CN202997369U - A work platform device for overhaul of a valve tower - Google Patents

A work platform device for overhaul of a valve tower Download PDF

Info

Publication number
CN202997369U
CN202997369U CN 201220670120 CN201220670120U CN202997369U CN 202997369 U CN202997369 U CN 202997369U CN 201220670120 CN201220670120 CN 201220670120 CN 201220670120 U CN201220670120 U CN 201220670120U CN 202997369 U CN202997369 U CN 202997369U
Authority
CN
China
Prior art keywords
wheel
valve tower
support
platform device
work platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220670120
Other languages
Chinese (zh)
Inventor
韩建伟
禹晋云
黎张文
夏云礼
袁虎强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANNING BUREAU OF ULTRA-HIGH VOLTAGE TRANSMISSION Co Ltd
Original Assignee
ANNING BUREAU OF ULTRA-HIGH VOLTAGE TRANSMISSION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANNING BUREAU OF ULTRA-HIGH VOLTAGE TRANSMISSION Co Ltd filed Critical ANNING BUREAU OF ULTRA-HIGH VOLTAGE TRANSMISSION Co Ltd
Priority to CN 201220670120 priority Critical patent/CN202997369U/en
Application granted granted Critical
Publication of CN202997369U publication Critical patent/CN202997369U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a work platform device for overhaul of a valve tower. The work platform device comprises a guide rail and a work platform. The guide rail is formed by two main pipes arranged oppositely, cushion blocks and angle aluminum profiles, wherein the main pipes are fixed on the cushion blocks and the cushion blocks are connected with the angle aluminum profiles. The work platform comprises main wheel assemblies, a panel, a support and auxiliary wheel assemblies, wherein the main wheel assemblies are disposed at two ends of the panel and the support and are connected with the support through wheel carriers therein; the auxiliary wheel assemblies are connected to the support at the bottom of the panel; and the main wheel assemblies are provided with brake apparatuses. Through the application of the work platform device, the efficiency of work on the valve tower of overhaul workers is improved, the availability ratio of direct current is further improved and risk of working aloft on the valve tower is reduced. The platform is used in combination of the guide rail, so that the physical strength is saved and the platform will not run into equipment when being placed by the workers. The work platform device achieves effects of being safe and reliable and being convenient to carry and use while meeting various requirements.

