CN203022016U - Deep hole cleaning and draining device after anti-floating anchor drilling - Google Patents

Deep hole cleaning and draining device after anti-floating anchor drilling Download PDF

Info

Publication number
CN203022016U
CN203022016U CN 201320031876 CN201320031876U CN203022016U CN 203022016 U CN203022016 U CN 203022016U CN 201320031876 CN201320031876 CN 201320031876 CN 201320031876 U CN201320031876 U CN 201320031876U CN 203022016 U CN203022016 U CN 203022016U
Authority
CN
China
Prior art keywords
deep hole
swelling gasbag
expanding airbag
hole cleaning
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320031876
Other languages
Chinese (zh)
Inventor
吴广祥
吕江芬
焦伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320031876 priority Critical patent/CN203022016U/en
Application granted granted Critical
Publication of CN203022016U publication Critical patent/CN203022016U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a deep-hole cleaning and draining device after anti-floating anchor drilling and belongs to the field of deep hole draining devices. The device comprises a high-pressure air inlet pipe, wherein an expanding airbag is arranged on the front part of the high-pressure air inlet pipe; an inflation hole is formed at the joint of the high-pressure air inlet pipe and the expanding airbag; a drainage pipe is connected to the expanding airbag; and the drainage pipe runs through the expanding airbag. The device is simple in structure, convenient to operate and high in working efficiency, the sealing orifice of the expanding airbag is good in effect, the muddy water can be drained to a specified position through the drainage pipe, construction of the operator is not influenced, and the construction environment is improved.

Description

Deep hole cleaning dewatering installation after anti-float anchor rod boring
Technical field
After the utility model relates to surface drilling, deep hole is cleared up dewatering installation, especially the rear deep hole silt cleaning of boring dewatering installation in the construction of high-rise building foundation ditch anti-float anchor rod.
Background technology
in the anti-float anchor rod construction, need first to punch on foundation ditch ground before laying anti-float anchor rod, owing to there being underground water, having beaten Kong Houhui oozes out a lot of water and falls into a large amount of silts, current draining is all generally that operating personnel hold high-pressure air pipe and stand on the limit, hole and construct, utilize gases at high pressure that muddy water is gushed out, so operation muddy water is owing to there is no guidance quality, what will spray is scattered everywhere, splash to it operating personnel, construction environment is abominable, cause secondary pollution, a part of muddy water can fall into the hole again after gushing out again in addition, thereby increased workload, reduce operating efficiency.
Summary of the invention
Technical assignment of the present utility model is deep hole cleaning dewatering installation after a kind of anti-float anchor rod boring that provides for above the deficiencies in the prior art.
The technical scheme that its technical problem that solves the utility model adopts is: deep hole cleaning dewatering installation after anti-float anchor rod boring, comprise high-pressure pipe, be provided with swelling gasbag in described high-pressure pipe front portion, joint at described high-pressure pipe and swelling gasbag is provided with air-filled pore, be connected with gutter on described swelling gasbag, described gutter runs through described swelling gasbag.
Top at described swelling gasbag is provided with protective cover, and described protective cover is positioned at the outlet of deep hole place.
The utility model has the advantage of simple in structure, easy to operate, high efficiency, the swelling gasbag seal orifice is effective, gutter can be discharged to muddy water the position of appointment, does not affect operating personnel's construction, and construction environment is improved.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with Figure of description, the utility model is done following detailed description.
As shown in the figure, deep hole cleaning dewatering installation after anti-float anchor rod boring, comprise high-pressure pipe 2, be provided with swelling gasbag 5 in described high-pressure pipe 2 front portions, joint at described high-pressure pipe 2 and swelling gasbag 5 is provided with air-filled pore 4, be connected with gutter 1 on described swelling gasbag 5, described gutter 1 runs through described swelling gasbag 5.
Be provided with protective cover 3 on the top of described swelling gasbag 5, described protective cover 3 is positioned at the outlet of deep hole place.
Its operating principle is: this device is placed on the place, aperture, booster air pump, part gas enters in swelling gasbag 5 by air-filled pore 4, swelling gasbag 5 inflations are with orifice sealing, another part gas enters in boring by high-pressure pipe 2, the boring internal gas pressure raises, and makes muddy water be forced out from gutter 1 and drains.

