CN204401718U - With layer pre-buried eddy flow list standpipe - Google Patents

With layer pre-buried eddy flow list standpipe Download PDF

Info

Publication number
CN204401718U
CN204401718U CN201420582081.6U CN201420582081U CN204401718U CN 204401718 U CN204401718 U CN 204401718U CN 201420582081 U CN201420582081 U CN 201420582081U CN 204401718 U CN204401718 U CN 204401718U
Authority
CN
China
Prior art keywords
eddy flow
base
standpipe
cyclone
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420582081.6U
Other languages
Chinese (zh)
Inventor
钟志文
鲁敏芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy-Conservation Development In Science And Technology Co Ltd Of Hunan Tianyuan
Original Assignee
Energy-Conservation Development In Science And Technology Co Ltd Of Hunan Tianyuan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Energy-Conservation Development In Science And Technology Co Ltd Of Hunan Tianyuan filed Critical Energy-Conservation Development In Science And Technology Co Ltd Of Hunan Tianyuan
Priority to CN201420582081.6U priority Critical patent/CN204401718U/en
Application granted granted Critical
Publication of CN204401718U publication Critical patent/CN204401718U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to same layer pre-buried eddy flow list standpipe, connects on upper floor standpipe and the closet pipe with floor layer, comprises standpipe cap, eddy flow down stream tee joint pipe, eddy flow built-in base and cyclone with layer pre-buried eddy flow list standpipe; The upper end of standpipe cap connects upper floor standpipe, eddy flow down stream tee joint pipe comprises main pipeline and arm, arm is located at the side of main pipeline, and be communicated with main pipeline, the outer wall of arm and main pipeline is tangent, and main pipeline upper end connects the lower end of standpipe cap, and main pipeline lower end connects the upper end of eddy flow built-in base, arm connects described closet pipe, and the lower end of eddy flow built-in base connects the upper end of cyclone.Upper and lower two-layer gutter can directly connect at two ends by structure of the present utility model up and down respectively, by eddy flow built-in base and cyclone, sewage is formed eddy flow to drop, the gas in pipeline is discharged in the space utilizing eddy flow to be formed, install simple and convenient, saving of labor material saving, and the effect reaching the direct pre-buried and cyclone, water drainage of pipeline.

