CN203035255U - Double-skip inclined shaft bottom ore loading device - Google Patents
Double-skip inclined shaft bottom ore loading device Download PDFInfo
- Publication number
- CN203035255U CN203035255U CN 201320038882 CN201320038882U CN203035255U CN 203035255 U CN203035255 U CN 203035255U CN 201320038882 CN201320038882 CN 201320038882 CN 201320038882 U CN201320038882 U CN 201320038882U CN 203035255 U CN203035255 U CN 203035255U
- Authority
- CN
- China
- Prior art keywords
- skip
- ore deposit
- shaft
- inclined shaft
- ore loading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Carbon Steel Or Casting Steel Manufacturing (AREA)
Abstract
The utility model discloses a double-skip inclined shaft bottom ore loading device which comprises two skips, wherein an ore loading section track is arranged at an inclined shaft bottom. The ore loading section track is alternately connected with two operating tracks of the two skips through a turnout. An inclined shaft which is arranged above a skip loading position of the ore loading section track is connected with a jack shaft, and a set of ore loading device is fixed at the bottom of the jack shaft. The skips conduct up-down operation along the ore loading section tracks and operating tracks of the skips. Ore loading of the two skips of the inclined shaft can be conducted only through a section of jack shaft and the set of ore loading device. The double-skip inclined shaft bottom ore loading device has the main advantages of being capable of saving the section of jack shaft and the set of ore loading device, reducing construction work amount, reducing investment of capital construction, shortening construction period, enabling a mine to be put in production as quickly as possible, and creating good economic benefits.
Description
Technical field
The utility model relates to a kind of dress ore deposit equipment, particularly dress ore deposit, a kind of double-loop pattern inclined shaft shaft bottom equipment.
Background technology
When inclined shaft year 30~600,000 tons of lifting capacitys, inclined shaft skip dress ore deposit can be considered to adopt in the inclined shaft inclination angle in the time of 20 °~35 °.Skip bucket dress ore deposit equipment is mechanization system, speed of service height, good stability, security of operation.Inclined shaft skip adopts the double hook Hoisting System more, and 2 skip buckets are along orbital motion separately in the inclines, and when 1 skip bucket loaded in the shaft bottom, 1 skip bucket unloaded at well head in addition.As shown in Figure 1, dress ore deposit in double-loop pattern inclined shaft shaft bottom normally disposes 2 suit ore deposit devices and gives 2 skip bucket dress ore deposits respectively in the shaft bottom.This mode 2 sections drop shafts of need constructing are arranged 1 suit ore deposit device respectively every section drop shaft bottom.This configuration mode construction works amount is big, construction period lengthens, increased investment, under underground weak-walled situation, has increased difficulty of construction especially.Therefore be necessary dress ore deposit, existing double-loop pattern inclined shaft shaft bottom mode is improved.
Summary of the invention
Technical problem to be solved in the utility model is at the prior art deficiency, to provide dress ore deposit, a kind of double-loop pattern inclined shaft shaft bottom equipment, minimizing construction works amount and difficulty of construction, shortening construction period.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: dress ore deposit, a kind of double-loop pattern inclined shaft shaft bottom equipment, comprise two skip buckets, described inclined shaft shaft bottom is provided with dress ore deposit section track, and described dress ore deposit section track alternately is connected with two orbits of described two skip buckets by a track switch; Described drop shaft is connected by the dress ore deposit device that is fixed on described drop shaft bottom with described inclined shaft; Described skip bucket moves up and down along described dress ore deposit section track and orbit separately.
As preferred version, described track switch is electronic bilateral turnout, and described electronic bilateral turnout is provided with electrically operated derailleur; Described skip bucket orbit is provided with detector.
Characteristics according to the double-loop pattern inclined shaft hoisting, the i.e. different fashionable dresses of two skip buckets ore deposits, when 1 skip bucket loads in the shaft bottom, in addition 1 skip bucket is in the characteristics of well head unloading, by arranging 1 electronic bilateral turnout between dress ore deposit section track and two skip buckets (i.e. 1, No. 2 skip bucket) orbit at the bottom of the skip shaft, make that adorning ore deposit section track at the bottom of the skip shaft is connected with No. 1 or No. 2 skip bucket orbits.When adorning the ore deposit at the bottom of No. 1 skip shaft, electronic bilateral turnout is adorned ore deposit section track and No. 1 skip bucket orbit at the bottom of connecting skip shaft, when finish in No. 1 skip bucket dress ore deposit, upwards operation is by behind the electronic bilateral turnout, the up signalizing activity that passes through of No. 1 skip bucket that electronic bilateral turnout sends according to detector, adorn ore deposit section track and No. 2 skip bucket orbits at the bottom of transferring the connection skip shaft to, for getting ready in No. 2 descending skip buckets dress ore deposits.
