CN203021311U - Boiling chlorination furnace - Google Patents

Boiling chlorination furnace Download PDF

Info

Publication number
CN203021311U
CN203021311U CN 201220730674 CN201220730674U CN203021311U CN 203021311 U CN203021311 U CN 203021311U CN 201220730674 CN201220730674 CN 201220730674 CN 201220730674 U CN201220730674 U CN 201220730674U CN 203021311 U CN203021311 U CN 203021311U
Authority
CN
China
Prior art keywords
boiling
chloridizing furnace
furnace
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220730674
Other languages
Chinese (zh)
Inventor
朱卫平
李卫红
程代松
金芳荣
张亚军
郑豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZUNBAO TITANIUM CO Ltd
Original Assignee
ZUNBAO TITANIUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZUNBAO TITANIUM CO Ltd filed Critical ZUNBAO TITANIUM CO Ltd
Priority to CN 201220730674 priority Critical patent/CN203021311U/en
Application granted granted Critical
Publication of CN203021311U publication Critical patent/CN203021311U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a boiling chlorination furnace. The boiling chlorination furnace is mainly composed of a furnace body, a boiling area, a chlorine intake manifold and the like, wherein a petroleum coke charge tube is arranged on the furnace body at the upper part of the boiling area; and a compressed air tube and a nitrogen tube are arranged on the chlorine intake manifold respectively. The boiling chlorination furnace disclosed by the utility model can be used for realizing heat insulation after blowout, and is convenient to operate, low in production cost, beneficial for restarting, and simple in structure.

Description

A kind of boiling chloridizing furnace
Technical field
The utility model relates to a kind of boiling chloridizing furnace, belongs to the titanium tetrachloride production technical field.
Background technology
at present, boiling chloridizing furnace is the major equipment of producing titanium tetrachloride, contain calcium in raw material titanium ore due to the boiling chloridizing furnace use, the material of magnesium salts and so on, and boiling chloridizing furnace after stopping chlorine because there is no exothermic heat of reaction, so temperature can descend rapidly, the calcium of molten, magnesium salts can condense into along with the reduction of temperature the lump of rock type, the serious chlorine flow opening that stops up the gas distribution dish, cause and open chlorine skewness after stove next time, can't set up the boiling bed, if after boiling chloridizing furnace stops chlorine, insulation is bad, easily affect the life-span of refractory materials, and the huge consumption that heats up and bring when again opening stove, make production cost increase.Therefore, it is very important that the insulation after the boiling chloridizing furnace blowing out seems, and also there is no the heat preservation technology for the boiling chloridizing furnace blowing out in the prior art.
The utility model content
Be to solve the problem that prior art exists, the utility model provides a kind of boiling chloridizing furnace, can realize comparatively easily the insulation after blowing out, and cost is lower.
The technical solution of the utility model is as described below:
A kind of boiling chloridizing furnace mainly is comprised of body of heater, boiling section, chlorine inlet manifold etc., on the body of heater on boiling section top, the refinery coke filling tube is set, and is respectively equipped with compressed air pipe and nitrogen tube on the chlorine inlet manifold.
Advantage of the present utility model and beneficial effect are: after the boiling chloridizing furnace blowing out, can realize boiling chloridizing furnace is incubated, easy to operate, production cost is low, is conducive to restarting of boiling chloridizing furnace, and simple in structure.
Description of drawings
Fig. 1 is the structural representation of a kind of boiling chloridizing furnace of the utility model;
In figure: 1-body of heater, 2-boiling section, 3-chlorine inlet manifold, 4-refinery coke filling tube, 5-compressed air pipe, 6-nitrogen tube.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, a kind of boiling chloridizing furnace mainly is comprised of body of heater 1, boiling section 2, chlorine inlet manifold 3 etc., on the body of heater 1 on boiling section 2 tops, refinery coke filling tube 4 is set, and is respectively equipped with compressed air pipe 5 and nitrogen tube 6 on chlorine inlet manifold 3.
Boiling chloridizing furnace of the present utility model is after blowing out, the exothermicity of utilizing refinery coke that chlorination process is used to possess, by refinery coke filling tube 4, refinery coke is joined in boiling chloridizing furnace, recycling compressed air pipe 5 and nitrogen tube 6 with pressurized air and nitrogen pass into mix in chlorine inlet manifold 3 after, join again in boiling chloridizing furnace and react with refinery coke, utilize petroleum coke combustion to put and to open the insulation effect of boiling chloridizing furnace and the mobility of boiling section 3, simultaneously can regulate temperature in boiling chloridizing furnace by regulating refinery coke and compressed-air actuated intake.