Description

A kind of valve tower maintenance special operation platform device
Technical field
The utility model relates to power engineering equipment, specifically a kind of valve tower maintenance special operation platform device.
Background technology
The wide DC transmission engineering of cloud is article one extra-high voltage direct-current in the world, and transmission capacity is large, and electric pressure is high.The Chuxiong current conversion station as the sending end station, is the important outlet that the cloud electricity send Guangdong, the safe and stable operation of our station, safe and stable operation for whole south electric network, people's lives and economic construction need for electricity are satisfied in the supply of assurance Guangdong Electric Power, play an important role.Converter valve is the heart of current conversion station, and its ruuning situation directly affects the availability factor of whole piece DC transmission system, and it is relatively many to affect the factor of converter valve stable operation, such as cooling water pipe leaks, optical fiber attenuation large, the converter valve protectiveness triggers etc.On request, all can regularly go up the tower operation every year, and whole valve tower is removed contamination and routine inspection.Simultaneously in electric power system each AC line also face same problem, valve tower repair rate is higher, and Work tool easily not at present.
At present the Domestic Direct Current Transmission engineering is mainly quoted the technology of Siemens and ABB two enterprises, and wherein Siemens's valve design tower mainly relies on valve Room lift truck and operation plank to complete routine inspection and troubleshooting, and ABB valve design tower structure is reserved with access path.The EHV transmission current conversion station is quoted Siemens technique, only carries out operation on tower by auxiliary plank and operation plank, and its shortcoming is more: 1, the heavy carrying of plank is extremely inconvenient, very flexible; 2, place the easy valve tower that by mistake touches in the plank process; 3, the intensity of plank can't guarantee, and easily aging.Valve tower operation simultaneously also has a lot of unfavorable conditions, and is as narrow and small in working space, the element rapid wear; Work high above the ground; Require dustproof, antistatic etc. in operation process.In view of above situation, eliminate unfavorable factor in the urgent need to a kind of valve tower maintenance special operation platform.
Summary of the invention
The purpose of this utility model is to provide a kind of valve tower maintenance special operation platform device, and it can improve the efficient of service work personnel operation on the valve tower application of crossing, and then improves the availability factor of direct current, and reduces the risk of valve tower height idle job.
The technical solution of the utility model is: valve tower maintenance special operation platform device is comprised of guide rail and job platform; Guide rail is comprised of two symmetrically arranged supervisors, cushion block and aluminum corner brace, and supervisor is fixed on cushion block, and cushion block is connected with aluminum corner brace; Job platform is comprised of main wheel assembly, panel and support, wheel assembly, the main wheel assembly is arranged at the two ends of panel and support, be connected with support by the wheel carrier in the main wheel assembly, be connected with the wheel assembly on the panel bottom bracket, on the main wheel assembly, brake gear is housed.
The main wheel assembly is configured to by wheel, wheel shaft and bearing arrangement, brake gear and wheel, wheel is contained on wheel shaft by bearing arrangement, wheel shaft is fixed on wheel carrier, brake gear is fixed on wheel carrier, brake gear connects the butterfly screw rod by brake shoes and consists of, and guide post is arranged at the top of brake gear on wheel carrier.
The wheel assembly is comprised of wheel carrier and wheel, and wheel carrier is fixed on an end of support, and wheel is fixed on wheel carrier.
The bolt that is used for fixing cushion block of the supervisor termination of guide rail protrudes upward bolt head, as the spacer pin of wheel.
The job platform of the present utility model brake gear that roller arranges that horizontally slips, the assurance personnel do not horizontally slip during operation on job platform; Be provided with spacer pin on guide rail, in case job platform pushes through the position.Application by it improves the efficient of service work personnel operation on the valve tower, and then improves the availability factor of direct current, and reduces the risk of valve tower height idle job.Job platform and guide rail are used in conjunction with, and not only can save strength but also avoid personnel to place job platform collision equipment.Be issued to safe, reliable, easy to carry, easy to use effect in the prerequisite that satisfies requirements.
Description of drawings
Fig. 1 is valve tower maintenance special operation platform apparatus structure schematic diagram of the present utility model.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the A section enlarged drawing in Fig. 1.
Fig. 4 is job platform structural representation of the present utility model.
Fig. 5 is the vertical view of Fig. 4.
Fig. 6 is that wheel A in Fig. 4 is to view.
Fig. 7 is main wheel modular construction schematic diagram in job platform of the present utility model.
In figure: 1-supervisor, 2-rivet, 3-cushion block, 4-aluminum corner brace, 5-Rubber washer, 6-screw, the 7-pad, 8-nut, 9-main wheel assembly, 10-panel, 11-support, 12-rivet, 13,14-diagonal brace, 15-rivet, 16-wheel assembly, 17-screw, 18-pad, the 19-nut, 20-spacer I, 21-butterfly screw rod, 22-nut, 23-brake shoes, the 24-guide post, 25-wheel carrier, 26-wheel, 27-bearing, 28-bearing cap, 29-spacer II, 30-wheel shaft, 31-pad, 32-nut, 33-split pin.
Embodiment
As shown in the figure, valve tower maintenance special operation platform device of the present utility model is comprised of guide rail and job platform; Guide rail is comprised of two symmetrically arranged supervisors 1, cushion block 3 and aluminum corner brace 4, and supervisor's 1 use rivet is fixed on cushion block 3, and cushion block 3 is connected with aluminum corner brace 4.Job platform is comprised of main wheel assembly 9, panel 10 and support 11, wheel assembly 16, main wheel assembly 9 is arranged at the two ends of panel and support, be connected with support 11 by the wheel carrier 25 in the main wheel assembly, be connected with wheel assembly 10 on panel 10 bottom brackets 11, on main wheel assembly 9, brake gear be housed.
Main wheel assembly 9 is made of wheel 26, wheel shaft 30 and bearing arrangement 27,28, brake gear and wheel carrier 25, wheel 26 is contained on wheel shaft 30 by bearing arrangement, wheel shaft 30 is fixed on wheel carrier 25, brake gear is fixed on wheel carrier 25, brake gear connects butterfly screw rod 21 by brake shoes 23 and consists of, and guide post 24 is arranged at the top of brake gear on wheel carrier 25 (Guarantee the stable of brake gear).
Wheel assembly 16 is comprised of wheel carrier and wheel, and wheel carrier is fixed on an end of support 11, and wheel is fixed on wheel carrier.
Job platform is placed on the valve tower assembly and can easily moves left and right, and can hide the restriction of anode reactor and cooling water pipe, can fixedly positioning after moving into place.Tie between platform and guide rail, easily separate and combination.
Connecting portion of the present utility model has adopted the modes such as bolt connection (having comprised bolt, pad, nut), rivet connection.
Operation instruction in work:
First install to place guide rail, guide rail both sides aluminum corner brace is snapped in maintenance assembly both sides radome fix, then lift job platform, make a side of wheel leading.Two wheels on job platform are taken on guide rail, promoted forward job platform, stop promoting when maintenance shield components cover top spacer pin has blocked wheel when the wheel of main wheel assembly is positioned at substantially, job platform puts in place forward.Left/right side-overturn action industry platform makes its guide rail that slips away, the left/right wheel of job platform is contacted with maintenance shield components cover, job platform is slid into the scheduled overhaul position, manually pin by two wheels of lift truck side, job platform can not be horizontally slipped, and the maintainer can climb up job platform and carry out service work.
When the operation personnel overhaul completely, remove the locking of main wheel assembly wheel, the job platform that can easily horizontally slip is placed guide rail with job platform, slides on guide rail to leaving guide rail, then removes guide rail.
Again repeat aforesaid operations during operation.

