CN203062697U - Steel-aluminum composite rail mounter - Google Patents

Steel-aluminum composite rail mounter Download PDF

Info

Publication number
CN203062697U
CN203062697U CN 201320074008 CN201320074008U CN203062697U CN 203062697 U CN203062697 U CN 203062697U CN 201320074008 CN201320074008 CN 201320074008 CN 201320074008 U CN201320074008 U CN 201320074008U CN 203062697 U CN203062697 U CN 203062697U
Authority
CN
China
Prior art keywords
steel
rail
aluminum composite
composite rail
steel aluminium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320074008
Other languages
Chinese (zh)
Inventor
李雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WEISHENG ALUMINUM INDUSTRY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320074008 priority Critical patent/CN203062697U/en
Application granted granted Critical
Publication of CN203062697U publication Critical patent/CN203062697U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model relates to a steel-aluminum composite rail mounter and belongs to a special mounting tool for a steel-aluminum composite conductive rail in an urban mass transit power supply system. Clamping mechanisms mainly comprising right clamping frames, left clamping frames 11, clamping fishplates 2 and the like are respectively clamped on a right steel-aluminum composite rail 1 and a left steel-aluminum composite rail 10; the end face of the left steel-aluminum composite rail is aligned and attached to the end face of the right steel-aluminum composite rail by using a tensioning mechanism consisting of a connecting rod 5, a clamping plate 8 and an annular nut 9; the clearance of a joint 13 is minimized; and then the fishplate 12 is connected and mounted, so that the left steel-aluminum composite rail is connected with the right steel-aluminum composite rail to form a whole, the connection of mechanics and electrics is finished and a third-rail power supply circuit is formed. The steel-aluminum composite rail mounter is small in spark and labor-saving in mounting; and an electric brush of a collector shoe on an electric locomotive has low possibility of being damaged.

