CN203035102U - Open hole horizontal well segmentation multi-cluster even acidification tubular column - Google Patents

Open hole horizontal well segmentation multi-cluster even acidification tubular column Download PDF

Info

Publication number
CN203035102U
CN203035102U CN 201320030371 CN201320030371U CN203035102U CN 203035102 U CN203035102 U CN 203035102U CN 201320030371 CN201320030371 CN 201320030371 CN 201320030371 U CN201320030371 U CN 201320030371U CN 203035102 U CN203035102 U CN 203035102U
Authority
CN
China
Prior art keywords
sliding sleeve
ball seat
horizontal well
many bunches
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201320030371
Other languages
Chinese (zh)
Inventor
何志勇
贾红战
李军
冯强
李青一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN 201320030371 priority Critical patent/CN203035102U/en
Application granted granted Critical
Publication of CN203035102U publication Critical patent/CN203035102U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an open hole horizontal well segmentation multi-cluster even acidification tubular column. Based on the current technology of open hole horizontal well segmentation acidification, ball throwing open type multi-cluster sliding sleeves are introduced, namely a plurality of groups of multi-cluster sliding sleeves are arranged in each packed section, a ball is threw in, all the multi-cluster sliding sleeves in one packed section can be opened step by step, and meanwhile a standard ball throwing open type sliding sleeve is matched to be used to achieve the purpose of supplying multipoint liquid inlet channels. The open hole horizontal well segmentation multi-cluster even acidification tubular column is a novel technology to conduct acidification and plug removal to a horizontal well, through combined using of the multi-cluster sliding sleeves and the standard ball throwing open type sliding sleeve, acid liquid is enabled to be evenly distributed and acidized in a horizontal well section, the problems of oil well plugging and pollution are completely solved, the condition of seepage of the horizontal well is improved, and the production capacity of an oil well is improved.

