CN202992399U - 一种水下管道支撑桩 - Google Patents
一种水下管道支撑桩 Download PDFInfo
- Publication number
- CN202992399U CN202992399U CN 201220665196 CN201220665196U CN202992399U CN 202992399 U CN202992399 U CN 202992399U CN 201220665196 CN201220665196 CN 201220665196 CN 201220665196 U CN201220665196 U CN 201220665196U CN 202992399 U CN202992399 U CN 202992399U
- Authority
- CN
- China
- Prior art keywords
- pile pipe
- pile
- pipe
- supporting
- movable sheath
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
本实用新型是一种水下管道支撑桩,属于桩基础技术领域。主要用于对海底管道的支撑固定,该装置由上桩管、活动套、活动锁紧螺栓、活动套卡子、滚珠座、推杆、千斤顶、下桩管锁紧螺栓、下桩管、支撑板、滚珠、固定轴、挡板、支撑托板、U形卡子组成。U形卡子将海底管道的裸露悬空段夹持住,两端用螺母固定到支撑托板上面,支撑托板可随管道转动一定角度,活动套套在上桩管外面,固定轴焊接在活动套上,滚珠座也套在上桩管外面,并置于活动套下边,推杆、千斤顶、支撑板依次置于上桩管内部;上桩管部分插入下桩管内,并通过下桩管锁紧螺栓固定。该装置可支撑不同安放角度的海底管道,能把海底管道的悬空段固定到海床上,使其不再因海流或海浪冲击而来回摆动,造成管道断裂,具有较高的应用价值。
Description
技术领域
本实用新型涉及到一种水下管道支撑装置,尤其是用于对海底管道的支撑固定,属于桩基础技术领域。
背景技术
在浅海地区,由于海况和海流的影响,使得海底管道出现悬空现象。海底管道的悬空段因受海流、海浪作用来回摆动。当其局部超过疲劳极限时,管道就有可能产生裂纹甚至断裂,发生漏油事故,造成重大的经济损失和海水污染。本实用新型可有效地支撑固定管道,防止其随海浪摆动。
发明内容
为了将海底管道的悬空段撑起并强制固定到海床上,防止其因来回摆动而断裂,本实用新型提供一种水下管道支撑桩,该装置不仅能够固定水平安放的管道,还适用于有一定倾斜角度安放的管道。
上述目的是由下述技术方案实现的:
一种水下管道支撑桩由上桩管、活动套、活动锁紧螺栓、活动套卡子、滚珠座、推杆、千斤顶、下桩管锁紧螺栓、下桩管、支撑板、滚珠、固定轴、挡板、支撑托板、U形卡子组成。U形卡子将海底管道的裸露悬空段夹持住,两端用螺母固定到支撑托板上面;活动套套在上桩管外面,并用活动套锁紧螺栓固定在上桩管上,将固定轴焊接在活动套上;用挡板和螺母将支撑托板固定在固定轴上;滚珠座也套在上桩管外面,并置于活动套下边,活动套与滚珠座之间放置有滚珠;推杆置于上桩管内部,并在滚珠座下边,千斤顶也置于上桩管内部,并在推杆下边,千斤顶的上端通过销与推杆相连接;支撑板也置于上桩管内部,并在千斤顶下边起支撑作用。上桩管部分插入下桩管内,并通过下桩管锁紧螺栓固定。
上述水下管道支撑桩中的支撑托板由圆形钢管、左梁板、右梁板和上梁板焊接组装而成。安装时,其圆形钢管套在固定轴外面,构成配合,使支撑托板能够倾斜一定角度,以适应有倾斜角度安放的管道。其左梁板和右梁板的下部各切掉一块,以减轻自重。
其按照上述技术方案加工制造成的水下管道支撑桩,可适应不同安放角度的海底管道,能把海底管道的悬空段固定到海床上,使其不再因海流或海浪冲击而来回摆动,而发生管道断裂事故。
附图说明
图1是本实用新型的整体结构主视图。
图2是本实用新型的整体结构轴测图。
图3是支撑托板结构图。
图中1.上桩管,2.活动套,3.活动锁套紧螺栓,4.活动套卡子,5.滚珠座,6.推杆,7.千斤顶,8.下桩管锁紧螺栓,9.下桩管,10.支撑板,11.滚珠,12.固定轴,13.挡板,14.支撑托板,15.U形卡子。
具体实施方式
下面结合附图和实施例对本实用新型作进一步说明。
