CN203055271U - Intelligent charge-control electric energy meter and installing, debugging and training device for acquisition terminal of intelligent charge-control electric energy meter - Google Patents

Intelligent charge-control electric energy meter and installing, debugging and training device for acquisition terminal of intelligent charge-control electric energy meter Download PDF

Info

Publication number
CN203055271U
CN203055271U CN 201220683464 CN201220683464U CN203055271U CN 203055271 U CN203055271 U CN 203055271U CN 201220683464 CN201220683464 CN 201220683464 CN 201220683464 U CN201220683464 U CN 201220683464U CN 203055271 U CN203055271 U CN 203055271U
Authority
CN
China
Prior art keywords
phase
electric energy
energy meter
control electric
training
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220683464
Other languages
Chinese (zh)
Inventor
赵喜云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vocational & Technic Training Center Of Hebei Electric Power Corp
State Grid Corp of China SGCC
Original Assignee
Vocational & Technic Training Center Of Hebei Electric Power Corp
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vocational & Technic Training Center Of Hebei Electric Power Corp, State Grid Corp of China SGCC filed Critical Vocational & Technic Training Center Of Hebei Electric Power Corp
Priority to CN 201220683464 priority Critical patent/CN203055271U/en
Application granted granted Critical
Publication of CN203055271U publication Critical patent/CN203055271U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model discloses an intelligent charge-control electric energy meter and an installing, debugging and training device for the acquisition terminal of the intelligent charge-control electric energy meter, which relates to the technical field of metering electric energy, installing and wiring meters and acquiring electricity information. The intelligent charge-control electric energy meter and the installing, debugging and training device for the acquisition terminal thereof comprise a frame, a three-phase earth leakage protection switch, a three-phase wiring terminal strip, a three-phase prepaid load control switch and a load plugboard, wherein the three-phase earth leakage protection switch, the three-phase wiring terminal strip, the three-phase prepaid load control switch and the load plugboard are fixed onto the frame. The three-phase power supply terminal of the device is electrically connected with the incoming terminal of the three-phase wiring terminal strip through the three-phase earth leakage protection switch. The output terminal of the three-phase prepaid load control switch is electrically connected with the load plugboard. According to the technical scheme of the utility model, due to the adoption of the device, the problem that the installing, debugging and training operation on intelligent charge-control electric energy meters and concentrators cannot be realized by traditional installing and training devices is effectively solved. Meanwhile, the on-load operation of each phase is also enabled to greatly extend the training function. In this way, the training program on debugging intelligent charge-control electric energy meters and concentrators can be realized, while the power-off maintenance, fault handling and other training programs can also be realized.