Description

Many bunches of homogeneous acidification tubing strings of open-hole horizontal well segmentation
Technical field
The utility model belongs to open-hole horizontal well subsection acidizing technical field, is specifically related to many bunches of homogeneous acidification tubing strings of a kind of open-hole horizontal well segmentation.
Background technology
Open-hole horizontal well subsection acidizing technology is that completion technique and Acidizing Technology are organically combined, form one-trip string and realize completion and two kinds of techniques of acidifying transformation, enter the well casing post both as completion tubular column, simultaneously also as the acidifying tubing string, reduce construction cost, do not carried out three and open well cementation and perforating job, improved greatly the completion practice time, and three open and do not carry out well cementing operation, effectively solved the ropy problem of horizontal cementing.Yet, during to horizontal well long well section Reservoir Acidization, full well section uniform acid distribution and acid discharge are the difficult points of acidifying.
Above-mentioned technique can accurately be controlled and inject each interval liquid measure, its weak point is: to longer compartmented, due to the liquid outlet restricted number, concentrate cloth acid position, and acid solution can not be according to the even target approach interval of designing requirement, and hyper acid, corrosion is excessive in the local location suction, easily cause reservoir to cave in, too much acid amount must cause the row's of returning difficulty simultaneously, thereby causes the secondary injury of reservoir, reduces acidizing effect.
Summary of the invention
The technical problems to be solved in the utility model is to provide many bunches of homogeneous acidification tubing strings of a kind of open-hole horizontal well segmentation, and the utility model by the feed liquor de-plugging simultaneously of the multiple spot in single packing section, reaches the purpose of oil gas high-efficiency mining in acidization.
In order to solve the problems of the technologies described above, many bunches of homogeneous acidification tubing strings of open-hole horizontal well segmentation of the present utility model, comprise sleeve pipe, be arranged in the oil pipe of inside pipe casing, several acidizing treatment sections that are connected with oil pipe and set gradually and the first acidizing treatment section that is connected and is positioned at the sleeve pipe afterbody with last acidizing treatment section, between described sleeve pipe and oil pipe, be provided with for the hanger on internal surface of sleeve pipe and for the insertion of Sealed casing pipe and oil pipe sealing by oil pipe suspension, described the first acidizing treatment section comprises the packer set gradually, opened by pressure formula sliding sleeve, between setting ball seat and float shoe and above-mentioned each parts, by tubing nipple, connect, each described acidizing treatment section comprises the first packer set gradually, several many bunches of sliding sleeves, relief valve, between standard pitching open-type sliding sleeve and the second packer and above-mentioned each parts, by tubing nipple, connect, described several many bunches of sliding sleeves, circumferentially be respectively equipped with some liquid outlets on the outer tube wall of standard pitching open-type sliding sleeve and opened by pressure formula sliding sleeve, be equipped with one in each described liquid outlet and still can guarantee in oil pipe to keep certain pressure after sliding sleeve is opened 'sjam, and each described temporary jam temporarily is pressed in liquid outlet by a temporarily stifled gland.
Each described many bunches of sliding sleeve includes urceolus, described urceolus upper end is formed with internal thread, lower end is formed with external screw thread, should circumferentially be evenly equipped with a plurality of liquid outlets in outer drum outer wall top, each described many bunches of sliding sleeve also comprises inner sliding sleeve, the combination ball seat, guider, expander, upper press cover, lower cover and ball, described inner sliding sleeve is arranged on outer tube inner wall by shear pin, this inner sliding sleeve middle part circumferentially is evenly equipped with a plurality of square holes, in each described square hole, correspondence is equipped with a ball seat body, the described combination ball seat of the involutory formation of each described ball seat body, described combination ball seat upper inside wall is formed with short inclined-plane, bottom is formed with long inclined-plane, described combination ball seat upper end is provided with guider, lower end is provided with expander, described guider is that an annular solid and its inwall are formed with one for the annular slope by ball guiding combination place, the short inclined-plane of ball seat, described guider upper end is provided with upper press cover, described upper press cover is threaded in the inner sliding sleeve upper inside wall, this upper press cover one end withstands on the upper end of guider and guider is pressed on the combination ball seat, described expander outer wall top is formed with the front end inclined-plane of an annular, bottom and the laminating of lower cover inwall, the laminating of Yu Chang inclined-plane, described front end inclined-plane, described lower cover is threaded in inner sliding sleeve inwall bottom, be provided with a spring between this lower cover and expander, on described outer tube inner wall and be positioned at combination ball seat below and be formed with an annular opening groove be complementary with the combination ball seat.
Described liquid outlet upper end and between inner sliding sleeve and outer tube inner wall, shear pin lower end and be equipped with sealing ring between inner sliding sleeve and outer tube inner wall and between guider and inner sliding sleeve.