Description

With layer pre-buried eddy flow list standpipe
Technical field
The utility model relates to built-in pipe technical field, particularly relates to same layer pre-buried eddy flow list standpipe.
Background technology
As everyone knows, we industry and civilian construction be unable to do without drainage pipe, a position in the future fixed a drainpipe must be reserved in advance in building course in every floor room in house, prior art is: 1, reserve a draining cavity in advance when building mixed earth, or do not wait until in advance when installing in the future and hole to fix a drainpipe, hang mould after good water pipe to be installed is temporarily fixing again and build mortar and fix; 2 or the steel pipe socket of specifications and models larger more in the future than the water pipe needing to install of burying a joint before building in template in advance, hang mould again after then waiting gutter to install and build filling-up hole; But this filling-up hole leaks because people is multi-pass operation, the possibility of leaking is according to statistics more than 20%; These two kinds of traditional modes, time-consumingly delay labour cost, and artificial cost is high, waste steel pipe socket and hang mold materials and again build material, affect the duration, also cause the possibility of leaking.3, our highrise buildings generally present employing Homofloor drainage system, general design is all two standpipes, a blow-off pipe, and a stack forwards in stack after the air pressurized when sewer in pipeline, and indoor there will not be peculiar smell and increase to drop discharge.Such two standpipe material construction and mounting cost high.
Utility model content
The purpose of this utility model overcomes prior art Problems existing in practical operation, provides a kind of novel adjustable waterproof with layer pre-buried eddy flow list standpipe.
The utility model is achieved in that same layer pre-buried eddy flow list standpipe, and connect on upper floor standpipe and the closet pipe with floor layer, described same layer pre-buried eddy flow list standpipe comprises standpipe cap, eddy flow down stream tee joint pipe, eddy flow built-in base and cyclone;
The upper end of described standpipe cap connects upper floor standpipe, described eddy flow down stream tee joint pipe comprises main pipeline and arm, described arm is located at the side of main pipeline, and be communicated with main pipeline, the outer wall of described arm and main pipeline is tangent, and described main pipeline upper end connects the lower end of standpipe cap, main pipeline lower end connects the upper end of eddy flow built-in base, described arm connects described closet pipe, and the lower end of described eddy flow built-in base connects the upper end of cyclone, and the lower end of cyclone is outfall;
Three road inwall seal rings and two pipeline outer wall trench seal rings are provided with in the middle part of described eddy flow built-in base, and be provided with spilled water hole in six impartial grooves in the bottom periphery of outer wall trench seal ring, described eddy flow built-in base lower surface is also provided with several cross reinforcings, the surface on eddy flow built-in base top is provided with secondary direction regulator, and the gully-hole absorbing accidental water leakage is had on secondary direction regulator top, the upper end of eddy flow built-in base connects eddy flow down stream tee joint pipe, outer wall in the middle part of eddy flow built-in base is provided with twice water stopping trough and exosmoses omits hole, water hole in printing, eddy flow built-in base top is provided with guiding gutter, eddy flow built-in base lower end endoporus is provided with axial circular trough and installs ring sight, the bottom of eddy flow built-in base is provided with cup dolly, cup dolly is provided with installs fire trapping ring holddown groove, cup dolly is provided with multiple powdering groove receiving how mixed earth,
Cyclone inside is provided with six guide vanes, and described guide vane is in the same plane, and is evenly distributed on the inwall of cyclone, and guide vane is combined to form helical form mutually.
Further, the diameter of described cyclone becomes large gradually by eddy flow down stream tee joint pipe to the direction of standpipe cap.
The advantage of the same layer pre-buried eddy flow list standpipe that the utility model provides is: upper and lower two-layer gutter can directly connect at two ends by structure of the present utility model up and down respectively, that stops to wear that layer causes because of gutter leaks, by eddy flow built-in base and cyclone, sewage is formed eddy flow to drop simultaneously, the gas in pipeline is discharged in the air column space utilizing eddy flow to be formed in pipeline, so greatly save an extract duct, install simple and convenient, economical and practical, arrange reliable, time saving and energy saving, saving of labor material saving, and the effect reaching the direct pre-buried and cyclone, water drainage of pipeline.
Accompanying drawing explanation
Fig. 1 is the decomposition texture schematic diagram of the utility model with layer pre-buried eddy flow list standpipe;
Fig. 2 is the structural representation of eddy flow built-in base;
Fig. 3 is that the A-A of Fig. 2 is to sectional view;
Fig. 4 is the structural representation of cyclone.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
See also Fig. 1 to Fig. 4, wherein Fig. 1 is the decomposition texture schematic diagram of the utility model with layer pre-buried eddy flow list standpipe; Fig. 2 is the structural representation of eddy flow built-in base; Fig. 3 is that the A-A of Fig. 2 is to sectional view; Fig. 4 is the structural representation of cyclone.
Described same layer pre-buried eddy flow list standpipe, connects upper floor standpipe 10 and with on the closet pipe 20 of floor layer, described same layer pre-buried eddy flow list standpipe comprises standpipe cap 30, eddy flow down stream tee joint pipe 40, eddy flow built-in base 50 and cyclone 60;
The upper end of described standpipe cap 30 connects upper floor standpipe 10, described eddy flow down stream tee joint pipe 40 comprises main pipeline 41 and arm 42, described arm 42 is located at the side of main pipeline 41, and be communicated with main pipeline 41, described arm 42 is tangent with the outer wall of main pipeline 41, described main pipeline 41 upper end connects the lower end of standpipe cap 30, main pipeline 41 lower end connects the upper end of eddy flow built-in base 50, described arm 42 connects described closet pipe 20, the lower end of described eddy flow built-in base 50 connects the upper end of cyclone 60, and the lower end of cyclone 60 is outfall;
Three road inwall seal ring 51 and two pipeline outer wall trench seal rings 52 are provided with in the middle part of described eddy flow built-in base 50, and be provided with spilled water hole 53 in six impartial grooves in the bottom periphery of outer wall trench seal ring 52, described eddy flow built-in base 50 lower surface is also provided with several cross reinforcings 54, the surface on eddy flow built-in base 50 top is provided with secondary direction regulator 55, and the gully-hole 551 absorbing accidental water leakage is had on secondary direction regulator 55 top, the upper end of eddy flow built-in base 50 connects eddy flow down stream tee joint pipe (40), outer wall in the middle part of eddy flow built-in base 50 is provided with twice water stopping trough 57 and exosmoses omits hole, water hole (not shown) in printing, eddy flow built-in base 50 top is provided with guiding gutter (not shown), eddy flow built-in base 50 lower end endoporus is provided with axial circular trough a and installs ring sight b, the bottom of eddy flow built-in base 50 is provided with cup dolly c, cup dolly c is provided with and installs fire trapping ring holddown groove c1, cup dolly c is provided with multiple powdering groove c2 receiving how mixed earth,
Cyclone 60 inside is provided with six guide vanes 61, and described guide vane 61 is in the same plane, and is evenly distributed on the inwall of cyclone 60, and guide vane 61 is combined to form helical form mutually.
Eddy flow built-in base 50 can with cast-in-place mixed earth integral cast-in-situ, greatly reduce working procedure like this and reduce construction cost, owing to being the secondary direction regulator 55 that band water drainage function is arranged at integral cast-in-situ and top, make lavatory caisson have water also can automatically drain only, keep casing dry, guarantee generation of can not leaking; Moreover with layer pre-buried eddy flow list standpipe with main house body integral cast-in-situ, not again reserving hole, hang mould, steel bushing be installed, secondary concreting, form removal, pipe laying, plug fill out secondary concreting on oakum, cleaning pipeline.So greatly save material, save artificial.
Under current are acted on by guide vane 61, water is let out under becoming eddy flow shape to adhere to cyclone 60 inwall formation hollow, the air column formed in pipeline when making air in cyclone 60 utilize water adhesion duct wall eddy flow under the effect of eddy flow hydraulic pressure is upwards vented, and the letdown flow not having negative pressure to produce water simultaneously like this increases greatly.Due to water be attachment cyclone 60 inwall eddy flow and under, reduce cyclone 60 noise.
The diameter of described cyclone 60 becomes large gradually by the direction of eddy flow down stream tee joint pipe 40 to standpipe cap 30.
Multiple tracks guide vane 61 is provided with in cyclone 60 pipeline increased, guide vane 61 one-tenth eddy flow shape, such top sewage forms helical form by swirl vane water when dropping automatically, and the air in cyclone 60 pipeline is discharged automatically by interior whirlpool in cyclone 60 pipeline.
Upper and lower two-layer gutter can directly connect at two ends by structure of the present utility model up and down respectively, that stops to wear that layer causes because of gutter leaks, by eddy flow built-in base 50 and cyclone 60, sewage is formed eddy flow to drop, the gas in pipeline is discharged in the space utilizing eddy flow to be formed, and so greatly saves an extract duct simultaneously, install simple and convenient, economical and practical, arrange reliable, time saving and energy saving, saving of labor material saving, and the effect reaching the direct pre-buried and cyclone, water drainage of pipeline.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.