Description

A kind of intelligence is taken control electric energy meter and acquisition terminal Installation and Debugging training set thereof
Technical field
The utility model relates to electric energy metrical, the dress table connects electricity, power information acquisition technique field, relates in particular to a kind of intelligence expense control electric energy meter and acquisition terminal Installation and Debugging training set thereof.
Background technology
Along with the construction of intelligent grid, the applying of power information acquisition system, intelligence expense control electric energy meter and concentrator have been widely used in that low pressure is single, the three phase supply user.Paid dues by the user intellective IC card is supplemented with money and imported in the ammeter, ammeter could be powered, the outage of operating a switch automatically after electric weight uses up in the table, thus solved the difficult problem of checking meter to the doorstep and collect charges for electricity effectively.User's the telecommunications breath purchased is carried out computer management, conveniently inquires about, adds up, charge and printed tickets etc.
It is big that intelligence expense control electric energy meter and concentrator are installed, the debugging job has workload, the technical requirement height, and the operation number is many, dangerous big characteristics.That is engaged in this work has thousands of people approximately, connects electricity at electric energy metrical, dress table, power information is gathered in the professional training, and the training of these two projects is very important training projects.Intelligence expense control electric energy meter and concentrator are installed and are belonged to the power failure project, and intelligence is taken control electric energy meter and the concentrator debugging must be charged, just can finish the combined debugging that power information is gathered main website, electric energy meter and concentrator.Traditional electric energy meter training on installation device can only carry out common electric energy meter training on installation, can not hot line job, more can not carry out intelligence expense control electric energy meter and concentrator debugging training.
The utility model content
Technical problem to be solved in the utility model provides a kind of intelligence expense control electric energy meter and acquisition terminal Installation and Debugging training set thereof, and described device can carry out installation and the debugging training of intelligence expense control electric energy meter and concentrator.
For solving the problems of the technologies described above; technical solution adopted in the utility model is: a kind of intelligence expense control electric energy meter and acquisition terminal Installation and Debugging training set thereof; comprise framework; it is characterized in that also comprising the three-phase electric leakage protection switch, three-phase terminal row, three-phase prepayment load control switch and the load plate that are fixed on the framework; the three-phase supply terminals of described device are electrically connected through the end of incoming cables of three-phase electric leakage protection switch with three-phase terminal row, and the output terminal of described three-phase prepayment load control switch is electrically connected with the load plate.
Preferably: described load plate is three, is connected in parallel on the output terminal of three-phase prepayment load control switch respectively.
Preferably: described load plate is single-phase five spring hole scokets.
The beneficial effect that adopts technique scheme to produce is: described device has effectively solved the problem that traditional electric energy meter training on installation device can not carry out installation and the debugging training of intelligence expense control electric energy meter and concentrator, each can be with actual load mutually, the training function is expanded greatly, not only realized the training of intelligent expense control electric energy meter and concentrator debugging job, also can finish installation, have a power failure and check, send, the training of jobs such as charged inspection and fault handling, the training functions expanding is from installing, send, the overall process training of charged inspection and fault handling, make training project more complete, result of training is more obvious, is conducive to improve staff's total quality.In addition, described device simple in structure, low cost of manufacture has and promotes preferably and the use prospect.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is theory diagram of the present utility model;
Fig. 2 is the connection principle block diagram of intelligence expense control electric energy meter and concentrator.
Embodiment
As shown in Figure 1, a kind of intelligence is taken control electric energy meter and acquisition terminal Installation and Debugging training set thereof, comprises framework, also comprises the three-phase electric leakage protection switch, three-phase terminal row, three-phase prepayment load control switch and the load plate that are fixed on the framework.The three-phase supply terminals of described device are electrically connected through the end of incoming cables of three-phase electric leakage protection switch with three-phase terminal row; preferred described load plate is single-phase five spring hole scokets, and a plurality of single-phase five spring hole scokets are connected in parallel on the output terminal of described three-phase prepayment load control switch.
When three-phase intelligent expense control electric energy meter and concentrator are installed, carry out wiring according to shown in Figure 2.One group of leading-out terminal of three-phase terminal row is connected with the input end of current transformer, and an output terminal of current transformer is connected with the input end of three-phase prepayment load control switch; The secondary current output terminal of another group leading-out terminal summation current transformer of three-phase terminal row is connected with the end of incoming cables of secondary circuit experimental wiring box, one group of leading-out terminal of secondary circuit experimental wiring box is connected with concentrator, another group leading-out terminal of secondary circuit experimental wiring box is connected with the input end of three-phase intelligent expense control electric energy meter, and the control signal output terminal that three-phase intelligent takes control electric energy meter is connected with the control end of three-phase prepayment load control switch.
Described device has following characteristics: (1) has increased the energising function.Three-phase supply is guided on the connection terminal, makes intelligence expense control electric energy meter, concentrator, mutual inductor and terminal box can be installed on the device, can switch on again and carry out the relevant training of hot line job; (2) increased pre-payment control function.Go out wiretap behind the three-phase intelligent expense control electric energy meter and adopt the three-phase prepayment load control switch, can carry out pre-payment control; (3) increased real burden functional.From gauge tap end opening three-phase single-phase five spring hole scokets are installed respectively, can be inserted single-phase load; (4) safety practice.Improve electric power incoming line and adopted the three-phase electric leakage protection switch, the base plate that power supply connects the lead-in wire place changes insulcrete, equipment ground into by sheet metal, has eliminated potential safety hazard.
Described device can carry out following project training: (1) three-phase intelligent expense control electric energy meter and concentrator training on installation; (2) three-phase intelligent takes control electric energy meter and concentrator power failure inspection training; (3) three-phase intelligent takes control electric energy meter and concentrator debugging training; (4) three-phase intelligent takes control electric energy meter and the charged inspection of concentrator and fault handling training.
The using method of described device is as follows: (1) three-phase intelligent takes control electric energy meter and concentrator training on installation method.Disconnect earth leakage circuit-breaker and load control switch earlier and carry out wiring according to Fig. 2, can carry out the training of intelligence expense control electric energy meter, concentrator, terminal box, mutual inductor installation.(2) three-phase intelligent takes control electric energy meter and concentrator power failure inspection Training Methodology.After the installation of finishing intelligence expense control electric energy meter, concentrator, terminal box, mutual inductor, can carry out.(3) intelligence is taken control electric energy meter and concentrator debugging training.After finishing intelligence expense control electric energy meter, concentrator, terminal box, mutual inductor installation, close earth leakage circuit-breaker and load control switch carry out the setting of concentrator parameter and the power information main website files, and can carry out intelligence expense control electric energy meter and concentrator debugging training.(4) intelligence is taken control electric energy meter and the charged inspection of concentrator and fault handling training.After finishing intelligence expense control electric energy meter, concentrator, terminal box, mutual inductor installation, close earth leakage circuit-breaker and load control switch can carry out intelligence expense control electric energy meter and the charged inspection of concentrator and fault handling training.
Described device has effectively solved the problem that traditional electric energy meter training on installation device can not carry out installation and the debugging training of intelligence expense control electric energy meter and concentrator, each can be with actual load mutually, the training function is expanded greatly, not only realized the training of intelligent expense control electric energy meter and concentrator debugging job, also can finish installation, have a power failure and check, send, the training of jobs such as charged inspection and fault handling, the training functions expanding is from installing, send, the overall process training of charged inspection and fault handling, make training project more complete, result of training is more obvious, is conducive to improve staff's total quality.In addition, described device simple in structure, low cost of manufacture has and promotes preferably and the use prospect.