Description

The compound rail erector of steel aluminium
Technical field
The utility model relates to the compound rail erector of a kind of steel aluminium, belongs to the erecting tools of steel-aluminium composite conducting rail in the power supply of urban orbit traffic system.
Background technology
Before the utility model was made, in prior art, the artificial installation adopted in the power supply of the 3rd rail of urban track traffic when steel-aluminium composite conducting rail is installed.Require the compound rail gaping of joints of adjacent steel aluminium to minimize, because heavily about 250 kilograms of the compound rail of steel aluminium of long 15m, manpower can't make the gap very little, and the gap reaches 1~2mm.Especially online curved way place, the compound rail of steel aluminium and insulating support frictional force increase, it is bigger that seam crossing gap, back is installed, even reach 3~4mm, and the misalignment up and down of end face, installation quality is poor, and electric spark is bigger than normal when causing supply line's operation, the seam crossing temperature rise, the brush of shoegear is fragile on the locomotive.
The utility model content
The purpose of this utility model is to overcome above-mentioned weak point, thereby provides a kind of minimized specific purpose tool of gaping of joints that makes for the installation of the compound rail of steel aluminium.
The main technical schemes that the utility model is dealt with problems is achieved in that
Adopt the compound rail erector of steel aluminium, mainly the clamp mechanism of being made up of right clamping frame 3 and left clamping frame 11 and clamping fish platee 2 etc. is clamped in respectively on the compound rail 1 of right steel aluminium and the compound rail 10 of left steel aluminium; The tensioning mechanism that utilizes connecting rod 5 and clamp 8 and collar nut 9 to form is adjacent to the end face of the compound rail of left and right sides steel aluminium, the gap minimum of seam 13 is installed connection fish platee 12 then, makes the adjacent compound rail of steel aluminium connect to one, finish machinery and electric being connected, form the 3rd rail supply line.
Compared with the prior art the utility model has the following advantages:
1, the utility model can make the gap of the compound rail seam crossing of adjacent steel aluminium minimize, and the temperature rise of seam crossing is little.
2, it is laborsaving that the utility model makes the installation of the compound rail of steel aluminium.
3, the utility model aligns the end face of the compound rail of seam crossing adjacent steel aluminium up and down, little, the power saving of electric spark when supply line moves; The brush of shoegear is not fragile on the locomotive.
Description of drawings
Fig. 1 is front view of the present utility model, also is the A-A profile of Fig. 2.
Fig. 2 is side view of the present utility model, also is the B-B profile of Fig. 1.
The specific embodiment
The embodiment of following the utility model in by reference to the accompanying drawings is further described:
Fig. 1 is front view of the present utility model, also is the A-A part sectioned view (only cuing open clamping frame and clamp) of Fig. 2, and the right, middle part of Fig. 1 is the compound rail 1 of right steel aluminium, and the left side, middle part is that the intersection of 10, two compound rails of steel aluminium of the compound rail of left steel aluminium is seams 13.The middle of Fig. 1 is that connection fish platee 12, two sides are two clamping fish platees 2, is bolt 7 and wing nut 6 in the middle of it.Right clamping frame 3 and left clamping frame 11 are symmetrically distributed in seam two sides, and the two shape is identical, and above-below direction is opposite.Pin 4 is arranged at right clamping frame 3 tops, and connecting rod 5 can rotate around pin 4.The bottom of right clamping frame 3 has groove, can hold connecting rod 5 on the left clamping frame 11 and turn over and place in this groove.Clamp 8 is inserted on right side, right clamping frame 3 bottom, and left clamping frame 11 upper left-hand are inserted another clamp 8.Insert collar nut 9 from the threaded end of connecting rod 5.Tight a bolt 7, under left and right sides clamping frame all is fixed on situation on the compound rail of left and right sides steel aluminium respectively, further tighten two collar nuts 9, the left and right sides compound rail of steel aluminium is drawn close to the centre, collide until seam 13 place's end faces, realize minimizing of gaping of joints, gap numerical value equals zero.Begin this moment to install and connect fish platee 12, it has 4 holes, bore Φ 17 holes before installing about each, brill is joined with the compound rail of steel aluminium at the scene in Φ 16 holes about each in addition, use nuts, spring shim etc. fastening after four M16 bolts connect fish platee 12 by two, the left and right sides compound rail of steel aluminium is connected to one.After dismantling the bolt 7 on the clamping frame of the left and right sides, left and right sides clamping frame is moved to down the compound rail seam crossing of a pair of steel aluminium do the next round installation, finish machinery and electric being connected, form the 3rd rail supply line.The summer in winter of decades circulation from now on, the seam of this supply line remains the gap minimum, can not be affected by thermal expansion and contraction with season.On collar nut 9 being applied the relative connecting rod 5 of 60NM torque, in the threads turn of M24, make the close about 50KN of pulling force of the left and right sides compound rail of steel aluminium by the generation of left and right sides clamping frame, support 50 manpowers, illustrate that the utility model installation is laborsaving.
Fig. 2 is side view of the present utility model, also is the B-B profile of Fig. 1.Be the compound rail 1 of right steel aluminium in the centre of Fig. 2, its waist is two and clamps fish platees 2 that it is identical with connection fish platee 12 sections to clamp fish platee 2.Right clamping frame 3 covers from top to bottom on the compound rail of steel aluminium.Middle part two sides of right clamping frame 3 respectively have a M16 screwed hole, are screwed into the M16 bolt 7 of band wing nut 6 respectively, enter the blind hole that clamps fish platee 2, tighten two bolts 7, tighten wing nut 6 again, and right clamping frame 3 is fixed on the compound rail 1 of right steel aluminium firmly.Because fish platee is consistent with the compound web of the rail of steel aluminium portion gradient, so such fastening means does not have destruction to the compound rail of steel aluminium, and clamping force is big, and the two does not all have distortion.Fluting in the middle of the top of right clamping frame 3, flat partially this groove that is partially submerged into of connecting rod 5 heads inserts pin 4, makes connecting rod 5 rotate and can not move in other free degree around pin, and connecting rod 5 links together with right clamping frame 3.Another connecting rod 5 that the representative of the circular section of below and left clamping frame 11 link together in the middle of Fig. 2.There is opening the top of clamp 8, and is mobile from the bottom up, blocks connecting rod, leans against right clamping frame 3, makes the connecting rod on the left clamping frame 11 that impetus arranged when collar nut 9 is tightened.The coupling of clamp 8 and collar nut 9 makes that loading and unloading are more quick.Two connecting rods 5 make left and right sides clamping frame transmission to the pulling force of the compound rail of left and right sides steel aluminium up and down.Because right clamping frame 3 and left clamping frame 11 are all symmetrical up and down, make the left and right sides compound rail of steel aluminium its end face after installation to align up and down.As long as pin 4 has certain quality of fit with hole three on connecting rod 5 and the clamping frame, and the longitudinal centre line of the side of clamping frame and the compound rail of steel aluminium is perpendicular, align about just can making the end face of the compound rail of left and right sides steel aluminium further.Fish platee is consistent with the compound web of the rail of steel aluminium portion gradient in addition, makes the supply line after the compound rail of steel aluminium is installed have the favorable mechanical precision, and electric spark reduced when its linearity and flatness made the circuit operation, and the brush of shoegear is not fragile in the electric locomotive.The temperature rise of seam crossing is low.

