CN203044580U - Straightening device for ground anchor drill of power transmission line - Google Patents

Straightening device for ground anchor drill of power transmission line Download PDF

Info

Publication number
CN203044580U
CN203044580U CN 201220659495 CN201220659495U CN203044580U CN 203044580 U CN203044580 U CN 203044580U CN 201220659495 CN201220659495 CN 201220659495 CN 201220659495 U CN201220659495 U CN 201220659495U CN 203044580 U CN203044580 U CN 203044580U
Authority
CN
China
Prior art keywords
root posts
depression bar
base
earth anchor
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220659495
Other languages
Chinese (zh)
Inventor
王长虎
尉谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN 201220659495 priority Critical patent/CN203044580U/en
Application granted granted Critical
Publication of CN203044580U publication Critical patent/CN203044580U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A straightening device for a ground anchor drill of a power transmission line relates to a ground anchor drill straightening tool. The middle part and one end of a base (8) are respectively provided with two columns (6). Four columns equipped at the middle part and one end of the base are arranged quadrangularly. The upper ends of random two columns are connected. A pressure rod base (2) with a connecting shaft is provided above arc surfaces (10) of two columns at the middle part. Notches (1) which are equipped at the middle part of the lower surface of a straightening pressure rod (3) press the connecting shaft of the pressure rod base. The straightening pressure rod is provided with a handle (4). The other end of the straightening pressure rod is provided with an upward bending part (13). An upper hook (11) of a draw hook (12) is hanged on the upward bending part. The lower part of the draw hook is provided with a hook. According to the straightening device for the ground anchor drill of the power transmission line, a lever principle is used, and the bending part of the ground anchor drill is straightened by two persons easily. The straightening device for the ground anchor drill of the power transmission line is particularly suitable for straightening the ground anchor drill with a diameter which is smaller than 45MM, and realizes a purpose of quick straightening the ground anchor drill.