Described inner sliding sleeve upper and lower end is equipped with a holding screw, and two described holding screws all withstand on respectively on the flank of upper and lower gland through inner sliding sleeve.
A kind of acidization tool of realizing by many bunches of homogeneous acidification tubing strings of above-mentioned open-hole horizontal well segmentation comprises the following steps:
1) after the Open-Hole Section finishing drilling, through drifting, scraping and simulation tubing string drifting operation, guarantee that well is smooth, for being lowered to completion acidifying tubing string, carry out the pit shaft preparation;
2) be lowered to completion acidifying tubing string with drilling rod;
3) replace the interior all mud of pit shaft to slurry tank, until import and export aqueous solution performance is consistent with the KCl aqueous solution;
4) after having replaced mud, throw the setting ball of low-density to setting ball seat place, put in place with cement truck pumping ball, pressurization in drilling rod, setting the first packer, the second packer, packer and hanger;
5) after setting completing, continue rising pressure in drilling rod, put hanger aside, above carry drilling rod, suppress in drilling rod, the sealing of check hanger, voltage stabilizing, after pressure drop is qualified, trip out drilling rod;
6) lower insertion sealing device, the tieback oil pipe, to well head, completes the acidizing treatment tubing string, and carries out the envelope of testing of tieback string;
7) after testing the involution lattice, not pressure release of sleeve pipe, in oil pipe, opened by pressure formula sliding sleeve is opened in pressurization, and closing well is waited for acidizing treatment;
8), after the fracturing unit truck group is put, connected, ground high pressure line pressure testing, can carry out acidizing treatment after qualified;
9) carry out the acidizing treatment of the first acidizing treatment section according to acidifying infusion program infusion acid solution;
10) after the first acidizing treatment section I acidifying completes, start to carry out the acidizing treatment of its last layer acidizing treatment section II, pitching is also used the clear water pumping, after the ball seat in ball falls into many bunches of sliding sleeves of the first order of this construction section, pressurization, open many bunches of sliding sleeves of the first order, ball continues to come downwards on the ball seat of many bunches of sliding sleeves of next stage, clear water constantly pumps into, the oil pipe internal pressure raises, open many bunches of sliding sleeves of next stage, and open successively many bunches of more multistage sliding sleeves of back, end bulb is fallen on the ball seat of standard pitching open-type sliding sleeve through relief valve, in oil pipe, standard pitching open-type sliding sleeve is opened in pressurization, now in oil pipe, pressurize and open relief valve again, pump into acid solution again in oil pipe, acid solution enters stratum packing section from the liquid outlet of several many bunches of sliding sleeves and standard pitching open-type sliding sleeve in this layer of acidizing treatment section simultaneously, the multiple spot simultaneously cloth acid of realization to this packing section, carrying out along with acid etching, the temporary bridging structure of each sliding sleeve liquid outlet is dissolved by acid etching, liquid outlet is opened fully, its metering function is removed,
11) application and above-mentioned steps 10) same job practices, complete more the acidizing treatment section III of last layer and the acidizing treatment of follow-up more multi-layered section;
12) after the acidizing treatment section all completes many bunches of homogeneous acidifications of segmentation, closing well 30-60min, Demolition Construction equipment and pipeline, the mounted well head of conducting, open flow, drainage system start the row of returning, and the PH that returns discharge opeing requires to reach more than 5 and enters the formation testing system and asked product, if in open flow discharge opeing process stop-spraying, need to adopt the nitrogen gaslift to assist discharge opeing, until return the PH of discharge opeing, reach requirement and can be asked product.
The utility model is horizontal well to be carried out to a kind of new technology of acidification to dispel block, by being used in combination many bunches of sliding sleeves and standard pitching open-type sliding sleeve, make that acid solution is uniformly distributed at net horizontal section, homogeneous acidification, fully solved the problem that oil well stops up and pollutes, improve the Horizontal Well Flow situation, improved the production capacity of oil well.
The accompanying drawing explanation
The structure diagram that Fig. 1 is many bunches of current limliting fracturing strings of open-hole horizontal well;
The structure diagram that Fig. 2 is first embodiment of the present utility model;
Fig. 3 is that the structure of many bunches of sliding sleeves is cutd open figure;
Fig. 4 be Fig. 3 many bunches of sliding sleeves under closure state A-A to sectional view;
Fig. 5 be Fig. 3 many bunches of sliding sleeves under opening A-A to sectional view.
In figure: 1. insert sealing, 2. hanger, 3. packer, 4. many bunches of sliding sleeves, 5. relief valve, 6. standard pitching open-type sliding sleeve, 7. opened by pressure formula sliding sleeve, 8. setting ball seat, 9. sleeve pipe, 10. oil pipe, 101. urceolus, 102. upper press covers, 103. sealing ring, 104. holding screws, 105. temporarily stifled glands, 106. temporary jam, 107. shear pins, 108. inner sliding sleeves, 109. liquid outlet, 110. guiders, 111. balls, 112. combination ball seat, 113. opening groove, 114. springs, 115. ball seat bodies, 116. lower cover, 117. expanders.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