Claims (1)

1. compound rail erector of steel aluminium, comprise clamp mechanism and tensioning mechanism, it is characterized in that a pair ofly by right clamping frame (3) and left clamping frame (11) and clamp the clamp mechanism that fish platee (2) forms and be clamped in respectively on the compound rail of right steel aluminium (1) and the compound rail of left steel aluminium (10), it is zero that the tensioning mechanism of being made up of connecting rod (5) and clamp (8) and collar nut (9) makes the gap of the compound rail seam of left and right sides steel aluminium (13).
CN 201320074008 2013-01-14 2013-01-14 Steel-aluminum composite rail mounter Expired - Fee Related CN203062697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320074008 CN203062697U (en) 2013-01-14 2013-01-14 Steel-aluminum composite rail mounter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320074008 CN203062697U (en) 2013-01-14 2013-01-14 Steel-aluminum composite rail mounter

Publications (1)

Publication Number Publication Date
CN203062697U true CN203062697U (en) 2013-07-17

Family

ID=48761523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320074008 Expired - Fee Related CN203062697U (en) 2013-01-14 2013-01-14 Steel-aluminum composite rail mounter

Country Status (1)

Country Link
CN (1) CN203062697U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103072113A (en) * 2013-01-14 2013-05-01 李雷 Steel aluminum composite rail installer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103072113A (en) * 2013-01-14 2013-05-01 李雷 Steel aluminum composite rail installer

Similar Documents

Publication Publication Date Title
CN102975847A (en) Device and method for assembling two sections of aircraft fuselage
CN203062697U (en) Steel-aluminum composite rail mounter
CN103669996B (en) The hard safe fence of rapid-assembling/disassembling
CN202071716U (en) Expansion joint applied to power supply system of side-direction current-receiving steel-aluminum composite contact rail
CN210797143U (en) Precast concrete pavement slab assembling and connecting structure
CN105805123A (en) Module frame structure connected through conical nuts
CN103072113A (en) Steel aluminum composite rail installer
CN202669537U (en) Small curve expansion joint for medium-low speed magnetic levitation side current collecting steel-aluminum composite conduct rail
CN211549433U (en) Aluminum alloy window convenient to installation
CN204739343U (en) Adjustable hinge rubber expansion joint of double entry
CN221143074U (en) Adapter for steel construction convenient to install for steel construction
CN219154294U (en) C-shaped contact rail intermediate joint
CN205820668U (en) Escalator and moving sidewalk support body attachment means
CN220544933U (en) Assembled photovoltaic support
CN212171986U (en) Expansion joint
CN218809940U (en) Telescopic compensation connecting structure of overhead traveling crane track
CN221688259U (en) Right-angle hanging plate convenient to assemble
CN215716055U (en) Fastener for assembly type building steel structure
CN221276900U (en) Wall heat preservation structure
CN112274878B (en) Multifunctional climbing device for distribution network of power supply company, assembling method and using method
CN113847304B (en) Hydraulic cylinder of hydraulic cementing insulating clamping plate dismantling device
CN219175319U (en) Buckle formula prefabricated piping lane fixed knot constructs
CN220793480U (en) Application system of light rail train site source heat pump
CN103247961A (en) V-shaped pull rod fixture for live working of changing large-tension tension insulator
CN2502437Y (en) Plugging cable bridge support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANDONG WEISHENG ALUMINUM CO., LTD.

Free format text: FORMER OWNER: LI LEI

Effective date: 20140312

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 214000 WUXI, JIANGSU PROVINCE TO: 262600 WEIFANG, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140312

Address after: 262600 No. 106 East Ring Road, Linqu County, Shandong Province, China

Patentee after: SHANDONG WEISHENG ALUMINUM INDUSTRY CO., LTD.

Address before: The canal Nanchang District of West Wuxi City, Jiangsu province 214000 Sheng Xin Li, No. 29-302

Patentee before: Li Lei

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20160114

EXPY Termination of patent right or utility model