Claims (2)

1. with layer pre-buried eddy flow list standpipe, connect upper floor standpipe (10) and with on the closet pipe (20) of floor layer, it is characterized in that, described same layer pre-buried eddy flow list standpipe comprises standpipe cap (30), eddy flow down stream tee joint pipe (40), eddy flow built-in base (50) and cyclone (60);
The upper end of described standpipe cap (30) connects upper floor standpipe (10), described eddy flow down stream tee joint pipe (40) comprises main pipeline (41) and arm (42), described arm (42) is located at the side of main pipeline (41), and be communicated with main pipeline (41), described arm (42) is tangent with the outer wall of main pipeline (41), described main pipeline (41) upper end connects the lower end of standpipe cap (30), main pipeline (41) lower end connects the upper end of eddy flow built-in base (50), described arm (42) connects described closet pipe (20), the lower end of described eddy flow built-in base (50) connects the upper end of cyclone (60), the lower end of cyclone (60) is outfall,
Described eddy flow built-in base (50) middle part is provided with three roads inwall seal ring (51) and two pipeline outer wall trench seal rings (52), and be provided with spilled water hole (53) in six impartial grooves in the bottom periphery of outer wall trench seal ring (52), described eddy flow built-in base (50) lower surface is also provided with several cross reinforcings (54), the surface on eddy flow built-in base (50) top is provided with secondary direction regulator (55), and the gully-hole (551) absorbing accidental water leakage is had on secondary direction regulator (55) top, the upper end of eddy flow built-in base (50) connects eddy flow down stream tee joint pipe (40), the outer wall at eddy flow built-in base (50) middle part is provided with twice water stopping trough (57) and exosmoses omits hole, water hole in printing, eddy flow built-in base (50) top is provided with guiding gutter, eddy flow built-in base (50) lower end endoporus is provided with axial circular trough (a) and installs ring sight (b), the bottom of eddy flow built-in base (50) is provided with cup dolly (c), cup dolly (c) is provided with installs fire trapping ring holddown groove (c1), cup dolly (c) is provided with multiple powdering groove (c2) receiving how mixed earth,
Cyclone (60) inside is provided with six guide vanes (61), described guide vane (61) is in the same plane, and being evenly distributed on the inwall of cyclone (60), guide vane (61) is combined to form helical form mutually.
2. same layer according to claim 1 pre-buried eddy flow list standpipe, is characterized in that, the diameter of described cyclone (60) becomes large gradually by eddy flow down stream tee joint pipe (40) to the direction of standpipe cap (30).
CN201420582081.6U 2014-10-10 2014-10-10 With layer pre-buried eddy flow list standpipe Active CN204401718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420582081.6U CN204401718U (en) 2014-10-10 2014-10-10 With layer pre-buried eddy flow list standpipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420582081.6U CN204401718U (en) 2014-10-10 2014-10-10 With layer pre-buried eddy flow list standpipe