Referring to Fig. 1 and Fig. 3, many bunches of homogeneous acidification tubing strings of open-hole horizontal well segmentation of the present utility model, comprise sleeve pipe 9, be arranged in the oil pipe 10 of sleeve pipe 9 inside, several acidizing treatment section II/III that are connected with oil pipe 10 and set gradually and the first acidizing treatment section I that is connected and is positioned at sleeve pipe 9 afterbodys with last acidizing treatment section II, between described sleeve pipe 9 and oil pipe 10, be provided with for oil pipe 10 being suspended on to hanger 2 and the insertion sealing 1 with oil pipe 10 for Sealed casing pipe 9 on sleeve pipe 9 inwalls, described the first acidizing treatment section I comprises the packer 3e set gradually, opened by pressure formula sliding sleeve 7, between setting ball seat 8 and float shoe and above-mentioned each parts, by tubing nipple, connect, each described acidizing treatment section II/III comprises the first packer 3c/3a set gradually, several many bunches of sliding sleeve 4b/4a, relief valve 5b/5a, between standard pitching open-type sliding sleeve 6b/6a and the second packer 3d/3b and above-mentioned each parts, by tubing nipple, connect, wherein the installation quantity of many bunches of sliding sleeves can be according to length and the acidification technique requirements set of compartmented.
Circumferentially be respectively equipped with some liquid outlets 109 on the outer tube wall of described several many bunches of sliding sleeve 4a, 4b, standard pitching open- type sliding sleeve 6a, 6b and opened by pressure formula sliding sleeve 7, be equipped with one in each described liquid outlet 109 and still can guarantee the interior maintenance certain pressure of oil pipe 10 after sliding sleeve is opened 's temporary jam 106, each described temporary jam 106 middle part all is formed with a tiny micropore and so temporary bridging structure has metering function, can guarantee to maintain certain pressure in oil pipe 10, each described temporary jam 106 is pressed in liquid outlet 109 by a temporarily stifled gland 105.
The opening pressure value of relief valve 5a/5b is higher than the force value of opening many bunches of sliding sleeve 4a/4b and standard pitching open-type sliding sleeve 6a/6b, it act as: one, prevent pit shaft internal pressure moment surge in many bunches of sliding sleeve 4a/4b and standard pitching open-type sliding sleeve 6a/6b opening process, with protection pipe string and ground construction safety; Two, after all sliding sleeves are opened, before to oil pipe, injecting acid solution, by opened by pressure relief valve 5a/5b, can accelerate the acid solution displacement velocity, save the engineering time.Be lowered to many bunches of sliding sleeve 4a/4b in each construction section, when relief valve 5a/5b and standard pitching open-type sliding sleeve 6a/6b, pitching is annotated the clear water pressurization and is first opened many bunches of sliding sleeve 4a/4b, ball arrives standard pitching open-type sliding sleeve 6a/6b place by relief valve 5a/5b subsequently, continue pressurization opening standard pitching open-type sliding sleeve 6a/6b, now due to the relief valve design pressure lower than the sliding sleeve opening pressure, relief valve is still in closed condition, acidizing treatment starts the rear acid fluid system that first adopts large discharge capacity to inject design and enters pipe string displacement clear water, now because acid filling pressure is greater than the relief valve design pressure, relief valve is in opening, with the clear water in prestissimo displacement pipe string, make acid fluid system arrive many bunches of sliding sleeve 4a/4b and standard pitching open-type sliding sleeve 6a/6b place.In order to guarantee that the molten temporary jam of acid fluid system and the acid at sliding sleeve place can react fully, when acid fluid system arrives many bunches of sliding sleeve 4a/4b and standard pitching open-type sliding sleeve 6a/6b place, reduce discharge capacity, the pipe string internal differential pressure reduces, now relief valve cuts out, acid fluid system is fully reacted with the molten temporary jam of the acid at sliding sleeve place, and all sliding sleeve fluid holes are opened fully.In acidizing treatment process subsequently, because relief valve 5a/5b and standard pitching open-type sliding sleeve 6a/6b are close to, no matter so relief valve 5a/5b whether open the effect that can not affect uniform acid distribution.
Referring to Fig. 3 to Fig. 5, each described many bunches of sliding sleeve 4a, 4b includes urceolus 101, described urceolus 101 upper ends are formed with internal thread, lower end is formed with external screw thread, these urceolus 101 outer wall tops circumferentially are evenly equipped with a plurality of liquid outlets 109, each described many bunches of sliding sleeve 4a, 4b also comprises inner sliding sleeve 108, combination ball seat 112, guider 110, expander 117, upper press cover 102, lower cover 116 and ball 111, described inner sliding sleeve 108 is arranged on urceolus 101 inwalls by shear pin 107, these inner sliding sleeve 108 middle parts circumferentially are evenly equipped with a plurality of square holes, in each described square hole, correspondence is equipped with a ball seat body 115, the described combination ball seat 112 of the involutory formation of each described ball seat body 115, described combination ball seat 112 upper inside wall are formed with short inclined-plane, bottom is formed with long inclined-plane, described combination ball seat 112 upper ends are provided with guider 110, lower end is provided with expander 117, described guider 110 is that an annular solid and its inwall are formed with one for the annular slope by ball 111 guiding combination places, the short inclined-plane of ball seat 112, described