described casing interior pre-buried water, electricity and tracheae.
3. power transmission and transforming equipment as claimed in claim 1 is installed with maintenance and use mobile worker-house, it is characterized in that: two length of described casing to the side respectively by upper-turn-type door leaf (6) and lower turning type gangboard (7) formation.
4. power transmission and transforming equipment as claimed in claim 1 is installed with maintenance and used mobile worker-house, it is characterized in that: described upper-turn-type door leaf (6) supports door leaf for hydraulic pressure; Lower turning type gangboard (7) is hinged on the diapire of casing by hinge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220681402 CN203066536U (en) | 2012-12-12 | 2012-12-12 | Moving workshop for installation and maintenance of electric transmission and transformation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220681402 CN203066536U (en) | 2012-12-12 | 2012-12-12 | Moving workshop for installation and maintenance of electric transmission and transformation equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203066536U true CN203066536U (en) | 2013-07-17 |
Family
ID=48765346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220681402 Expired - Lifetime CN203066536U (en) | 2012-12-12 | 2012-12-12 | Moving workshop for installation and maintenance of electric transmission and transformation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203066536U (en) |
-
2012
- 2012-12-12 CN CN 201220681402 patent/CN203066536U/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204424739U (en) | A kind of multi-section combined box-type substation | |
CN204481353U (en) | 10kV integral intelligent phased switch cabinet | |
CN203066536U (en) | Moving workshop for installation and maintenance of electric transmission and transformation equipment | |
CN201473253U (en) | Mobile light hydraulic crane | |
CN205231583U (en) | Integration box formula integration charging station | |
CN204905454U (en) | Dry -type transformer earthing device | |
CN203225466U (en) | An outdoor terminal box of a transformer substation | |
CN103015762A (en) | Special mobile workshop for electric power system | |
CN213125120U (en) | Wall body articulates formula switch board convenient to maintenance | |
CN102386595A (en) | Splicing box | |
CN204597230U (en) | One is high voltage distribution installation line framework arrangement within doors | |
CN202326015U (en) | Off-grid scene complementary mobile box type power generation system | |
CN103332457B (en) | Hydraulic transfer device | |
CN202308973U (en) | Jack box | |
CN201381180Y (en) | Light hydraulic crane | |
CN205335681U (en) | Removable box -type substation | |
CN204947367U (en) | A kind of assembled box-type becomes housing | |
CN201199480Y (en) | Installation apparatus for indoor switch installation mutual-inductor | |
CN202127179U (en) | Bolt-free clamping type connection device of box substation | |
CN202487984U (en) | Low-voltage switch cabinet | |
CN202333546U (en) | Top cover connecting structure of box-type substation | |
CN204356001U (en) | A kind of cable channel cover plate crane-car | |
CN204118522U (en) | A kind of middle-placed switch cabinet | |
CN201922429U (en) | Integrated combination tool case for construction site | |
CN206293805U (en) | Inversion boosting integrated box type transformer station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130717 |
|
CX01 | Expiry of patent term |