Compared with prior art, the beneficial effect that the utility model has is: the utility model only needs 1 section drop shaft, 1 suit ore deposit device just can give two inclined shaft skip dress ore deposits, its topmost advantage is to save 1 section drop shaft and 1 suit ore deposit device, can reduce the construction works amount, reduce capital investment, shorten construction period, can be put into production as early as possible in the mine, create good economic benefit.
Description of drawings
Fig. 1 is dress ore deposit, traditional double skip bucket inclined shaft shaft bottom equipment vertical view;
Fig. 2 is the utility model one embodiment vertical view;
Fig. 3 is the utility model one embodiment front view.
The specific embodiment
As shown in Figures 2 and 3, the utility model one embodiment comprises two skip buckets 9, is provided with dress ore deposit section track 3 in the described inclined shaft, and two orbits 6 of described dress ore deposit section track 3 by an electronic bilateral turnout 4 and described two skip buckets, one of 7 are connected; On the described skip bucket orbit 6,7 detector 5 is housed respectively, after the detector on No. 1 skip bucket orbit 6 detects No. 1 up passing through of skip bucket, send signal and give electronic bilateral turnout, bilateral turnout changes, transfer to and connect skip bucket dress ore deposit section track and No. 2 skip bucket orbits 7, make No. 2 descending skip buckets can enter skip bucket dress ore deposit section track.On the contrary, when the detector on No. 2 skip bucket orbits 7 detect No. 2 skip buckets up by after send signal and give electronic bilateral turnout, bilateral turnout changes, and transfers to connecting skip bucket dress ore deposit section track and No. 1 skip bucket orbit 6.The inclined shaft of top, section track 3 skip loading positions, described dress ore deposit is connected with a drop shaft 1, and a suit ore deposit device 2 is fixedly arranged at described drop shaft 1 bottom, and described drop shaft is connected by the dress ore deposit device that is fixed on described drop shaft bottom with described inclined shaft; Described skip bucket moves up and down along described dress ore deposit section track 3 and orbit separately.
Dress ore deposit device is installed in the drop shaft bottom, is used for to skip bucket dress ore deposit, and can be that vibration ore dumping machine also can be to the ore deposit gate.
Electronic bilateral turnout is provided with electrically operated derailleur 8, electrically operated derailleur 8 bases
The signalizing activity that detector 5 sends makes track switch connect the orbit of skip bucket dress ore deposit section track and No. 1 skip bucket or No. 2 skip buckets.
After No. 1 skip bucket goes downwards to dress section track 3 skip loading positions, ore deposit, shaft bottom, skip bucket stops descending, dress ore deposit device 2 is opened, with the ore of 1 li of the drop shaft skip bucket of packing into No. 1, dress ore deposit device 2 was closed after No. 1 skip bucket was filled ore, it is up that No. 1 skip bucket begins, and low speed jerking motion continues upwards to run to No. 1 skip bucket orbit 6 with normal speed after by electronic bilateral turnout 4 again.When detecting No. 1 skip bucket, No. 1 up detector 5 of skip bucket upwards sends signal after the operation, electrically operated derailleur is controlled electronic bilateral turnout 4 actions, skip bucket is adorned ore deposit section track 3 be connected with No. 2 skip bucket orbits 7, be convenient to No. 2 descending skip buckets and enter skip bucket dress ore deposit section track 3 by electronic bilateral turnout 4.After No. 2 skip buckets go downwards to dress section track 3 skip loading positions, ore deposit, shaft bottom, skip bucket stops descending, dress ore deposit device 2 is opened, with the ore of 1 li of the drop shaft skip bucket of packing into No. 2, dress ore deposit device 2 was closed after No. 2 finished in skip bucket dress ore deposit, No. 2 upwards operations of skip bucket, when detecting No. 2 skip buckets, the up detector 5 on No. 2 skip bucket orbits upwards sends signal after the operation, electrically operated derailleur is controlled electronic bilateral turnout 4 actions, skip bucket is adorned ore deposit section track be connected with No. 1 skip bucket track, get ready for No. 1 descending skip bucket enters dress ore deposit, shaft bottom section track 3.So go round and begin again, realized that 1 drop shaft, 1 suit ore deposit device are to two inclined shaft skips dress ore deposits.