guider 110 upper ends are provided with upper press cover 102, described upper press cover 102 is threaded in inner sliding sleeve 108 upper inside wall, these upper press cover 102 1 ends withstand on the upper end of guider 110 and guider 110 are pressed on combination ball seat 112, described expander 117 outer wall tops are formed with the front end inclined-plane of an annular, bottom and lower cover 116 inwall laminatings, the laminating of Yu Chang inclined-plane, described front end inclined-plane, described lower cover 116 is threaded in inner sliding sleeve 108 inwall bottoms, be provided with a spring 114 between this lower cover 116 and expander 117, on described urceolus 101 inwalls and be positioned at combination ball seat 112 belows be formed with one with the annular opening groove 113 that is complementary of combination ball seat 112.Be equipped with a temporary jam 106 in each described liquid outlet 109, and each described temporary jam 106 is pressed in liquid outlet 109 by a temporarily stifled gland 105.Described liquid outlet 109 upper ends and between inner sliding sleeve 108 and urceolus 101 inwalls, shear pin 107 lower ends and be equipped with sealing ring 103 between inner sliding sleeve 108 and urceolus 101 inwalls and between guider 110 and inner sliding sleeve 108.Described inner sliding sleeve 108 upper and lower ends are equipped with 104, two described holding screws 104 of a holding screw and all withstand on respectively on the flank of upper and lower gland 102,116 through inner sliding sleeve 108.
Many bunches of sliding sleeves in the utility model are operated by dropping into ball 111 and improving the tool interior fluid pressure.When many bunches of sliding sleeves, during in initial closed state, ball 111 is dropped into by the instrument epimere, its annular slope along guider 110 drops on the short inclined-plane of combination ball seat 112, thereby makes the inner upper-lower sections of these many bunches of sliding sleeves separate.Along with liquid continuous this many bunches of sliding sleeve tops that enter, the thrust that ball 111 is subject to increases gradually.When thrust exceeds the break limit of shear pin 107, uniform shear pin 107 is all cut off, inner sliding sleeve 108 and each parts whole bottom of shifting to urceolus 101 under the promotion of ball 111 mounted thereto.Along with relatively moving of inner sliding sleeve 108, a pair of sealing ring 103 on inner sliding sleeve 108 tops moves past the liquid outlet 109 on urceolus 101, temporarily jam 106 and many bunches of sliding sleeve internal upper part fluid connections.When combination ball seat 112 moves to opening groove 113 position of urceolus 101, combination ball seat 112 radial dilatation under the promotion of expander 117 enters in opening groove 113, and the endoporus aperture that combination ball seat 112 forms becomes large, as shown in Figure 4.Along with the expansion of combination ball seat 112, originally be released by the ball 111 of limited aperture, and, along with the bottom of flow direction urceolus 101, finally enter lower ending tool.As in acidizing treatment section II of the present utility model, a pitching can be opened continuous several many bunches of sliding sleeve 4c, 4d and a standard pitching open-type sliding sleeve 5b, when preparing to implement souring operation, pump into acid solution in oil pipe 10, jam is met corrosion fully within sour 5 minutes temporarily, each sliding sleeve liquid outlet 109 is opened fully, completes the acidizing treatment to this construction section.
Many bunches of homogeneous acidification technology of the utility model open-hole horizontal well segmentation are implemented to be divided into two stages: the first stage is lowered to completion and acidifying tubing string; Second stage is carried out many bunches of homogeneous acidifications of segmentation.As shown in Figure 2, adopt 2 many bunches of sliding sleeves in an acidizing treatment section, and with 7 " hang completion tubular column in sleeve pipe and enter 6 " Open-Hole Section, minutes three sections carry out acidifying is example, and concrete once implementation step is described:
1) use the drill bit drifting to artificial bottom of a well, drifting pipe string structure: 6 " (152.4mm) rock bit+centralizer+3 1/ 2" 1+centralizer of heavy weight drill pipe+3 1/ 2" heavy weight drill pipe+3 1/ 2" the slope drilling rod, to well head, with the drilling mud circulation, until it is consistent to import and export mud property, guarantees that well is smooth;
2) " the pipe string structure is: Φ 150mm drift size gauge tool+3 for sleeve pipe, the scraping 3 times repeatedly in the hanger position to complete scraping, drifting 7 with sleeve pipe pipeline scraper combination drift size gauge tool one-trip string 1/ 2" slope drilling rod 1+7 " sleeve pipe pipeline scraper+3 1/ 2" the slope drilling rod, to well head, behind the above 10m of casing shoe position, starts to carry out mud circulation under scraping, drifting tubing string, until the import and export mud property is consistent, must sieves during circulating mud and filter the particulate contamination that may exist;
3) with the drifting of simulation tubing string
" (152.4mm) rock bit+3 of simulating for the first time the tubing string drifting: 6 1/ 2" 1+junk mill of slope drilling rod 1+3 1/ 2" slope drilling rod+3 1/ 2" heavy weight drill pipe+3 1/ 2" the slope drilling rod is to well head.Drifting, behind artificial bottom of a well, is above carried 2m, and with the circulation of former drilling mud, until the import and export mud property is consistent, circulation time must sieve and filter the particulate contamination that may exist, the discharge capacity when circulation discharge capacity is no less than normal drilling well, guarantee shaft bottom clean, without sand setting;