Claims (3)

1. an intelligence is taken control electric energy meter and acquisition terminal Installation and Debugging training set thereof; comprise framework; it is characterized in that also comprising the three-phase electric leakage protection switch, three-phase terminal row, three-phase prepayment load control switch and the load plate that are fixed on the framework; the three-phase supply terminals of described device are electrically connected through the end of incoming cables of three-phase electric leakage protection switch with three-phase terminal row, and the output terminal of described three-phase prepayment load control switch is electrically connected with the load plate.
2. a kind of intelligence according to claim 1 is taken control electric energy meter and acquisition terminal Installation and Debugging training set thereof, it is characterized in that described load plate is three, is connected in parallel on the output terminal of three-phase prepayment load control switch respectively.
3. a kind of intelligence according to claim 1 is taken control electric energy meter and acquisition terminal Installation and Debugging training set thereof, it is characterized in that described load plate is single-phase five spring hole scokets.
CN 201220683464 2012-12-12 2012-12-12 Intelligent charge-control electric energy meter and installing, debugging and training device for acquisition terminal of intelligent charge-control electric energy meter Expired - Fee Related CN203055271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220683464 CN203055271U (en) 2012-12-12 2012-12-12 Intelligent charge-control electric energy meter and installing, debugging and training device for acquisition terminal of intelligent charge-control electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220683464 CN203055271U (en) 2012-12-12 2012-12-12 Intelligent charge-control electric energy meter and installing, debugging and training device for acquisition terminal of intelligent charge-control electric energy meter

Publications (1)

Publication Number Publication Date
CN203055271U true CN203055271U (en) 2013-07-10

Family

ID=48738201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220683464 Expired - Fee Related CN203055271U (en) 2012-12-12 2012-12-12 Intelligent charge-control electric energy meter and installing, debugging and training device for acquisition terminal of intelligent charge-control electric energy meter

Country Status (1)

Country Link
CN (1) CN203055271U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103456199A (en) * 2013-09-13 2013-12-18 郑州万特电气股份有限公司 Power utilization information collection simulation system
CN106327979A (en) * 2016-10-28 2017-01-11 国网河南省电力公司电力科学研究院 Analog and simulation training system for collecting power information
CN109994013A (en) * 2019-04-12 2019-07-09 广西电网有限责任公司桂林供电局 Low-voltage collecting meter reading failure safe hidden troubles removing emulation training device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103456199A (en) * 2013-09-13 2013-12-18 郑州万特电气股份有限公司 Power utilization information collection simulation system
CN103456199B (en) * 2013-09-13 2015-07-29 郑州万特电气股份有限公司 Power information gathers simulation system
CN106327979A (en) * 2016-10-28 2017-01-11 国网河南省电力公司电力科学研究院 Analog and simulation training system for collecting power information
CN109994013A (en) * 2019-04-12 2019-07-09 广西电网有限责任公司桂林供电局 Low-voltage collecting meter reading failure safe hidden troubles removing emulation training device
CN109994013B (en) * 2019-04-12 2024-05-14 广西电网有限责任公司桂林供电局 Low-voltage centralized meter reading fault potential safety hazard investigation simulation training device

Similar Documents

Publication Publication Date Title
CN105390053B (en) Intelligent electric energy meter and power information collection site simulation training platform
CN102497021B (en) Real-time monitoring and analysis system for distribution circuit
CN102722851B (en) A kind of majority based on intelligent power grid technology is according to interface synthesis line loss management system of local electric network
CN102116857B (en) Method for checking electric quantity at power grid gate
CN102707156B (en) Method for finely and accurately comparing line losses based on smart-grid technology
CN204391903U (en) A kind of line loss monitoring system
CN105891597A (en) High voltage power transmission line electric energy wireless monitoring device and monitoring method
CN106816813A (en) The method of power distribution network current transformer installing structure and charged for replacement current transformer
CN202817732U (en) Portable intelligent protection device used for intelligent transformer station
CN110542772A (en) Nondestructive replacement device and method for electric energy meter
CN203055271U (en) Intelligent charge-control electric energy meter and installing, debugging and training device for acquisition terminal of intelligent charge-control electric energy meter
CN102890170B (en) Three-phase electric energy meter false wiring automated conversion system
CN103138388A (en) Power distribution station management system
CN206194030U (en) High pressure prepayment device and system
CN105301449A (en) Portable line loss measuring and calculating apparatus for power distribution network
CN204557576U (en) A kind of system realizing electrical network statistical line losses synchronism
CN203689675U (en) Remote connection control device for low-voltage customer electricity consumption information acquisition terminal
CN202230116U (en) American-style high voltage prepayment control metering cabinet
CN201928091U (en) Intelligent power distribution electric energy management centralized control cabinet
CN202906218U (en) Novel intelligent charge controllable box type transformer
CN206193104U (en) Measurement device for distribution transformer earth impedance , power consumption
CN202033395U (en) Multifunctional intelligent high-voltage metering box
CN203759913U (en) Low-voltage information collection simulated training device
CN203949969U (en) Residual current monitoring warning device
CN201262780Y (en) Bi-metering multiuser electric energy remote pre-payment synthesis monitoring apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130710

Termination date: 20191212