CN202988952U - Continuous-melting intermittent-production glass electric melting furnace - Google Patents

Continuous-melting intermittent-production glass electric melting furnace Download PDF

Info

Publication number
CN202988952U
CN202988952U CN 201220676414 CN201220676414U CN202988952U CN 202988952 U CN202988952 U CN 202988952U CN 201220676414 CN201220676414 CN 201220676414 CN 201220676414 U CN201220676414 U CN 201220676414U CN 202988952 U CN202988952 U CN 202988952U
Authority
CN
China
Prior art keywords
melting
tank
pond
furnace
glass electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220676414
Other languages
Chinese (zh)
Inventor
秦诚
赵文娟
刘贺涛
孙金坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huafu (chengde) Glass Technology & Engineering Co Ltd
Original Assignee
Huafu (chengde) Glass Technology & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huafu (chengde) Glass Technology & Engineering Co Ltd filed Critical Huafu (chengde) Glass Technology & Engineering Co Ltd
Priority to CN 201220676414 priority Critical patent/CN202988952U/en
Application granted granted Critical
Publication of CN202988952U publication Critical patent/CN202988952U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a continuous-melting intermittent-production glass electric melting furnace which comprises a melting tank, wherein a clarifying tank is arranged below the melting tank and connected with a fetching tank through a rising channel; a molybdenum electrode is arranged in each of the melting tank, the clarifying tank and the fetching tank; a boss is arranged at the top end of the rising channel; and the volume of each of the clarifying tank and the fetching tank is larger than the volume of the melting tank. The glass electric melting furnace disclosed by the utility model is externally coated with a thermal insulation coating so as to prevent heat dissipation and effectively save energy; a slag discharge hole is formed at the bottom center of the fetching tank and is convenient for discharging dead mass in the furnace, thereby avoiding influence of the dead mass on the quality of frit; and the structure design can realize 24-hour continuous melting of the glass electric melting furnace and only needs 8-10 hours of fetching production, thereby solving the problem of night shift of workers and prolonging the service life of the electric melting furnace.

Description

The glass electric furnace of continuous material batch production
Technical field
The utility model relates to a kind of glass manufacturing apparatus, relates in particular to a kind of glass electric furnace of continuous material batch production.
Background technology
Glass electric furnace is a kind of new technology that grew up in the world in 20th century, gets for traditional coal-fired furnace, adopts Electric heating fusion cast glass product.Although glass is almost isolator at low temperatures, the glass under high temperature fused state is a kind of good conductor, and electrode insertion in the glass melt of fusing utilizes the joule effect of electric current to heat in glass melt, makes the electric energy conversion thermal energy.
Glass electric furnace is 24 hours quantity-produced modes both at home and abroad at present, these melting furnaces need to be through fusing in 24 hours, and carry out feeding and produce this design and need all non-stop runs of workman and electric smelter in fusing, affect the life-span of electric smelter, also can make workman's deficiency of having a rest affect health.
The utility model content
The technical problem that the utility model solves is: by improving the structural relation between uptake and settling pond, make the continuous melting of smelting furnace melting end, and feeding pond batch production.
For reaching this purpose, the utility model by the following technical solutions:
A kind of glass electric furnace of continuous material batch production, comprise melting pool, described melting pool below is settling pond, described settling pond connects the feeding pond by uptake, described melting pool, settling pond and inside, feeding pond are provided with molybdenum electrode, described uptake top is provided with boss, and the volume in described settling pond, feeding pond is all greater than the melting pool volume.
Further, the volume in described settling pond, feeding pond is greater than the volume 5%~8% of melting pool.
Further, be coated with thermal insulation coatings on described glass-melting furnace outer wall.
Further, described feeding pond bottom centre is provided with mud hole.
The beneficial effects of the utility model are: the outside is coated with thermal insulation coatings, prevent dissipation of heat, effective save energy, feeding pond bottom centre is provided with mud hole and is convenient to discharge dead material in stove, avoided dead material to affect the quality of frit, this structure design can realize 24 hours continuous melts of glass electric furnace, and only need carry out feeding production in 8~10 hours, solve the problem that the workman is on night shift, extended simultaneously the life-span of electric smelter.
Description of drawings
The below is described in further detail the utility model according to drawings and embodiments.
Fig. 1 is the glass electric furnace structural representation of a kind of continuous material batch production described in the utility model.
In figure:
1, melting pool; 2, settling pond; 3, uptake; 4, feeding pond; 5, thermal insulation coatings; 6, molybdenum electrode; 7, mud hole; 8, boss.
Embodiment
Further illustrate the technical solution of the utility model below in conjunction with accompanying drawing and by embodiment.
As shown in Figure 1, in the present embodiment, the glass electric furnace of a kind of continuous material batch production described in the utility model comprises melting pool 1, described melting pool 1 below is settling pond 2, described settling pond 2 connects feeding pond 4 by uptake 3, described melting pool 1, settling pond 2 and 4 inside, feeding pond are provided with molybdenum electrode 6, and described uptake 3 tops are provided with boss 8, and the volume in described settling pond 2, feeding pond 4 is all greater than melting pool 1 volume; The volume in described settling pond 2, feeding pond 4 is greater than the volume 5%~8% of melting pool 1; Be coated with thermal insulation coatings 5 on described glass-melting furnace outer wall; Described feeding pond 4 bottom centre are provided with mud hole 7.
during work, glass solution enters settling pond 2 clarifications after the interior fusing of melting pool 1, along with increasing of glass solution, beginning is risen along uptake 3, when liquid level surpasses uptake 3 top boss 8 height, in glass solution inflow feeding pond 4, just can begin feeding after feeding pond 4 interior glass solutions storages are a certain amount of, carrying out along with feeding, feeding pond 4 descends simultaneously with the interior liquid level of uptake 3, when being reduced to boss 8, liquid level do not have when following glass solution to replenish in feeding pond 4, continue feeding this moment, the interior liquid level in feeding pond 4 descends until feeding finishes, get feeding pond 4 interior glass solutions clean until again replenish full, need not during this period of time to continue feeding production, therefore realized the purpose of batch production.
This glass electric furnace outside is coated with thermal insulation coatings 5, prevent dissipation of heat, effective save energy, feeding pond 4 bottom centre are provided with mud hole 7 and are convenient to discharge dead material in stove, have avoided dead material to affect the quality of frit, and this structure design can realize 24 hours continuous melts of glass electric furnace, and only need carry out feeding production in 8~10 hours, can guarantee simultaneously that in smelting furnace, large fluctuation does not appear in liquid level, solve the problem that the workman is on night shift, extend simultaneously the life-span of electric smelter.