" (152.4mm) rock bit+3 of simulating for the second time the tubing string drifting: 6 1/ 2" 1+junk mill of slope drilling rod 1+3 1/ 2" 1+junk mill of slope drilling rod 1+3 1/ 2" slope drilling rod+3 1/ 2" heavy weight drill pipe+3 1/ 2" the slope drilling rod is to well head.Drifting, behind artificial bottom of a well, is above carried 2m, and with the circulation of former drilling mud, until the import and export mud property is consistent, circulation time must sieve and filter the particulate contamination that may exist, the discharge capacity when circulation discharge capacity is no less than normal drilling well, guarantee shaft bottom clean, without sand setting;
4) connect and be lowered to completion tubular column: float shoe+lengthening joint+setting ball seat 8+3 1/ 2" oil pipe+opened by pressure formula sliding sleeve 7+3 1/ 2" oil pipe+packer 3e+3 1/ 2" oil pipe+second packer 3d+3 1/ 2" oil pipe+standard pitching open-type sliding sleeve 6b+3 1/ 2" oil pipe+relief valve 5b+3 1/ 2" many bunches of oil pipe+second level sliding sleeve 4d+3 1/ 2" many bunches of sliding sleeve 4b+3 of oil pipe+first order 1/ 2" oil pipe+first packer 3c+3 1/ 2" oil pipe+second packer 3b+3 1/ 2" oil pipe+standard pitching open-type sliding sleeve 6a+3 1/ 2" oil pipe+relief valve 5a+3 1/ 2" many bunches of oil pipe+second level sliding sleeve 4c+3 1/ 2" many bunches of sliding sleeve 4a+3 of oil pipe+first order 1/ 2" oil pipe+first packer 3a+3 1/ 2" oil pipe+7 " hanger 2+ crossover sub+3 1/ 2" drilling rod is to well head;
5) connect and just annotating pipeline, the surface line pressure testing is to 30MPa, and tubing string ballast 10t, replace the interior all mud of pit shaft to slurry tank, until import and export aqueous solution performance is consistent with the 2%KCl aqueous solution;
6), after having replaced mud, throw the setting ball of low-density to setting ball seat 7 places, with 700 type cementing trucks with 0.5~0.6m 3the release of/min displacement pump puts in place, pressurization in drilling rod, setting the first packer 3a, 3c, the second packer 3b, 3d, packer 3e and hanger 2;
7) continue rising pressure in drilling rod, put hanger 1 aside, above carry drilling rod 10m, suppress 15MPa in drilling rod, the sealing of check hanger 1, voltage stabilizing 5min, it is qualified that pressure drop is no more than 0.5MPa, trips out drilling rod;
8) be lowered to tieback string: insert sealing 1+ hydraulic anchor+2 7/ 8" oil pipe+3 1/ 2" oil pipe+oil subsidy distance+tubing hanger, and christmas tree is installed, add guy wire at the well head four direction and fix;
9) connect surface line, pipeline pressure testing 45MPa, it is qualified that the 10min pressure drop is no more than 0.5MPa, annulus test 20MPa, voltage stabilizing 15min, it is that the Inserting Tube sealing is qualified that pressure drop is no more than 0.5MPa;
10) the not pressure release of annular space of 10, sleeve pipe 9 and oil pipe, oil pipe 10 is suppressed until opened by pressure formula sliding sleeve 7 is opened, and closing well is waited for acidizing treatment;
11) carry out the acidizing treatment of the first acidizing treatment section I according to acidifying infusion program infusion acid solution;
12) after the first acidizing treatment section I acidifying completes, from plug valve, drop into ball corresponding to sliding sleeve acidizing treatment section II, with the clarified water pump release and suppress.After the ball seat in ball falls into many bunches of sliding sleeve 4b of the first order, the inner sliding sleeve 108 of many bunches of sliding sleeve 4b of the first order is opened in pressurization, because the liquid outlet 109 of many bunches of sliding sleeves has adopted temporary jam 106 designs, ball seat has adopted the reducing type design simultaneously, therefore when opening many bunches of sliding sleeve 4b of the first order, ball can arrive by the ball seat of many bunches of sliding sleeve 4b of the first order on the ball seat of the many bunches of sliding sleeve 4d in the second level, open many bunches of second level sliding sleeve 4d after same pressurization, ball passes through to arrive on the ball seat in standard pitching open-type sliding sleeve 6b after the ball seat in the sliding sleeve 4d of many bunches of the second level.Now in oil pipe, pressurize and open relief valve 5b again, pump into acid solution again in oil pipe, use acid solution to replace clear water, acid solution enters ,Dui Gai stratum, stratum through the temporary jam 106 at liquid outlet 109 places of the first order many bunches of sliding sleeve 4b, many bunches of second level sliding sleeve 4d and standard pitching open-type sliding sleeve 6b simultaneously and carries out the acid etching de-plugging.Jam is met corrosion fully within sour 5 minutes temporarily, and each sliding sleeve liquid outlet 106 is opened fully, completes the acidizing treatment to this construction section;
13, application and above-mentioned steps 12) same job practices, complete more bunches of homogeneous acidifications constructions of segmentation of last layer acidizing treatment section III and follow-up more groups of acidifying;
14) after the acidizing treatment section all completes many bunches of homogeneous acidifications of segmentation, closing well 30-60min, Demolition Construction equipment and pipeline, the mounted well head of conducting, open flow, drainage system start the row of returning, and the PH that returns discharge opeing requires to reach more than 5 and enters the formation testing system and asked product, if in open flow discharge opeing process stop-spraying, need to adopt the nitrogen gaslift to assist discharge opeing, until return the PH of discharge opeing, reach requirement and can be asked product.
In sum, content of the present utility model is not limited in the above-described embodiment, and those skilled in the art can propose other embodiment within technological guidance's thought of the present utility model, but within this embodiment is included in scope of the present utility model.