Publications (1)

Publication Number Publication Date
CN204401718U true CN204401718U (en) 2015-06-17

Family

ID=53425593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420582081.6U Active CN204401718U (en) 2014-10-10 2014-10-10 With layer pre-buried eddy flow list standpipe

Country Status (1)

Country Link
CN (1) CN204401718U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105135064A (en) * 2015-07-27 2015-12-09 康泰塑胶科技集团有限公司 Leakage preventing embedded pipe
CN106088265A (en) * 2016-07-26 2016-11-09 周忠 A kind of anticlogging single standpipe cyclone of preventing water leakage
CN114440038A (en) * 2021-12-21 2022-05-06 河南中泽新材料股份有限公司 Pipeline interface sealing assembly and same-layer drainage cyclone combined structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105135064A (en) * 2015-07-27 2015-12-09 康泰塑胶科技集团有限公司 Leakage preventing embedded pipe
CN106088265A (en) * 2016-07-26 2016-11-09 周忠 A kind of anticlogging single standpipe cyclone of preventing water leakage
CN114440038A (en) * 2021-12-21 2022-05-06 河南中泽新材料股份有限公司 Pipeline interface sealing assembly and same-layer drainage cyclone combined structure
CN114440038B (en) * 2021-12-21 2024-03-22 河南中泽新材料股份有限公司 Pipeline joint sealing assembly and same-layer drainage cyclone combined structure

Similar Documents

Publication Publication Date Title
CN203307887U (en) Variable and adjustable waterproof pre-embedded base
CN104358305B (en) A kind of cyclone, water drainage riser connecting piece of caisson type washroom
CN204401718U (en) With layer pre-buried eddy flow list standpipe
CN202227694U (en) Embedded sleeve for concrete pouring construction of bathroom floor
CN201195867Y (en) Anti-water leakage floor drain
CN202990036U (en) Connecting piece special for ventilation of high-rise buildings
CN211735694U (en) Drainage mounting structure comprising main floor drain and auxiliary floor drain
CN104775484A (en) Water supply and drainage system of water supply and drainage integrated module and building
CN210151884U (en) Quick pin-connected panel fire prevention falls percolating water collection accessory of making an uproar
CN110094578B (en) Waterproof casing pipe and construction method thereof
CN207064863U (en) A kind of new waterproof sleeve pipe
CN203684350U (en) Fully-closed water seal deodorization same-layer water discharging floor drain
CN202416536U (en) Embedded waterproof floor drain
CN216616161U (en) Concealed floor drain
CN208456124U (en) A kind of drainage pipeline passes through the pre-embedded device of floor
CN204626541U (en) The supply and drain water system of a kind of plumbing integration module and building
CN206457919U (en) A kind of heavy spilling water joint of vertical type floor drain deodorization
CN201144439Y (en) Outdoor homostorey drainage system without descending floor
CN204645171U (en) The supply and drain water system of a kind of plumbing integration module and building
CN205712275U (en) Porta Potti is washed one's hands water secondary utilization system
CN105525673A (en) Same-floor deodorizing drain
CN204081049U (en) With layer multichannel odour-proof floor drain
CN204282499U (en) A kind of cyclone, water drainage riser connecting piece of caisson type washroom
CN209779814U (en) Water accumulation and water stop device for connecting vertical pipe
CN208870160U (en) A kind of straight waterfall formula drain well lid

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant