CN203045149U - Special exothermic welding mold for coke oven mobile machine track - Google Patents

Special exothermic welding mold for coke oven mobile machine track Download PDF

Info

Publication number
CN203045149U
CN203045149U CN 201220648390 CN201220648390U CN203045149U CN 203045149 U CN203045149 U CN 203045149U CN 201220648390 CN201220648390 CN 201220648390 CN 201220648390 U CN201220648390 U CN 201220648390U CN 203045149 U CN203045149 U CN 203045149U
Authority
CN
China
Prior art keywords
sand mold
track
rail
crucible
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220648390
Other languages
Chinese (zh)
Inventor
王进
余江利
任友志
贾玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING BRANCH CHINA 19TH METALLURGICAL Corp
Original Assignee
NANJING BRANCH CHINA 19TH METALLURGICAL Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING BRANCH CHINA 19TH METALLURGICAL Corp filed Critical NANJING BRANCH CHINA 19TH METALLURGICAL Corp
Priority to CN 201220648390 priority Critical patent/CN203045149U/en
Application granted granted Critical
Publication of CN203045149U publication Critical patent/CN203045149U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a special exothermic welding mold for a coke oven mobile machine track. The special exothermic welding mold comprises a sand mold and a crucible, wherein a stop block is also arranged in the sand mold, the stop block is arranged right above steel rails when in use, and a gap is arranged between the stop block and the steel rails; the sand mold is fixed on the steel rails through an arch clamp, the left end and the right end of the sand mold are sealed through box sealing mud, so that a cavity with an opening only on the upper part is formed in the sand mold, the ends of the two steel rails are arranged in the cavity, and two transverse sides of each steel rail are not contacted with the sand mold; the opening is used for pouring soldering flux; the lower part of the crucible is provided with a pouring port; when in use, the crucible is arranged right above the sand mold, and the pouring port is right opposite to the opening; exothermic soldering flux which is matched with the steel rails is also arranged in the crucible; a high-temperature match which is used as an igniter is plugged right in the middle of the top surface of the exothermic soldering flux; and the top end of the high-temperature match is 3 to 5mm higher than the soldering flux. The opening of the sand mold is right opposite to the pouring port, so that timeliness in pouring can be realized, cleanliness inside the sand mold can be realized, and the welding quality is good by adopting the exothermic soldering flux.