Claims (4)

1. many bunches of homogeneous acidification tubing strings of an open-hole horizontal well segmentation, comprise sleeve pipe (9), be arranged in the inner oil pipe (10) of sleeve pipe (9), several acidizing treatment sections (II/III) that are connected with oil pipe (10) and set gradually and the first acidizing treatment section (I) that is connected and is positioned at sleeve pipe (9) afterbody with last acidizing treatment section (II), between described sleeve pipe (9) and oil pipe (10), be provided with for oil pipe (10) being suspended on to hanger (2) and the insertion sealing (1) with oil pipe (10) for Sealed casing pipe (9) on sleeve pipe (9) inwall, it is characterized in that: described the first acidizing treatment section (I) comprises the packer (3e) set gradually, opened by pressure formula sliding sleeve (7), between setting ball seat (8) and float shoe and above-mentioned each parts, by tubing nipple, connect, each described acidizing treatment section (II/III) comprises the first packer (3c/3a) set gradually, several many bunches of sliding sleeves (4b/4a), relief valve (5b/5a), between standard pitching open-type sliding sleeve (6b/6a) and the second packer (3d/3b) and above-mentioned each parts, by tubing nipple, connect, described many bunches of sliding sleeve (4a, 4b), standard pitching open-type sliding sleeve (6a, 6b) and circumferentially be respectively equipped with some liquid outlets (109) on the outer tube wall of opened by pressure formula sliding sleeve (7), be equipped with a temporary jam (106) that still can guarantee in oil pipe (10) to keep certain pressure after sliding sleeve is opened in each described liquid outlet (109), and each described temporary jam (106) is pressed in liquid outlet (109) by a temporarily stifled gland (105).
2. according to many bunches of homogeneous acidification tubing strings of open-hole horizontal well segmentation claimed in claim 1, it is characterized in that: each described many bunches of sliding sleeve (4a, 4b) include urceolus (101), described urceolus (101) upper end is formed with internal thread, lower end is formed with external screw thread, this urceolus (101) outer wall top circumferentially is evenly equipped with a plurality of liquid outlets (109), each described many bunches of sliding sleeve (4a, 4b) also comprise inner sliding sleeve (108), combination ball seat (112), guider (110), expander (117), upper press cover (102), lower cover (116) and ball (111), described inner sliding sleeve (108) is arranged on urceolus (101) inwall by shear pin (107), this inner sliding sleeve (108) middle part circumferentially is evenly equipped with a plurality of square holes, in each described square hole, correspondence is equipped with a ball seat body (115), each described ball seat body (115) described combination ball seat of involutory formation (112), described combination ball seat (112) upper inside wall is formed with short inclined-plane, bottom is formed with long inclined-plane, described combination ball seat (112) upper end is provided with guider (110), lower end is provided with expander (117), described guider (110) is that an annular solid and its inwall are formed with one for the annular slope by ball (111) guiding combination place, the short inclined-plane of ball seat (112), described guider (110) upper end is provided with upper press cover (102), described upper press cover (102) is threaded in inner sliding sleeve (108) upper inside wall, these upper press cover (102) one ends withstand on the upper end of guider (110) and guider (110) are pressed on combination ball seat (112), described expander (117) outer wall top is formed with the front end inclined-plane of an annular, the laminating of bottom and lower cover (116) inwall, the laminating of Yu Chang inclined-plane, described front end inclined-plane, described lower cover (116) is threaded in inner sliding sleeve (108) inwall bottom, be provided with a spring (114) between this lower cover (116) and expander (117), on described urceolus (101) inwall and be positioned at combination ball seat (112) below be formed with one with the annular opening groove (113) that is complementary of combination ball seat (112).
3. according to many bunches of homogeneous acidification tubing strings of open-hole horizontal well segmentation claimed in claim 2, it is characterized in that: described liquid outlet (109) upper end and be positioned at inner sliding sleeve (108) and urceolus (101) inwall between, shear pin (107) lower end and be positioned at inner sliding sleeve (108) and urceolus (101) inwall between and be equipped with sealing ring (103) between guider (110) and inner sliding sleeve (108).
4. according to many bunches of homogeneous acidification tubing strings of open-hole horizontal well segmentation claimed in claim 2, it is characterized in that: described inner sliding sleeve (108) upper and lower end is equipped with a holding screw (104), and two described holding screws (104) all withstand on respectively on the flank of upper and lower gland (102,116) through inner sliding sleeve (108).
CN 201320030371 2013-01-21 2013-01-21 Open hole horizontal well segmentation multi-cluster even acidification tubular column Withdrawn - After Issue CN203035102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320030371 CN203035102U (en) 2013-01-21 2013-01-21 Open hole horizontal well segmentation multi-cluster even acidification tubular column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320030371 CN203035102U (en) 2013-01-21 2013-01-21 Open hole horizontal well segmentation multi-cluster even acidification tubular column

