CN202997429U - Pay-off stand for construction - Google Patents
Pay-off stand for construction Download PDFInfo
- Publication number
- CN202997429U CN202997429U CN 201220719875 CN201220719875U CN202997429U CN 202997429 U CN202997429 U CN 202997429U CN 201220719875 CN201220719875 CN 201220719875 CN 201220719875 U CN201220719875 U CN 201220719875U CN 202997429 U CN202997429 U CN 202997429U
- Authority
- CN
- China
- Prior art keywords
- pay
- support platform
- support
- rack
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a pay-off stand for construction, and belongs to the field of construction equipment. The pay-off stand for construction structurally comprises a bracket, a base and a supporting platform, wherein the supporting platform is provided with a bearing bush, and the bracket is arranged on the base; a positioning cylinder is arranged below the supporting platform, and the supporting platform is connected with the upper end of the positioning cylinder; the bracket at the lower end of the positioning cylinder is provided with a positioning table, and the positioning cylinder is fixedly connected with the middle part of the positioning table; two positioning frames are vertically installed at two sides of the supporting platform respectively, the upper end and the lower end of the positioning frame are provided with guide wheels, and the guide wheels are arranged in sliding rails at two sides of the bracket. Compared with the prior art, the pay-off stand for construction has the characteristics of reasonable design, simple structure, convenient use and the like.
Description
Technical field
The utility model relates to a kind of Architectural Equipment, specifically a kind of pay off rack for building.
Background technology
At present in the engineering construction process, the cable line-putting method that uses is: (1), use crane to coordinate unwrapping wire: due to can only be larger at the outside work face, and can use the place of crane to use, machinery expenses is also very high, rises simultaneously to reset that each is very high to the safety condition requirement when operation.(2), set up an easy shelf with the frame pipe and carry out unwrapping wire: because shelf is heavy, shift one's position or cable hank need to be set up when not of uniform size again, waste time and energy.Working face requires larger, and job position is restricted.Need a large amount of manpower and potential safety hazard larger when rising and falling cable hank and unwrapping wire.Adopt simultaneously fastener to connect between the frame pipe, reliability is not high.
Summary of the invention
Technical assignment of the present utility model is for the deficiencies in the prior art, and a kind of pay off rack for building reasonable in design, easy to use is provided.
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of pay off rack for building, comprise support, base and support platform, be provided with bearing shell on support platform, support is arranged on base, support platform below is provided with positional cylinder and is connected with its upper end, positioning table is installed and is fixedly connected with its middle part on the support of positional cylinder lower end, and aforementioned support platform both sides vertically are equipped with respectively locating rack, the locating rack top and bottom are separately installed with guide wheel, and guide wheel is arranged in the slideway of support both sides.
A kind of pay off rack for building, its support platform is connected with the locating rack upper end.
A kind of pay off rack for building be arranged in parallel between its support platform and positioning table.
Pay off rack for building of the present utility model compared with prior art, the beneficial effect that produces is:
The utlity model has the characteristics such as reasonable in design, simple in structure, easy to use, function admirable, practicality, operate comparatively simply, use cost is low, can use under various site conditions at the construction field (site), highly versatile has reduced staff's labour intensity, has effectively improved operating efficiency.
Description of drawings
In figure: 1, bearing shell, 2, support platform, 3, slideway, 4, locating rack, 5, guide wheel, 6, positional cylinder, 7, positioning table, 8, support, 9, base.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail below.
As shown in drawings, pay off rack for building of the present utility model, its structure comprises support 8, base 9 and support platform 2, be provided with bearing shell 1 on support platform 2, support 8 is arranged on base 9, support platform 2 belows are provided with positional cylinder 6 and are connected with its upper end, positioning table 7 is installed on the support 8 of positional cylinder 6 lower ends and is fixedly connected with its middle part, aforementioned support platform 2 both sides vertically are equipped with respectively locating rack 4, locating rack 4 top and bottom are separately installed with guide wheel 5, and guide wheel 5 is arranged in the slideway 3 of support 8 both sides; Support platform 2 is connected with locating rack 4 upper ends; Be arranged in parallel between support platform 2 and positioning table 7.