Description

Be applied to the exothermic welding particular manufacturing craft of coke oven mechanically moving track
Technical field
The utility model relates to a kind of method of using the exothermic welding welded rails, relates in particular to a kind of exothermic welding method that is applied to coke oven mechanically moving track
Background technology
Track as lifting and transportation usefulness often runs in our installing engineering, but the aluminothermy welding is carried out in many requirements in the method for attachment of track, four carts such as pusher machine, charging car, coke guide, coke quenching cart are plant equipment important in the coke oven, be commonly called as four carts, the quality that Post Orbit is installed and welded under its row directly influences four cart working conditions, and the key of exothermic welding is the temperature of control track heating, temperature is controlled well could be guaranteed the quality of welding.
The utility model content
The purpose of this utility model is to provide a kind of exothermic welding particular manufacturing craft that is applied to coke oven mechanically moving track that can guarantee welding quality.
For realizing above-mentioned technical purpose problem, the technical scheme that the utility model is taked is: a kind of exothermic welding particular manufacturing craft that is applied to coke oven mechanically moving track comprises sand mold and crucible; Also be provided with the block that is fixedly connected on the sand mold in the sand mold, during use, block is positioned at directly over the rail, between block and the rail space is arranged; Sand mold is fixed on the rail by clamp, and the left and right two ends of sand mold are by joint sealing mud sealing, makes sand mold inside form the chamber that opening is arranged at top only, and the termination of two rail is positioned at chamber, and the both lateral sides of rail does not contact with sand mold; Described opening is used for the cast solder flux; The crucible bottom is provided with the sprue gate; During use, crucible is positioned at directly over the sand mold, and the sprue gate faces opening; Also be provided with the aluminum heat flux suitable with rail in the crucible; Aluminum heat flux end face center is inserted with the high-temperature match that uses as fuse; The top of high-temperature match exceeds solder flux 3-5 millimeter.
As the further improved technical scheme of the utility model, described aluminum heat flux comprises aluminium, iron oxide, ferroalloy and iron nail bits.
The opening of sand mold of the present utility model faces the sprue gate of top, and cast is timely, and cleaning, clean adopts aluminum heat flux in the sand mold, and welding quality is good.
Description of drawings
Fig. 1 is the permanent center target structural representation of embodiment 1.
Fig. 2 is the layout schematic diagram of the permanent datum mark of embodiment 1.
Fig. 3-1 is the dimensional discrepancy schematic diagram of thickness direction of the sleeper case of embodiment 1.
Fig. 3-2 is the dimensional discrepancy schematic diagram of the bolt hole on the sleeper case of embodiment 1.
Fig. 3-3 is the dimensional discrepancy schematic diagram of length direction, width and bolt hole of the sleeper case of embodiment 1.
Fig. 4 is crucible, sand mold and the rail structural representation before the cast aluminum heat flux.
Fig. 5 is crucible, sand mold and the rail structural representation in the cast aluminum heat flux process.
Fig. 6 is crucible, sand mold and the rail structural representation of cast aluminum heat flux after finishing.
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described further.
The specific embodiment
Embodiment 1
Referring to Fig. 1, should be used for the exothermic welding particular manufacturing craft of coke oven mechanically moving track, comprise sand mold 1 and crucible 6; Also be provided with the block 3 that is fixedly connected on the sand mold 1 in the sand mold 1, during use, block 3 is positioned at directly over the rail 4, between block 3 and the rail 4 space is arranged; Sand mold 1 is fixed on the rail 4 by clamp, the left and right two ends of the sand mold of sand mold 1 are by the sealing of joint sealing mud, make sand mold 1 inside form the chamber that opening 5 is arranged at top only, the termination of two rail 4 is positioned at chamber, and the both lateral sides of rail 4 does not contact with sand mold 1; Described opening 5 is used for the cast solder flux; Crucible 6 bottoms are provided with sprue gate 7; During use, crucible 6 is positioned at directly over the sand mold 1, and sprue gate 7 faces opening 5; Also be provided with the aluminum heat flux 2 suitable with rail 4 in the crucible 6; Aluminum heat flux 2 end faces center is inserted with the high-temperature match that uses as fuse; The top of high-temperature match exceeds solder flux 3-5 millimeter.Described aluminum heat flux comprises aluminium, iron oxide, ferroalloy and iron nail bits.
In the time of should being used for the exothermic welding particular manufacturing craft use of coke oven mechanically moving track, the termination of two one steel rails to be welded is placed in the sand mold, and the slit between the termination of described two one steel rails is 24-28 ㎜; After rail preheating and termination preheating are finished, light high-temperature match, make aluminum heat flux that strong chemical reaction take place immediately, in chemical reaction process, iron is reduced out, and iron is owing to than the great crucible bottom that is sunken to, and alumina changes into alundum (Al, alundum (Al forms slag owing to gently floating on crucible top with respect to iron; Produce huge heat in the chemical reaction process simultaneously, make the aluminothermy molten steel that forms high temperature in the crucible; The aluminothermy molten steel of high temperature pours in the sand mold by sprue gate and opening immediately, and with the termination fusing of two firm rails, casting metal itself as filling metal, gets up two rail welding again simultaneously; Described aluminum heat flux comprises aluminium, iron oxide, ferroalloy and iron nail bits.In addition, also be provided with the block that is fixedly connected on the sand mold in the sand mold, block is positioned at directly over the rail, between block and the rail space is arranged; When the aluminothermy molten steel of high temperature pours in the sand mold by sprue gate and opening, be poured on the block earlier.Aluminum heat flux (also claim heat release welding) is exactly that hot molten metal comes heating of metal and the method that realizes combination for crossing of utilizing that exothermic reaction between metal oxide and the metallic aluminium produces.Exothermic welding and aluminum heat flux are prior art, also claim the heat release weldering.The heat release welding was originated 19 end of the centurys, H. dagger-axe moral Schmidt found that aluminium powder and metal oxide can make it to begin exothermic reaction by external heat source at that time, and in case reaction just can continue voluntarily, the general formula of this reaction is: metal oxide+aluminium (powder) → aluminium oxide+metal+heat energy.Heat release melting welding mainly can be welded fine copper, brass, bronze, red copper, copper covered steel, pure iron, stainless steel, wrought iron, zinc-plated iron-steel, cast iron etc.