如附图所示,该装置由上桩管1,活动套2,活动套锁紧螺栓3,活动套卡子4,滚珠座5,推杆6,千斤顶7,下桩管锁紧螺栓8,下桩管9,支撑板10,滚珠11,固定轴12,挡板13,支撑托板14,U形卡子15组成。U形卡子15将海底管道的裸露悬空段夹持住,两端用螺母固定到支撑托板14上面;活动套2套在上桩管1外面,并用活动套锁紧螺栓3固定在上桩管1上,将固定轴12焊接在活动套2上;用挡板13和螺母将支撑托板14固定在固定轴12上;滚珠座5也套在上桩管1外面,并置于活动套2下边,活动套2与滚珠座5之间放置有滚珠11;推杆6置于上桩管1内部,并在滚珠座5下边,千斤顶7也置于上桩管1内部,并在推杆6下边,千斤顶7的上端通过销与推杆6相连接;支撑板10也置于上桩管1内部,并在千斤顶7下边起支撑作用;用活动套卡子4将活动套2、滚珠11和滚珠座5联成一体;上桩管1部分插入下桩管9内,并通过下桩管锁紧螺栓8固定。
本装置的现场施工操作过程是:先用打桩机将下桩管9垂直打入海床的精确位置,再将该装置置于扶正架内,由施工船上的浮吊一同吊起,使上桩管1保持垂直状态,其下端插入下桩管9,用下桩管锁紧螺栓8固定,并注意支撑托板14不要在管道的正上方。放松活动套卡子4,转动活动套2,将支撑托板14转到管道下面,锁紧活动套卡子4。操作千斤顶7向上推动推杆6,由推杆6向上推动活动套2和支撑托板14一起向上移动到恰当位置,上升过程中,支撑托板14会随海底管道调整到合适的倾斜角度。用U形卡子15把海底管道悬空段固定到支撑托板14上。上桩管1与海底管道二者之间的距离可以通过支撑托板14的上梁板的长槽孔进行微调,调整完毕后,把U形卡子15两端的螺母拧紧。水下操作要由潜水员协助进行。
Claims (3)
1.一种水下管道支撑桩,其特征是由上桩管(1),活动套(2),活动套锁紧螺栓(3),活动套卡子(4),滚珠座(5),推杆(6),千斤顶(7),下桩管锁紧螺栓(8),下桩管(9),支撑板(10),滚珠(11),固定轴(12),挡板(13),支撑托板(14),U形卡子(15)组成;U形卡子(15)将海底管道的裸露悬空段夹持住,两端用螺母固定到支撑托板(14)上面;活动套(2)套在上桩管(1)外面,并用活动套锁紧螺栓(3)固定在上桩管(1)上,将固定轴(12)焊接在活动套(2)上;用挡板(13)和螺母将支撑托板(14)固定在固定轴(12)上;滚珠座(5)也套在上桩管(1)外面,并置于活动套(2)下边,活动套(2)与滚珠座(5)之间放置有滚珠(11);推杆(6)置于上桩管(1)内部,并在滚珠座(5)下边,千斤顶(7)也置于上桩管(1)内部,并在推杆(6)下边,千斤顶(7)的上端通过销与推杆(6)相连接;支撑板(10)也置于上桩管(1)内部,并在千斤顶(7)下边起支撑作用;上桩管(1)部分插入下桩管(9)内,并通过下桩管锁紧螺栓(8)固定。
2.根据权利要求1所述的一种水下管道支撑桩,其特征是支撑托板(14)由圆形钢管、左梁板、右梁板和上梁板焊接组装而成;其左梁板和右梁板的下部各切掉一块。
3.根据权利要求1所述的一种水下管道支撑桩,其特征是支撑托板(14)的圆形钢管套在固定轴(12)外面,构成配合,使支撑托板(14)能够倾斜一定角度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220665196 CN202992399U (zh) | 2012-12-05 | 2012-12-05 | 一种水下管道支撑桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220665196 CN202992399U (zh) | 2012-12-05 | 2012-12-05 | 一种水下管道支撑桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202992399U true CN202992399U (zh) | 2013-06-12 |
Family
ID=48563578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220665196 Expired - Fee Related CN202992399U (zh) | 2012-12-05 | 2012-12-05 | 一种水下管道支撑桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202992399U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103322326A (zh) * | 2013-06-28 | 2013-09-25 | 无锡市伟丰印刷机械厂 | 一种双向石油平台管道固定装置 |
CN105822834A (zh) * | 2016-05-27 | 2016-08-03 | 安徽省水利水电勘测设计院 | 可多向调节的水下管道固定装置及其安装方法 |