Claims (2)

1. after anti-float anchor rod boring, deep hole is cleared up dewatering installation, comprise high-pressure pipe, it is characterized in that being provided with swelling gasbag in described high-pressure pipe front portion, joint at described high-pressure pipe and swelling gasbag is provided with air-filled pore, be connected with gutter on described swelling gasbag, described gutter runs through described swelling gasbag.
2. deep hole cleaning dewatering installation after anti-float anchor rod according to claim 1 boring, is characterized in that being provided with protective cover on the top of described swelling gasbag, and described protective cover is positioned at the outlet of deep hole place.
CN 201320031876 2013-01-22 2013-01-22 Deep hole cleaning and draining device after anti-floating anchor drilling Expired - Fee Related CN203022016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320031876 CN203022016U (en) 2013-01-22 2013-01-22 Deep hole cleaning and draining device after anti-floating anchor drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320031876 CN203022016U (en) 2013-01-22 2013-01-22 Deep hole cleaning and draining device after anti-floating anchor drilling

Publications (1)

Publication Number Publication Date
CN203022016U true CN203022016U (en) 2013-06-26

Family

ID=48646010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320031876 Expired - Fee Related CN203022016U (en) 2013-01-22 2013-01-22 Deep hole cleaning and draining device after anti-floating anchor drilling

Country Status (1)

Country Link
CN (1) CN203022016U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812117A (en) * 2017-03-16 2017-06-09 中国水电建设集团十五工程局有限公司 Dam reverse drainage plugging device and method
CN110984197A (en) * 2019-11-25 2020-04-10 浙江大学 Device and method for starting siphon drainage by pressurization

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812117A (en) * 2017-03-16 2017-06-09 中国水电建设集团十五工程局有限公司 Dam reverse drainage plugging device and method
CN110984197A (en) * 2019-11-25 2020-04-10 浙江大学 Device and method for starting siphon drainage by pressurization

Similar Documents

Publication Publication Date Title
CN203022016U (en) Deep hole cleaning and draining device after anti-floating anchor drilling
CN102705006B (en) Method for governing operating tunnel flood by adopting wellpoint dewatering method
CN204877339U (en) Down -hole drill of effective dust fall
CN203247682U (en) Accumulated liquid removing device
CN201679008U (en) Rigid water drainage device for foundation pit
CN204401718U (en) With layer pre-buried eddy flow list standpipe
CN204125968U (en) The anti-water collecting device of a kind of cable shaft
CN204782855U (en) Mining rig of being furnished with dust collector
CN204662443U (en) Shoe spray flushing system
CN204121813U (en) A kind of flotation froth flusher
CN206769942U (en) A kind of tunnel construction sprinkling dust-removing device
CN202673137U (en) Piston type nail drift
CN203152417U (en) Vermicelli production line steel strip cooling device
CN202000365U (en) Seepage-proof structure for underground continuous wall
CN207277520U (en) Storage pond under river
CN206267184U (en) A kind of draining pump merges the pipe gallery for utilizing
CN206721905U (en) A kind of annular subregion waterpower is broken ground grooving apparatus
CN203990981U (en) The construction site brick device of spreading and sinking in
CN201386282Y (en) Jet supercharging system for light well-point dewatering system
CN204645066U (en) Dewatering installation
CN202866757U (en) Oil tube oil wiper installed on well mouth
CN216226128U (en) In-situ leaching repair device for overproof benzo (a) pyrene in soil
CN203569805U (en) Gravity and siphoning combined rainwater drainage system for high-rise building
CN203856496U (en) Coal seam pumping and releasing drilling negative pressure dedusting system
CN204284699U (en) A kind of solid wall pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626