Claims (5)

1. a valve tower maintenance special operation platform device, is characterized in that being comprised of guide rail and job platform; Guide rail is comprised of two symmetrically arranged supervisors, cushion block and aluminum corner brace, and supervisor is fixed on cushion block, and cushion block is connected with aluminum corner brace; Job platform is comprised of main wheel assembly, panel and support, wheel assembly, the main wheel assembly is arranged at the two ends of panel and support, be connected with support by the wheel carrier in the main wheel assembly, be connected with the wheel assembly on the panel bottom bracket, on the main wheel assembly, brake gear is housed.
2. valve tower according to claim 1 overhauls the special operation platform device, it is characterized in that the main wheel assembly is configured to by wheel, wheel shaft and bearing arrangement, brake gear and wheel, wheel is contained on wheel shaft by bearing arrangement, and wheel shaft is fixed on wheel carrier, and brake gear is fixed on wheel carrier.
3. valve tower maintenance special operation platform device according to claim 1, is characterized in that the wheel assembly is comprised of wheel carrier and wheel, and wheel carrier is fixed on an end of support, and wheel is fixed on wheel carrier.
4. valve tower maintenance special operation platform device according to claim 3, is characterized in that brake gear connects the butterfly screw rod by brake shoes and consists of.
5. valve tower maintenance special operation platform device according to claim 3, is characterized in that guide post is arranged at the top of brake gear on wheel carrier.
CN 201220670120 2012-12-07 2012-12-07 A work platform device for overhaul of a valve tower Expired - Fee Related CN202997369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220670120 CN202997369U (en) 2012-12-07 2012-12-07 A work platform device for overhaul of a valve tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220670120 CN202997369U (en) 2012-12-07 2012-12-07 A work platform device for overhaul of a valve tower

Publications (1)

Publication Number Publication Date
CN202997369U true CN202997369U (en) 2013-06-12

Family

ID=48568501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220670120 Expired - Fee Related CN202997369U (en) 2012-12-07 2012-12-07 A work platform device for overhaul of a valve tower

Country Status (1)

Country Link
CN (1) CN202997369U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103022913A (en) * 2012-12-10 2013-04-03 中国南方电网有限责任公司超高压输电公司安宁局 Work platform device specialized for maintenance of valve tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103022913A (en) * 2012-12-10 2013-04-03 中国南方电网有限责任公司超高压输电公司安宁局 Work platform device specialized for maintenance of valve tower

Similar Documents

Publication Publication Date Title
CN203911299U (en) Electronic auxiliary platform for changing respirator silica gel of large transformer
CN202997369U (en) A work platform device for overhaul of a valve tower
CN103130140B (en) Versatile cable trench cover plate lifting vehicle of transformer substation
CN201234081Y (en) 220kV bus support column porcelain bottle inspection rack
CN103022913A (en) Work platform device specialized for maintenance of valve tower
CN202094530U (en) Moving pulley for reeling and unreeling overhead cables in bypass operation
CN201817208U (en) Simple lifting machine
CN103010965A (en) Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles
CN204917711U (en) Device of driving current collection gas ware dual supply
CN202880699U (en) Bias-rail girder bridge crane
CN102706727B (en) Simulated test device for construction elevator cable
CN201868794U (en) Roller pulley trolley for cable laying
CN103956251B (en) Auxiliary oil feed device of oil-immersed current transformer
CN203529660U (en) Installation structure for guide rail of lifting device of power transmission steel tower and power transmission steel tower
CN204088985U (en) A kind of integrated 10kv Zhu Shang transformer station
CN202594655U (en) Mounting bracket of mobile pump equipment
CN202866341U (en) Gantry type solar power assisting energy bus ceiling maintaining and cleaning device
CN203434491U (en) Isolation-switch maintenance frame for 110kV high-type framework of power substation
CN204938709U (en) A kind of ceiling mount bracket of Novel movable rotor
CN205739208U (en) The tower transfer system of wind turbine power generation unit
CN205141485U (en) Gentle straight module dismounting device
CN203474364U (en) Combined hoisting machine
CN202444194U (en) Transportation car special for isolating switch
CN203415877U (en) Hoisting tool for replacing isolation switch
CN204067965U (en) A kind of transportation trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130612

Termination date: 20141207

EXPY Termination of patent right or utility model