Claims (4)

1. the glass electric furnace of a continuous material batch production, it is characterized in that, comprise melting pool, described melting pool below is settling pond, described settling pond connects the feeding pond by uptake, described melting pool, settling pond and inside, feeding pond are provided with molybdenum electrode, and described uptake top is provided with boss, and the volume in described settling pond, feeding pond is all greater than the melting pool volume.
2. the glass electric furnace of continuous material batch production according to claim 1, is characterized in that, the volume in described settling pond, feeding pond is greater than the volume 5%~8% of melting pool.
3. the glass electric furnace of continuous material batch production according to claim 1, is characterized in that, is coated with thermal insulation coatings on described glass-melting furnace outer wall.
4. the glass electric furnace of continuous material batch production according to claim 1, is characterized in that, described feeding pond bottom centre is provided with mud hole.
CN 201220676414 2012-12-07 2012-12-07 Continuous-melting intermittent-production glass electric melting furnace Expired - Fee Related CN202988952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220676414 CN202988952U (en) 2012-12-07 2012-12-07 Continuous-melting intermittent-production glass electric melting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220676414 CN202988952U (en) 2012-12-07 2012-12-07 Continuous-melting intermittent-production glass electric melting furnace

Publications (1)

Publication Number Publication Date
CN202988952U true CN202988952U (en) 2013-06-12

Family

ID=48560151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220676414 Expired - Fee Related CN202988952U (en) 2012-12-07 2012-12-07 Continuous-melting intermittent-production glass electric melting furnace

Country Status (1)

Country Link
CN (1) CN202988952U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114685036A (en) * 2022-02-24 2022-07-01 洛阳双元围棋文化发展有限公司 Wet automatic chess piece forming device and forming method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114685036A (en) * 2022-02-24 2022-07-01 洛阳双元围棋文化发展有限公司 Wet automatic chess piece forming device and forming method
CN114685036B (en) * 2022-02-24 2024-01-02 洛阳双元围棋文化发展有限公司 Wet automatic chess piece forming device and forming method

Similar Documents

Publication Publication Date Title
CN102992581B (en) Large thermal power combination tank furnace for producing basalt continuous fibers
CN202543026U (en) Device for preparing molten state high alkali-high aluminum silicate glass
CN201801452U (en) Electric melting tank furnace used for producing continuous fiber of basalt
CN201933006U (en) Multi-zone independently-powered all-electric melting furnace with electrical emptying system at furnace bottom
CN202988952U (en) Continuous-melting intermittent-production glass electric melting furnace
CN205575911U (en) Glass fiber raw materials melting electric stove
CN201485370U (en) Vertical kiln for melting high silica glass
CN201476549U (en) All-electric furnace
CN110204176A (en) The microwave of glass batch is pre- to be melted and then full melting technology and its equipment
CN204356215U (en) A kind of TFT glass electric furnace
CN202988954U (en) Glass electric melting furnace for heating artificial feeding pool by molybdenum electrode
CN201183770Y (en) Glass melting furnace for pressure reducing clarification technology
CN208814873U (en) Level fusing vertical-insert electrode electric melting furnace
CN209726787U (en) A kind of gas-fired crucible furnace
CN202465479U (en) Bottom-inserted electrode electric melting furnace
CN201898638U (en) Composite electrode water jacket
CN204939252U (en) Kiln firing system
CN206033842U (en) Multistage preheating device of hot -galvanize
CN201901632U (en) Double-step longitudinal multi-area all-electric melting furnace
CN208843931U (en) Level fusing top insertion electrode electric melting furnace
CN205501100U (en) Avoid raw materials to pile up glass electric melting furnace of jam
CN216472823U (en) Optical glass discharge tube
CN201250169Y (en) Glass furnace
CN2672059Y (en) Composite heating glass electric melting furnace
CN201395550Y (en) Design of 12-ton high-borosilicate glass electric melting tank furnace body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130612