Description

Power transmission sequence earth anchor drilling coalignment
[technical field]
The utility model relates to a kind of earth anchor drilling alignment instrument, and specifically the utility model relates to a kind of power transmission sequence earth anchor drilling coalignment.
[background technology]
Known, earth anchor drilling is a large amount of a kind of bearings that use in the power transmission sequence construction, and commercially available earth anchor drilling primary structure is that top arranges annular handle, is straight-bar in annular handle bottom, and the Screw Anchor leaf is arranged on the lower end of straight-bar, and the straight-bar lower end is provided with tip; Insert ground by tip in the use, the rotary annular handle forces the Screw Anchor leaf to enter in the ground, uses the annular handle traction pole guy of straight-bar upper end at last; In transmission line of electricity carries out large repairs transformation process, a lot of situations all will use earth anchor drilling to fix, but after using at every turn, earth anchor drilling can occur bending and deformation phenomenon mostly, the crooked alignment tool of existing earth anchor drilling mainly is iron hammer, by artificial use iron hammer diastrophic earth anchor drilling is pounded directly, this method is not only dangerous but also waste time and energy, and makes troubles for the overhauling reform work of transmission line of electricity.
[summary of the invention]
In order to overcome the deficiency in the background technology, the utility model discloses a kind of power transmission sequence earth anchor drilling coalignment, described power transmission sequence earth anchor drilling coalignment utilizes lever principle, but just carries out alignment comparatively easily in the bending part of earth anchor drilling by two people.
The realization the technical solution of the utility model is as follows:
A kind of power transmission sequence earth anchor drilling coalignment, comprise base, column, the depression bar seat, the alignment depression bar, handle and drag hook, base middle part and wherein an end be respectively equipped with two root posts, described four root posts that are arranged on base middle part and an end are quadrangle and arrange, be arranged on the path that picks and places that neutral between two root posts of base one end forms earth anchor drilling, curved of neutral place between the two root posts upper end connection of neutral top and corresponding two root posts, neutral between two root posts at base middle part forms the path that picks and places of earth anchor drilling, the upper end of neutral top two root posts connects and the neutral between corresponding two root posts is set to arcwall face, and the arcwall face top of two root posts is provided with the depression bar seat with connecting axle at the middle part; The gap that the bottom surfaces middle part of alignment depression bar arranges is pressed on the connecting axle of depression bar seat, the handle of described alignment depression bar one end is in the other end top of base, the other end of alignment depression bar is provided with upwards bending, described upwards bending is in top between tetragonal four root posts of arranging, the top hook of drag hook hangs over upwards bending part, the drag hook bottom is provided with hook, and described hook hooks the alignment position of earth anchor drilling.
Described power transmission sequence earth anchor drilling coalignment, described depression bar seat is two risers arranged side by side, between two risers connecting axle is set, described connecting axle forms the spacing impetus of alignment depression bar bottom surfaces gap.
Described power transmission sequence earth anchor drilling coalignment, the gap that is arranged on alignment depression bar bottom surfaces is at least two.
Described power transmission sequence earth anchor drilling coalignment is respectively equipped with gusset plate in any side of four root posts of base middle part and an end.
By above-mentioned disclosure, the beneficial effects of the utility model are:
Power transmission sequence earth anchor drilling coalignment described in the utility model, utilize lever principle, alignment is carried out comparatively easily by two people in the bending part of earth anchor drilling, and the utility model especially adapts to the alignment of the following earth anchor drilling of diameter 45MM, has realized the purpose of quick alignment earth anchor drilling.
[description of drawings]
Fig. 1 is the structural representation that the utility model uses;
Fig. 2 is structural representation of the present utility model;
In the drawings: 1, gap; 2, depression bar seat; 3, alignment depression bar; 4, handle; 5, earth anchor drilling; 6, column; 7, gusset plate; 8, base; 9, neutral; 10, arcwall face; 11, hook; 12, drag hook; 13, upwards bending.
[specific embodiment]
Be further detailed below in conjunction with the utility model of embodiment; The following examples are not for restriction of the present utility model, and only as supporting to realize mode of the present utility model, any equivalent structure in technological frame disclosed in the utility model is replaced, and is protection domain of the present utility model;
Power transmission sequence earth anchor drilling coalignment described in 1 or 2 by reference to the accompanying drawings, comprise base 8, column 6, depression bar seat 2, alignment depression bar 3, handle 4 and drag hook 12, base 8 middle parts and wherein an end be respectively equipped with two root posts 6, one side of two root posts 6 is respectively equipped with gusset plate 7, described gusset plate 7 is triangle, one of them face of gusset plate 7 and column 6 welding, another face of gusset plate 7 and base 8 welding, described four root posts 6 that are arranged on base 8 middle parts and an end are quadrangle and arrange, be arranged on the path that picks and places that neutral 9 between two root posts 6 of base 8 one ends forms earth anchor drillings 5, curved 10 at neutral 9 places between the connection of two root posts, 6 upper ends, neutral 9 tops and corresponding two root posts 6, neutral 9 between two root posts 6 at base 8 middle parts forms the path that picks and places of earth anchor drilling 5, the upper end of neutral 9 tops two root posts 6 connects and the neutral 9 between corresponding two root posts 6 is set to arcwall face 10, arcwall face 10 tops of two root posts 6 are provided with the depression bar seat 2 with connecting axle at the middle part, described depression bar seat 2 is two risers arranged side by side, between two risers connecting axle is set, described connecting axle forms the spacing impetus of alignment depression bar 3 bottom surfaces gap 1; The gap 1 that the bottom surfaces middle part of alignment depression bar 3 arranges is pressed on the connecting axle of depression bar seat 2, described gap 1 is at least two, the handle 4 of described alignment depression bar 3 one ends is in the other end top of base 8, the other end of alignment depression bar 3 is provided with upwards bending 13, described upwards bending 13 is in top between tetragonal four root posts of arranging 6, the top hook 11 of drag hook 12 hangs over upwards bending 13 places, and drag hook 12 bottoms are provided with hook 11, and described hook 11 hooks the alignment position of earth anchor drilling 5.
Implement power transmission sequence earth anchor drilling coalignment described in the utility model, earth anchor drilling 5 is inserted by two neutrals 9 between the column 6, the top, both sides of earth anchor drilling 5 is withstood on the arcwall face 10 on two neutrals, 9 tops, people buttresses earth anchor drilling 5 and slams an end of base 8, another people slams the other end of base 8, the handle 4 of hand-held alignment depression bar 3 firmly presses down, lever force by 2 formation of depression bar seat, be provided with the upwards hook 11 at drag hook 12 two ends of bending 13 by being hooked in alignment depression bar 3 other ends, force earth anchor drilling 5 bending part alignments.
The utility model does not describe part in detail and is prior art.

Claims (4)