This frame is on the ground, cable hank is placed on bearing shell 1 top; When the piston rod of positional cylinder 6 moves upward, can hold up cable hank; The locating rack 4 of support platform 2 both sides can guarantee that support platform 2 is in vertical state all the time in motion process.
Its processing and fabricating of pay off rack for building of the present utility model is simple and convenient, and shown in the by specification accompanying drawing, processing and fabricating gets final product.
Except the described technical characterictic of specification, be those skilled in the art's known technology.
Claims (3)
1. pay off rack for building, comprise support, base and support platform, be provided with bearing shell on support platform, support is arranged on base, it is characterized in that support platform below is provided with positional cylinder and is connected with its upper end, positioning table is installed and is fixedly connected with its middle part on the support of positional cylinder lower end, aforementioned support platform both sides vertically are equipped with respectively locating rack, the locating rack top and bottom are separately installed with guide wheel, and guide wheel is arranged in the slideway of support both sides.
2. a kind of pay off rack for building according to claim 1 is characterized in that support platform is connected with the locating rack upper end.
3. a kind of pay off rack for building according to claim 1, is characterized in that be arrangeding in parallel between support platform and positioning table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220719875 CN202997429U (en) | 2012-12-25 | 2012-12-25 | Pay-off stand for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220719875 CN202997429U (en) | 2012-12-25 | 2012-12-25 | Pay-off stand for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202997429U true CN202997429U (en) | 2013-06-12 |
Family
ID=48568561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220719875 Expired - Fee Related CN202997429U (en) | 2012-12-25 | 2012-12-25 | Pay-off stand for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202997429U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106813653A (en) * | 2017-03-10 | 2017-06-09 | 山西省第三建筑工程公司 | The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device and line-putting method |
-
2012
- 2012-12-25 CN CN 201220719875 patent/CN202997429U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106813653A (en) * | 2017-03-10 | 2017-06-09 | 山西省第三建筑工程公司 | The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device and line-putting method |
CN106813653B (en) * | 2017-03-10 | 2023-03-03 | 山西省第三建筑工程公司 | Arc building outer wall outer convex window frame holding column paying-off device and paying-off method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202575747U (en) | Parallel crane | |
CN203562737U (en) | Movable pay-off rack for power cable and wire | |
CN203781754U (en) | Movable weight hoister | |
CN204108633U (en) | A kind of automotive axle tipping arrangement | |
CN204607463U (en) | Building operation material handling lifting auxiliary device | |
CN202829453U (en) | Lift used for arch camber of motor-driven center pivot sprinkling machine | |
CN202245936U (en) | Multipurpose forklift | |
CN202997429U (en) | Pay-off stand for construction | |
CN202953537U (en) | Steel plate production line moving baffle plate device | |
CN203320928U (en) | Overhead hanging basket | |
CN203410650U (en) | Profile steel collecting device | |
CN206321522U (en) | A kind of section of jurisdiction experimental rig | |
CN202633837U (en) | Wire paying-off device for construction | |
CN203430409U (en) | Sectional mobile inclined ladder | |
CN204310736U (en) | A kind of crane for building | |
CN202868067U (en) | Adjustable thread hanging frame | |
CN202808298U (en) | Cylinder lifting machine locating device | |
CN205869919U (en) | A device for dismantling or installation aluminium foil mill injection crossbeam | |
CN204416318U (en) | The horizontal spraying of aluminium section bar runs collection continuously puts device | |
CN103350779A (en) | Section steel collection device | |
CN203247069U (en) | Movable lifting and ascending combined device | |
CN203460116U (en) | Trolley type lifting puller | |
CN201677432U (en) | Equidirectional overturning and high-precision guide-pole die spotting machine | |
CN203285468U (en) | Beam dismounting device for hydraulic support of coal mine tunnel | |
CN203409032U (en) | Precise lower supporting leveller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130612 Termination date: 20131225 |