Claims (2)
1. dress ore deposit, double-loop pattern inclined shaft shaft bottom equipment comprises two skip buckets, it is characterized in that, described inclined shaft shaft bottom is provided with dress ore deposit section track, and described dress ore deposit section track alternately is connected with two orbits of described two skip buckets by a track switch; Top, section track skip loading position, described dress ore deposit is provided with a drop shaft, and described drop shaft is connected by the dress ore deposit device that is fixed on described drop shaft bottom with described inclined shaft; Described skip bucket moves up and down along described dress ore deposit section track and orbit separately.
2. dress ore deposit, double-loop pattern inclined shaft shaft bottom according to claim 1 equipment is characterized in that described track switch is electronic bilateral turnout, and described electronic bilateral turnout is provided with electrically operated derailleur, and described skip bucket orbit is provided with detector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320038882 CN203035255U (en) | 2013-01-24 | 2013-01-24 | Double-skip inclined shaft bottom ore loading device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320038882 CN203035255U (en) | 2013-01-24 | 2013-01-24 | Double-skip inclined shaft bottom ore loading device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203035255U true CN203035255U (en) | 2013-07-03 |
Family
ID=48687388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320038882 Expired - Fee Related CN203035255U (en) | 2013-01-24 | 2013-01-24 | Double-skip inclined shaft bottom ore loading device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203035255U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109533842A (en) * | 2018-12-19 | 2019-03-29 | 远安县燎原矿业有限责任公司 | A kind of drop shaft formula ore storage bin automatic assembling and disassembling system and handling method |
-
2013
- 2013-01-24 CN CN 201320038882 patent/CN203035255U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109533842A (en) * | 2018-12-19 | 2019-03-29 | 远安县燎原矿业有限责任公司 | A kind of drop shaft formula ore storage bin automatic assembling and disassembling system and handling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201810342U (en) | Dump crane | |
CN104653182B (en) | A kind of coal-mining method that the bastard coal of coal seam containing thick dirt band point is adopted | |
CN201496069U (en) | Bridge type transfer machine with large span | |
CN203035255U (en) | Double-skip inclined shaft bottom ore loading device | |
CN105821775A (en) | Construction method for using cable crane for overturning arch bridge arch rib | |
CN102619242A (en) | Flat-pushing type flat bucket material discharging mechanism | |
CN207209790U (en) | A kind of cantilever crane of stable operation | |
CN202788899U (en) | Large-swing beam structured top coal caving hydraulic support | |
CN203531952U (en) | Skip bucket well ore rock separate-loading and separate-carrying system | |
CN104500072B (en) | Mineral transport automatic butt joint system | |
CN201486593U (en) | Inclined well slag digging machine | |
CN201627596U (en) | Transverse self-advancing combined suspension hydraulic support | |
CN105923541B (en) | The handling apparatus and rock tunnel(ling) machine of rock tunnel(ling) machine | |
CN201416458Y (en) | Slag-raking machine of slant well | |
CN107686012A (en) | A kind of conveying device | |
CN205078302U (en) | Scrape board -like waste rock conveyor under skip shaft | |
CN205820665U (en) | Underground mine vertical shaft bottom-dump skip promotes system | |
CN203476334U (en) | Self-moving type transshipping machine for mining working face for open-pit mine | |
CN207332878U (en) | Slusher machine is unloaded goods device | |
CN201416456Y (en) | Slag-raking machine of slant well | |
CN203685189U (en) | Working face tower type transfer conveyor for an open-pit mine | |
CN109823868A (en) | A kind of coal mine twin-skip divides storage system automatically | |
CN207451030U (en) | A kind of multiple spot for mine multi-rope friction hoisting vertical shaft fills ore deposit ore discharging apparatus | |
CN202768002U (en) | Large dip angle rail slope structure for assisting main tunnel construction | |
CN204802849U (en) | Hang hopper mode device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130703 Termination date: 20200124 |
|
CF01 | Termination of patent right due to non-payment of annual fee |