1. power transmission sequence earth anchor drilling coalignment, comprise base (8), column (6), depression bar seat (2), alignment depression bar (3), handle (4) and drag hook (12), it is characterized in that: base (8) middle part and wherein an end be respectively equipped with two root posts (6), described four root posts (6) that are arranged on base (8) middle part and an end are quadrangle and arrange, be arranged on the path that picks and places that neutral (9) between two root posts (6) of base (8) one ends forms earth anchor drilling (5), neutral (9) between the connection of neutral (9) top two root posts (6) upper end and corresponding two root posts (6) is located curved (10), neutral (9) between two root posts (6) at base (8) middle part forms the path that picks and places of earth anchor drilling (5), the upper end of neutral (9) top two root posts (6) connects and the neutral (9) between corresponding two root posts (6) is set to arcwall face (10), and arcwall face (10) top of two root posts (6) is provided with the depression bar seat (2) with connecting axle at the middle part; The gap (1) that the bottom surfaces middle part of alignment depression bar (3) arranges is pressed on the connecting axle of depression bar seat (2), the handle (4) of described alignment depression bar (3) one ends is in the other end top of base (8), the other end of alignment depression bar (3) is provided with upwards bending (13), described upwards bending (13) is in top between tetragonal four root posts of arranging (6), the top hook (11) of drag hook (12) hangs over upwards bending (13) and locates, and drag hook (12) bottom is provided with hook (11).
2. power transmission sequence earth anchor drilling coalignment according to claim 1, it is characterized in that: described depression bar seat (2) is two risers arranged side by side, between two risers connecting axle is set, described connecting axle forms the spacing impetus of alignment depression bar (3) bottom surfaces gap (1).
3. power transmission sequence earth anchor drilling coalignment according to claim 1 and 2, it is characterized in that: the gap (1) that is arranged on alignment depression bar (3) bottom surfaces is at least two.
4. power transmission sequence earth anchor drilling coalignment according to claim 1 is characterized in that: any side at four root posts (6) of base (8) middle part and an end is respectively equipped with gusset plate (7).
CN 201220659495 2012-12-05 2012-12-05 Straightening device for ground anchor drill of power transmission line Expired - Fee Related CN203044580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220659495 CN203044580U (en) 2012-12-05 2012-12-05 Straightening device for ground anchor drill of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220659495 CN203044580U (en) 2012-12-05 2012-12-05 Straightening device for ground anchor drill of power transmission line

Publications (1)

Publication Number Publication Date
CN203044580U true CN203044580U (en) 2013-07-10

Family

ID=48727578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220659495 Expired - Fee Related CN203044580U (en) 2012-12-05 2012-12-05 Straightening device for ground anchor drill of power transmission line

Country Status (1)

Country Link
CN (1) CN203044580U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103537514A (en) * 2013-09-29 2014-01-29 湖南恒岳重钢钢结构工程有限公司 H-shaped steel correcting device and using method
CN103599969A (en) * 2013-10-29 2014-02-26 格林精密部件(苏州)有限公司 Torsion bar straightening tool
CN106391765A (en) * 2016-11-17 2017-02-15 青海送变电工程公司 Pressure joint pipe correcting device and purpose
CN115318883A (en) * 2022-10-13 2022-11-11 四川华体照明科技股份有限公司 Straightening equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103537514A (en) * 2013-09-29 2014-01-29 湖南恒岳重钢钢结构工程有限公司 H-shaped steel correcting device and using method
CN103599969A (en) * 2013-10-29 2014-02-26 格林精密部件(苏州)有限公司 Torsion bar straightening tool
CN103599969B (en) * 2013-10-29 2016-11-23 格林精密部件(苏州)有限公司 Torque arm alignment frock
CN106391765A (en) * 2016-11-17 2017-02-15 青海送变电工程公司 Pressure joint pipe correcting device and purpose
CN115318883A (en) * 2022-10-13 2022-11-11 四川华体照明科技股份有限公司 Straightening equipment
CN115318883B (en) * 2022-10-13 2022-12-20 四川华体照明科技股份有限公司 Straightening equipment

Similar Documents

Publication Publication Date Title
CN203044580U (en) Straightening device for ground anchor drill of power transmission line
CN203626366U (en) Bracing wire back binding fastening tool
CN203265322U (en) Drill pipe straightening device
CN103259213A (en) Puller for wiring pile
CN202888418U (en) Portable self-tapping grounding pin
CN204108966U (en) Boring device of top plate
CN203289001U (en) Wiring pile extractor
CN201125387Y (en) Middle beam pad iron assembly in anchor rod construction
CN203960920U (en) Colliery minery electric power pylon inclination adjusting device
CN207040156U (en) Construction labour saving shovel
CN102832564B (en) A kind of extracting apparatus of rod power ground
CN101797604B (en) Flat iron bending machine
CN202925911U (en) Vertical pre-stress rib tensioning auxiliary tool
CN203170374U (en) Fall block of simple rock smasher
CN202249107U (en) Wire taking hook special for assembling electric pole
CN211342742U (en) Operating pedal is prevented to oil recovery well college of ascending a university
CN204385716U (en) A kind of portable manually extracts light-duty cone penetrometer
CN204912601U (en) Pile head bar straightening spanner
CN204150923U (en) A kind of track lifting appliance
CN203356487U (en) Steel wire straightening device
CN204160094U (en) A kind of lift-on/lift-off type steel column welded top positioner
CN204118942U (en) A kind of water injection pump motor mobile device
CN203401104U (en) Beam slab bottom drilling tool
CN201695702U (en) Special concrete block fixture
CN206869756U (en) A kind of embedded bar end of easy operation is by curved straightening spanner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130710

Termination date: 20131205