CN106401192A (zh) * | 2016-11-28 | 2017-02-15 | 广西大学 | 一种混凝土浇筑车 |
CN106931239A (zh) * | 2017-03-29 | 2017-07-07 | 广东国利先进复合材料研发有限公司 | 一种水底管道悬跨支撑方法及装置 |
CN110107740A (zh) * | 2019-05-08 | 2019-08-09 | 哈尔滨工程大学 | 一种用于处理海底管道悬跨的立式桩支撑装置 |
-
2012
- 2012-12-05 CN CN 201220665196 patent/CN202992399U/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103322326A (zh) * | 2013-06-28 | 2013-09-25 | 无锡市伟丰印刷机械厂 | 一种双向石油平台管道固定装置 |
CN105822834A (zh) * | 2016-05-27 | 2016-08-03 | 安徽省水利水电勘测设计院 | 可多向调节的水下管道固定装置及其安装方法 |
CN105822834B (zh) * | 2016-05-27 | 2017-10-24 | 安徽省水利水电勘测设计院 | 可多向调节的水下管道固定装置及其安装方法 |
CN106401192A (zh) * | 2016-11-28 | 2017-02-15 | 广西大学 | 一种混凝土浇筑车 |
CN106931239A (zh) * | 2017-03-29 | 2017-07-07 | 广东国利先进复合材料研发有限公司 | 一种水底管道悬跨支撑方法及装置 |
CN110107740A (zh) * | 2019-05-08 | 2019-08-09 | 哈尔滨工程大学 | 一种用于处理海底管道悬跨的立式桩支撑装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202992399U (zh) | 一种水下管道支撑桩 | |
KR101437379B1 (ko) | 해양 지지구조체 및 그와 관련된 설치방법 | |
WO2014163032A1 (ja) | 浮体構造物 | |
JP2009248792A (ja) | 洋上風力発電用のスパー型浮体構造およびその製造方法ならびにその設置方法 | |
KR101189681B1 (ko) | 해상용 풍력발전기의 지지장치 | |
CN204327103U (zh) | 一种用于隧道盾构始发的反力架 | |
CN110409477B (zh) | 一种钢吊箱防涌浪内撑系统及其施工方法 | |
CN103967055B (zh) | 具有抗冰结构的海上风机大直径单桩基础 | |
KR101573064B1 (ko) | 해상 녹색에너지 발전을 포함하는 기초 파일 시공용 지그 및 이를 이용한 해상 기초구조물 시공 공법 | |
JP2013241911A (ja) | 洋上風力発電設備、その支持装置およびその設計方法 | |
CN106381881A (zh) | 一种重力式单桩基础 | |
CN103266625A (zh) | 一种重力基础结构海底基盘 | |
CN103899843B (zh) | 一种海底管道承载装置 | |
CN2584986Y (zh) | 海底管道固定装置 | |
KR101383159B1 (ko) | 암반 설치용 중력식 해상풍력 기초 슬래브 | |
KR102045025B1 (ko) | 해양구조물용 대형 원통 구조물의 진원도 유지 장치 및 그 제작방법 | |
CN106015739A (zh) | 一种增强在位稳定性的扣入式止屈器 | |
CN203322634U (zh) | 一种石油平台管道护套 | |
CN204437497U (zh) | 预埋式地下管道用提升装置 | |
CN102661444A (zh) | 海洋石油平台深水双管系的安装方法 | |
CN202390850U (zh) | 一种机床地基快速安装结构 | |
JP6202658B1 (ja) | 引上げ構造体、作業船及び枢動アンカー設置方法 | |
JP2016181967A (ja) | ケーブル設置方法 | |
CN204418182U (zh) | 替打桩 | |
CN212772456U (zh) | 一种海上风电单桩结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130612 Termination date: 20131205 |