Publications (1)

Publication Number Publication Date
CN203035102U true CN203035102U (en) 2013-07-03

Family

ID=48687235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320030371 Withdrawn - After Issue CN203035102U (en) 2013-01-21 2013-01-21 Open hole horizontal well segmentation multi-cluster even acidification tubular column

Country Status (1)

Country Link
CN (1) CN203035102U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061684A (en) * 2013-01-21 2013-04-24 中国石油集团渤海钻探工程有限公司 Open-hole horizontal well sectional multi-cluster uniform acidizing tubular column and acidizing method thereof
CN104047587A (en) * 2014-07-07 2014-09-17 西安三才石油工程服务有限公司 Method for multi-direction deep acidification of oil layer
CN104179485A (en) * 2014-09-02 2014-12-03 安东石油技术(集团)有限公司 Cementation and fracture technique string and cementation and fracture technique process
CN113006750A (en) * 2021-03-17 2021-06-22 西北大学 Construction tool and method for improving recovery ratio of low-permeability reservoir horizontal well

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061684A (en) * 2013-01-21 2013-04-24 中国石油集团渤海钻探工程有限公司 Open-hole horizontal well sectional multi-cluster uniform acidizing tubular column and acidizing method thereof
CN104047587A (en) * 2014-07-07 2014-09-17 西安三才石油工程服务有限公司 Method for multi-direction deep acidification of oil layer
CN104179485A (en) * 2014-09-02 2014-12-03 安东石油技术(集团)有限公司 Cementation and fracture technique string and cementation and fracture technique process
CN113006750A (en) * 2021-03-17 2021-06-22 西北大学 Construction tool and method for improving recovery ratio of low-permeability reservoir horizontal well

Similar Documents

Publication Publication Date Title
CN103061684B (en) Open-hole horizontal well segmentation many bunches of homogeneous acidification tubing strings and acidization tool thereof
CN103015955B (en) Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN102979495B (en) Many bunches of Limited entry fracturing tubing strings of open-hole horizontal well and fracturing process thereof
CN203808945U (en) Water plugging and controlling technical tubular column for open hole screen pipe completion horizontal well root
CN103133028A (en) Underground coal seam hydrofracture crack oriented developing method
CN105484719A (en) Method for improving multi-cluster crack initiation effectiveness by blocking seams through multi-scale soluble balls
CN105507865A (en) Re-fracturing method for oil, gas and water wells
CN109458168A (en) A kind of Complex Temporary Blocking turnaround fracture method improving sandstone reservoir gas well deliverability
CN203035102U (en) Open hole horizontal well segmentation multi-cluster even acidification tubular column
CN104564001A (en) Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method
CN110284865B (en) Process method for completing repeated fracturing and energy supplement of compact oil horizontal well at one time
CN205063929U (en) Colliery is sealed in pit and is pressed integration segmentation hydraulic fracturing device
CN207145003U (en) Disposably and permanently stop grouting plug for goaf grouting filling
CN204703876U (en) A kind of bridge-type concentric separated-injection tubing string
CN103643931A (en) Completion and fracture integrated pipe column of offshore openhole horizontal well and construction method of pipe column
CN101769271B (en) Deep-well oil-extraction external flow-channel direct and reverse circulation freely-throwing jet injector oil production method and device
CN106761606A (en) The asynchronous note CO of different well of symmetrical expression cloth seam2Oil production method
CN108086945A (en) A kind of layer-through drilling separate type whole process gas drainage hole sealing device and its method for sealing
CN104594870A (en) Fracturing stimulation method
CN201810292U (en) Separated layer water injection process tubular column
CN105443098A (en) Coal mine underground borehole segmented fixed hydraulic fracturing fixation hole device and method
CN204126624U (en) Open-hole horizontal well fixed tubular column jetting sectional well completion fracturing string
CN105649625B (en) A kind of high-low pressure subregion fracturing anatonosis formula coal-bed flooding method
CN105178910A (en) Water-plugging process tubing string and method of horizontal wells
CN107461182B (en) Layering fracturing sand control method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130703

Effective date of abandoning: 20150909

RGAV Abandon patent right to avoid regrant