In the present embodiment, the equipment of employing mainly contains: push away knurl machine, preheat burner, welding upset frame, sanding machine etc.Wherein, the track model is the steel rail for crane of QU100 specification, and rail clip has different size, will note the differentiation of rail clip in construction.Four big Car Tracks adopt exothermic welding to weld.The charging car track adopts 70ZM100 type rail pressing device, the pusher machine track adopts 70TJ100 type rail pressing device, the WJK crane runway fixture that the coke quenching cart track adopts nine divisions of China in remote antiquity, Henan Province mechanical fitting factory to produce, wherein bolt, nut adopt stainless steel material, and the coke guide track adopts WJK, HWJK, the HDGY series rail pressing device of Universal Machinery Factory, Changge City, Henan Prov.And the coke quenching cart track is to lay sleeper to adopt the special-purpose backing plate of track to cooperate the mode trapped orbit of railway spike in quenching tower to transfer platform section.The groundwork amount of each track is as shown in table 1.
Table 1: each track groundwork scale
Sequence number Project name Workload (t) Remarks
1 The pusher machine track 70.918t Totally 687 meters on track
2 The charging car track 183.338t Totally 576.5 meters on track
3 The coke guide track 59.425t Totally 668 meters on track
4 The coke quenching cart track 81.043t Totally 911 meters on track
Before carrying out exothermic welding, at first to carry out preceding the preparation is installed, mainly comprise: be ready to track required drawing, technical data, installation specification etc. are installed; Carry out that necessary design is told somebody what one's real intentions are and drawing from examine, joint hearing, and keep a record; Write arrangement and method for construction, and examine by at different levels; Implement the workmen and to the personnel of executing carry out construction technology, construction safety is told somebody what one's real intentions are, and carries out record; Stack the place to implementing good track; Prepare construction recruitment facility; Deeply on-the-spot, the actual conditions of checking the installation site are determined the required condition of track installation; Perform middle handing-over with civil engineering company, each measurement is carried out the repetition measurement inspection with datum mark.
Before the attachment rail, also tackle the coke oven axis and longitudinal and transverse center line is measured inspection, and the measurement achievement of tackling last operation carries out the repetition measurement inspection, its precision should not be lower than " coking plant equipment project installation acceptance specification " GB50390-2006.The regulation of appendix 2.Coke oven vertical, horizontal center line with retest-ok is as the criterion, and surveys and establishes the datum line that track is installed, and measures the following baseline of installing: body of heater length control line and limit carbonization chamber center line; Machine, burnt both sides frontal line; The ram track centerline; The coke guide track centerline; The coke quenching cart track centerline; The charging car track centerline.
Before track is installed, needs in the time of also will overhauling equipment according to design, installation and future, draw permanent center target and permanent datum mark layout drawing, as depicted in figs. 1 and 2, indicate in the drawings permanent center target and permanent datum mark numbering, the position is set.Be as the criterion with permanent datum line and datum mark according to needs are installed, set up sectional center target and datum mark.
Before attachment rail, want also earlier the track of showing up to be checked that check whether rail meets the following requirements: the length allowable error is ± 5 ㎜.The track width allowable error is :-2~+ 1mm; Flange of rail width allowable error is :-2~+ 1mm; Track overall height allowable error is ± lmm.The degree of asymmetry of cross section and vertical axis: the flange of rail must not surpass 2mm, and rail head must not surpass 0.6mm; Rail do not allow above 1mm rectify the local deformation cause because of cold, be the ruler measurement of 0.5m with length; L.5mm/m the flexibility of rail must not surpass; Rail has not allowed twisted phenomena; The rail end all should be perpendicular to the longitudinal axis of rail, and end face crooked amount in any direction should not surpass 5mm, and the flash size is not more than 4mm.
Wherein, the charging car track is wanted pre-buried sleeper case in the coke oven body regions, and the sleeper case is shown up and also will be checked it.The dimensional discrepancy of sleeper case is appearance and size deviation ± 3 ㎜, bolt hole dimensional discrepancy ± 2 ㎜.The dimensional discrepancy schematic diagram of the sleeper case of present embodiment 1 is shown in Fig. 3-1, Fig. 3-2 and Fig. 3-3, Fig. 3-1 is the dimensional discrepancy schematic diagram of thickness direction of the sleeper case of embodiment 1, Fig. 3-2 is the dimensional discrepancy schematic diagram of the bolt hole on the sleeper case of embodiment 1, and Fig. 3-3 is the dimensional discrepancy schematic diagram of length direction, width and bolt hole of the sleeper case of embodiment 1.
And four big Car Tracks are when installing, and lift to put in the time of adopting truck crane to unload track to put in place, and particularly the charging car orbital position is the highest, adopts the 50t truck crane to lift.Measure the absolute altitude of track foundation, according to the track pad of the prefabricated different size of basic actual conditions, so that track uses when installing.