Claims (1)

1. boiling chloridizing furnace, mainly formed by body of heater (1), boiling section (2), chlorine inlet manifold (3) etc., it is characterized in that on the body of heater (1) on described boiling section (2) top, refinery coke filling tube (4) being set, be respectively equipped with compressed air pipe (5) and nitrogen tube (6) on chlorine inlet manifold (3).
CN 201220730674 2012-12-26 2012-12-26 Boiling chlorination furnace Expired - Fee Related CN203021311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220730674 CN203021311U (en) 2012-12-26 2012-12-26 Boiling chlorination furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220730674 CN203021311U (en) 2012-12-26 2012-12-26 Boiling chlorination furnace

Publications (1)

Publication Number Publication Date
CN203021311U true CN203021311U (en) 2013-06-26

Family

ID=48645307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220730674 Expired - Fee Related CN203021311U (en) 2012-12-26 2012-12-26 Boiling chlorination furnace

Country Status (1)

Country Link
CN (1) CN203021311U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103818932A (en) * 2014-02-28 2014-05-28 金川集团股份有限公司 Large sieve-plate boiling chlorination furnace control parameter cold state analog device and application method
CN105984895A (en) * 2015-02-02 2016-10-05 云南新立有色金属有限公司 Baking system of boiling chlorination furnace
CN106542572A (en) * 2016-10-24 2017-03-29 云南冶金新立钛业有限公司 Bed process is made in the igniting of chlorination furnace
CN107892325A (en) * 2017-11-27 2018-04-10 攀钢集团钒钛资源股份有限公司 A kind of low temperature chlorination stove stopping production heat preserving method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103818932A (en) * 2014-02-28 2014-05-28 金川集团股份有限公司 Large sieve-plate boiling chlorination furnace control parameter cold state analog device and application method
CN103818932B (en) * 2014-02-28 2016-04-13 金川集团股份有限公司 Large-scale have sieve plate boiling chloridizing furnace controling parameters cold-stat e simulation device and using method
CN105984895A (en) * 2015-02-02 2016-10-05 云南新立有色金属有限公司 Baking system of boiling chlorination furnace
CN106542572A (en) * 2016-10-24 2017-03-29 云南冶金新立钛业有限公司 Bed process is made in the igniting of chlorination furnace
CN106542572B (en) * 2016-10-24 2018-01-30 云南冶金新立钛业有限公司 Bed process is made in the igniting of chlorination furnace
CN107892325A (en) * 2017-11-27 2018-04-10 攀钢集团钒钛资源股份有限公司 A kind of low temperature chlorination stove stopping production heat preserving method
CN107892325B (en) * 2017-11-27 2019-10-11 攀钢集团钒钛资源股份有限公司 A kind of low temperature chlorination furnace halt production heat preserving method

Similar Documents

Publication Publication Date Title
CN203021311U (en) Boiling chlorination furnace
CN105399097A (en) Calcium carbide preparation device and method
CN107815516A (en) A kind of external-heat coal base upright furnace for being used to produce DRI
CN201634430U (en) Electric forging furnace for producing broken artificial graphite
CN104016597B (en) A kind of muffle calcination lime burner
CN207175789U (en) Magnesite light calcined magnesia and dead burned magnesia production line integrated equipment
CN203159236U (en) Industrial silicon furnace external refining ladle adopting microwave heating
CN202492377U (en) Catalyst-grade grading antimony trioxide preparation device
CN202054853U (en) Thermal sponge iron charging system for electric furnace smelting
CN204421605U (en) Magnesium metal erects heat storage formula reduction furnace inside and outside tank
CN103710550A (en) Method for poly-generation and large-scale coupling production based on semi coke and magnesium
CN204325301U (en) A kind of power-saving mechanism bamboo charcoal preparation facilities
CN204529935U (en) A kind of novel oxygen enrichment reduction furnace
CN203683085U (en) Device for preparing synthetic gas by performing methane reforming through blast furnace slag sensible heat
CN204085163U (en) Outer hot oxygen-complementing type roller kilns
CN202692680U (en) Natural gas heating furnace burners distributed structure
CN202786299U (en) Reduced iron kiln
CN207050442U (en) A kind of kiln for producing sodium metasilicate
CN206001892U (en) Rotary reaction furnace hot air heating system
CN201876115U (en) Smelting furnace
CN104860314A (en) Calcium carbide furnace and method for preparing calcium carbide with calcium carbide furnace
CN203561203U (en) Perlite preheating expansion energy-saving integral furnace
CN204752218U (en) Carbide stove
CN203938639U (en) A kind of inverted steps formula charring furnace that has wall-hanging coal gas coil device
CN204313488U (en) Assembled hot air stove burner hearth

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20201226