Wherein the coke guide track is installed: coke guide first rail is put the back well at coke side operating desk girder steel and is installed, and coke guide second rail installs the back installation at cleaning shaft support and the coke guide second rail steel structure.13.735 meters of the coke guide first gauge coke oven center lines, the track of end platform and a platform section is dug out seat slurry hole to concrete foundation earlier, its length and width are than backing plate length and big 60 ~ 80 ㎜ of width, and seat slurry cross-cut chisel is gone into depth of foundation and is not less than 30 ㎜, and seat slurry layer thickness is not less than 50 ㎜.Backing plate is placed on the seat slurry layer, adjusts absolute altitude.Fastener for installing was fixed after place mat rubber blanket below track, track were adjusted to the absolute altitude of requirement, carried out back-grouting again.The track of coke oven section is installed on the girder steel of operating desk, place mat rubber blanket below the track, and rail clip is welded on the steel plate.23.285 meters of the coke guide second gauge coke oven center lines, on the steel platform, after track adjusted, with backing plate and platform welding, fastener for installing was fixed track again with ready flat bolster pad.
Coke guide track method of adjustment: at first find out track centerline, according to the distance between coke oven center line and track centerline, (being the coke oven two ends) bonding wire frame at the track two ends is hung center line, look for orbit centre with plumb bob, orbit centre is measured the track absolute altitude after determining again.Can adopt level measurement when measuring absolute altitude, also can measure absolute altitude at several furnace stays, pull on horizontal line, measure about two coke guide track absolute altitudes with horizon rule.The coke guide track of adjusting should reach following requirement: total length rail level absolute altitude ± 5mm, per 5 carbonization chamber rail level elevation difference ± 3; Each section rail road centerline deviation can not surpass 2.0mm; The gauge deviation of two tracks can not surpass ± 2mm; Slit 0 ~ 3 ㎜ of rail joint can not be excessive or too small; Every meter gradient of rail can not have twisted phenomena radius off-set joint permissible variation 1.0mm less than 1/1000, and generally detecting by an unaided eye gets final product; The center line depth of parallelism ± 2mm between track centerline and two rails; Rail bottom backing plate should fill up, and loosening situation mustn't be arranged; Install car bumper, catch at last.
The ram track is installed and is comprised:
Preceding preparation is installed, namely before installation, should checks the center line of foundation bolt, check foundation of civil work absolute altitude and anchor bolt length;
Track is installed, and namely determines track centerline, at weldering center, track two ends coil holder, draws the center line steel wire, and the hanging wire hammer checks its center line, and permissible variation is ± 3mm that the gauge deviation of two tracks can not surpass ± 2mm;
Measure the track absolute altitude, every track has 5 above measuring points, allowable error ± 5mm at least.Adjust the absolute altitude of track with preprepared backing plate;
Track is installed the back bolt and should be exposed more than 3 on nut buckles, and backing plate should fill up tightly;
Install car bumper, catch at last.
The charging car track is installed: the charging car track is positioned at the coke oven furnace roof, is provided with the sleeper case below the track.Reach 650 ℃ at oven drying temperature, could install when furnace expansion is over substantially and adjust the charging car track.In the baker later stage, work on the spot is more, generally reaches 650 ℃ in furnace temperature and just the sleeper case is prepared in advance in the past, puts into furnace roof and lays bricks, and then track is laid out, and treats to adjust after furnace temperature reaches 650 ℃ fixing.When being installed, the charging car track should note following each point:
The first, check earlier whether the screw thread of the fang bolt in the charging car sleeper case is complete, and whether degree of tightness was suitable after nut was screwed on, and after installation, bolt exposes 3 on nut at least and buckles.
The second, should check brick hole size and absolute altitude before charging car sleeper case is buried underground earlier, its deviation ± 5 ㎜.The sleeper case is installed the heat resistance concrete of stipulating with construction drawing in the sleeper case to be filled up in preceding 1 month and is made firm by ramming, and the bottom surface is floating, fully health.When the sleeper case is installed, at first smear on the brick cup with clay chamotte mortar, put into the sleeper case then, centering, levelling.Prescind suspension ring, use the chamotte ash that jointing is tight, floating all around.Sleeper case end face absolute altitude deviation ± 3 ㎜. the installation of sleeper case also available asbestos pad or sheet metal pads it, and grouting again behind levelling, the centering is sunk in case track is installed the back.
Three, center line and the absolute altitude with coal tower section and stove end platform charging car track partly finds.The track in end platform district is installed, and carries out seat slurry heap earlier, will adjust backing plate and put well, adjust to absolute altitude after, attachment rail support and track again, track carries out back-grouting after adjusting to absolute altitude.
Four, the cast iron sleeper of oven body part and track temporarily are set up on the body of heater fixing, track bottom backing plate should fill up sternly.Note track not being welded on the furnace stay cross-brace temporarily.
Five, track should be installed after the first alignment again, should guarantee not crooked.
Six, treat to pacify the center coil holder at the track two ends after furnace temperature reaches 650 ℃, hanging wire finds the charging car orbit centre, and two track to track centerline range deviations are ± 2mm.Rail level absolute altitude deviation is ± 3mm.Survey a bit every 2 carbonization chamber centre-to-centre spacing, adjacent 2 elevation differences are not more than 2 ㎜, and during adjustment, stove district track centerline should be consistent with coal district track with absolute altitude.
Seven, car bumper, catch are installed at last.
The installation of coke quenching cart track: the installation method of coke quenching cart track and above-mentioned each Car Track are roughly the same.Because the coke quenching cart speed of a motor vehicle is very fast, therefore should note the track installation quality.Total length rail level absolute altitude tolerance is ± 5mm.Distance+2 between per 5 carbonization chamber rail level elevation differences≤2, two rail, the center line depth of parallelism ± 1.5mm between track centerline and two rails should consider coking furnace shaft sinking situation and coke guide track actual elevation during installation.Track should be straight not crooked, and backing plate should fill up tightly.The coke quenching cart track divides two sections, and the track of ballast aggregate section is installed on the sleeper, and the backing plate of pad special 3235 is connected and fixed with common railway spike between rail and the sleeper.The coke quenching cart track of CL1 ~ 12 sections is installed on the pre-embedded steel slab, U-shaped composite rubber mat plate of place mat under the rail of fastener for installing, the installing space of fastener is 600mm, and the bolt of rail clip, nut adopt stainless steel, and fastener is welded on the pre-embedded steel slab.
After above-mentioned track installs, carry out exothermic welding, exothermic welding mainly realizes by the aluminothermy chemical reaction.The aluminothermy chemical reaction is a redox reaction, utilizes reducing metal, metal oxide, ferroalloy and iron nail bits to be made into aluminum heat flux in proportion, and example wherein reducing metal, metal oxide for example can be aluminium and iron oxide.Aluminum heat flux is placed in the special crucible, light with high-temperature match, cause strong chemical reaction immediately, iron is reduced out in course of reaction, because iron is than the great crucible bottom that is sunken to, it is more frivolous in top that alumina changes into aluminum oxide slag, produces huge heat simultaneously, and the aluminothermy molten steel of high temperature pours in the sand mold that is buckled on the rail gap immediately, two rail ends are melted, casting metal itself as filling metal, gets up rail welding, as Fig. 4, Fig. 5 and shown in Figure 6 again.
Four big Car Tracks all adopt exothermic welding, during the exothermic welding welded rails, check the level that vertically reaches of track circuit earlier, the model of affirmation track and solder flux and rail match, loosening and remove rail gap both sides each 1-3 sleepers fastener and backing plate, track reserving gaps 26 ± 2 ㎜ check the whether straight and polishing of track end face.Be ready to sand mold, fix with clamp after installing sand mold, with crucible be placed on one dry local, check whether the welding agent bag has breakage or the phenomenon of making moist, high-temperature match is inserted solder flux end face center and makes fuse partly expose solder flux 3-5 millimeter height.Check gas, whether oxygen, propane gas is sufficient, and gas and track preheater are connected, and it lighted its flame of observation whether reach preheating requirement.
Measure and the temperature of record rail, if the rail temperature is lower than 15 ℃, uses welding gun 1 meter along about the soldering tip and respectively heated about 2 minutes, it is reached more than 30 ℃.Whether open propane and oxygen track is carried out preheating, it is consistent note to observe the flame of emerging at sand mold two rising heads rod place, and flame is emerged highly generally in 450 millimeter, the too high propane flammable gas valve that then reduces, too short increase propane flammable gas valve; If still do not reach requirement, to check that then source of the gas is whether sufficient, whether pipeline, preheater unimpeded, must be up to standard could preheating, track 8-9 preheating time minute.After reaching preheating time, put crucible immediately, light high-temperature match and pour into a mould solder flux.Begin when high-temperature match is lighted to clock, pour the back and withdrew crucible, sand mold jig in 3-4 minute, remove sand mold both sides, rail top and protrude unnecessary joint sealing mud, be convenient to push away knurl, place and push away the knurl machine, begin to push away knurl after 5-6 minute, postwelding began polishing in 20 minutes.The quality of strict control polishing is in order to avoid influence the operation of four carts.In the track welding process, personnel's arrangement is very important, can divide three groups, and every group of 2-3 people mainly is responsible for track adjustment and prefabricated sand mo(u)ld for first group; Be responsible for track heating and welding for second group; The 3rd group of recovery and the polishing of being responsible for track.Can accelerate the speed of track welding so greatly.
Plentiful light in good solder joint surface, do not have pore, slag inclusion, cut back its section pore-free in aggregates and flaw.The main reason that has influence on welding effect is moisture or aqueous vapor, because all may adsorption moisture in mould, welding powder and the soldered thing, therefore how to prevent or drives away aqueous vapor, the most significant steps that must take when being welding.Another factor that influences welding effect is the clean-up performance of mould and soldered thing, dust, grease, oxide or other attachment as soldered thing surface must be removed, just can carry out weld job after making its clean light, otherwise electric conductivity and the mechanical performance of the solder joint after the welding will be affected.If the residue of leaving in the mould is not exclusively removed, will cause the solder joint air spots sliding, brightless.The protection against the tide of solder flux and the cleaning of raceway surface are very heavy, must scrutiny before welding.In a word, the installation key of four big Car Tracks is center and absolute altitudes of control track, and the exothermic welding side is the temperature of control track heating, temperature is controlled well could be guaranteed the quality of welding.Should be used for the exothermic welding method of rail of coke oven mechanically moving track when carrying out the termination preheating, use preheater that preheating is carried out in the termination that is arranged in sand mold, during preheating, two the consistent 445-455 of being of flame height millimeters of emerging in rising head rod place in the sand mold, be 8-9 minute preheating time.Therefore stable control the temperature of termination heating, guaranteed better welding quality.

Claims (2)

1. an exothermic welding particular manufacturing craft that is applied to coke oven mechanically moving track is characterized in that: comprise sand mold (1) and crucible (6); Also be provided with the block (3) that is fixedly connected on the sand mold (1) in the sand mold (1), during use, block (3) is positioned at directly over the rail (4), between block (3) and the rail (4) space is arranged; Sand mold (1) is fixed on the rail (4) by clamp, the left and right two ends of the sand mold of sand mold (1) are by the sealing of joint sealing mud, make sand mold (1) inside form the chamber that opening (5) are arranged at top only, the termination of two rail (4) is positioned at chamber, and the both lateral sides of rail (4) does not contact with sand mold (1); Described opening (5) is used for the cast solder flux; Crucible (6) bottom is provided with sprue gate (7); During use, crucible (6) is positioned at directly over the sand mold (1), and sprue gate (7) face opening (5); Also be provided with the aluminum heat flux (2) suitable with rail (4) in the crucible (6); Aluminum heat flux (2) end face center is inserted with the high-temperature match that uses as fuse; The top of high-temperature match exceeds solder flux 3-5 millimeter.
2. the exothermic welding particular manufacturing craft that is applied to coke oven mechanically moving track according to claim 1 is characterized in that: described aluminum heat flux (2) comprises aluminium, iron oxide, ferroalloy and iron nail bits.
CN 201220648390 2012-11-30 2012-11-30 Special exothermic welding mold for coke oven mobile machine track Expired - Lifetime CN203045149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220648390 CN203045149U (en) 2012-11-30 2012-11-30 Special exothermic welding mold for coke oven mobile machine track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220648390 CN203045149U (en) 2012-11-30 2012-11-30 Special exothermic welding mold for coke oven mobile machine track

Publications (1)

Publication Number Publication Date
CN203045149U true CN203045149U (en) 2013-07-10

Family

ID=48728146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220648390 Expired - Lifetime CN203045149U (en) 2012-11-30 2012-11-30 Special exothermic welding mold for coke oven mobile machine track

Country Status (1)

Country Link
CN (1) CN203045149U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181023A (en) * 2016-08-22 2016-12-07 洛阳双瑞橡塑科技有限公司 A kind of rail aluminum weld running gate system
CN108889648B (en) * 2018-07-06 2021-01-08 安徽机电职业技术学院 Bridge crane track cleaning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181023A (en) * 2016-08-22 2016-12-07 洛阳双瑞橡塑科技有限公司 A kind of rail aluminum weld running gate system
CN108889648B (en) * 2018-07-06 2021-01-08 安徽机电职业技术学院 Bridge crane track cleaning device

Similar Documents

Publication Publication Date Title
CN103203538B (en) A kind of thermite welding method being applied to the rail of pusher machine/charging car/coke guide/coke-quenching vehicle track
CN101418535B (en) Construction method of monolithic road-bed in rail tunnel
CN102296495B (en) Long steel rail laying and welding construction process under conditions of large temperature differences and strong sandstorms
CN203045149U (en) Special exothermic welding mold for coke oven mobile machine track
CN111765768B (en) Refractory material masonry construction method for ignition holding furnace of sintering machine in sintering plant
CN205116029U (en) Pre -buried steel sheet adjusting device of breast
CN103192236B (en) Wharf ship loader telescoping mechanism rail production process and special rail butt joint tool thereof
CN108251585B (en) Method for ramming blast furnace hearth circumferential seam filler
CN103344119B (en) Method for maintaining heat-resisting cushion block of stepping type heating furnace
CN115386669B (en) Method for establishing triple hearth structure of blast furnace
CN114350873A (en) Blast furnace iron runner erosion line position determination method
CN210796513U (en) Blast furnace foundation gas leakage plugging structure
CN205119788U (en) Assembled tunnel cave
CN113462833A (en) Method for accurately building blast furnace carbon bricks
CN113668305B (en) Measuring and installing method for door type semi-door type tundish car track
CN112662861A (en) Heat treatment process after thermite welding of bainite steel rail
CN111472283A (en) Construction method and structural system for ensuring installation accuracy of steel box girder of cable-stayed bridge
CN111733643A (en) High-speed railway track precision measurement and track precision adjustment integrated construction method
CN203583301U (en) Construction structure for repairing tracks of bridge cranes by aid of epoxy cement gum
CN203200295U (en) Device for measuring zero position of oxygen lance of newly-built steelmaking converter
CN104060102B (en) A kind of large-scale flash smelting furnace installation method
CN105783516B (en) One kind 5,000,000 tons/a pellet firing machine installation methods
CN113358315B (en) Installation and construction method of large drop test platform
CN103590289B (en) Epoxy mortar repairs bridge crane track construction structure and construction method
CN214843895U (en) Large-scale drop test platform adopting ultra-thick plate