CN202978054U - Omnibearing adjustment platform of isolation switch mechanism box installation - Google Patents

Omnibearing adjustment platform of isolation switch mechanism box installation Download PDF

Info

Publication number
CN202978054U
CN202978054U CN 201220609862 CN201220609862U CN202978054U CN 202978054 U CN202978054 U CN 202978054U CN 201220609862 CN201220609862 CN 201220609862 CN 201220609862 U CN201220609862 U CN 201220609862U CN 202978054 U CN202978054 U CN 202978054U
Authority
CN
China
Prior art keywords
platform
switch mechanism
mechanism case
isolating switch
supporting leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220609862
Other languages
Chinese (zh)
Inventor
谢子云
刘建辉
李国恒
罗海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN GRID CONSTRUCTION Co
State Grid Corp of China SGCC
Original Assignee
HUNAN GRID CONSTRUCTION Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN GRID CONSTRUCTION Co, State Grid Corp of China SGCC filed Critical HUNAN GRID CONSTRUCTION Co
Priority to CN 201220609862 priority Critical patent/CN202978054U/en
Application granted granted Critical
Publication of CN202978054U publication Critical patent/CN202978054U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to the important electrical equipment installation technology field of a transformer substation in an electric power system and especially relates to an omnibearing adjustment platform of isolation switch mechanism box installation. The platform mainly comprises a support platform, a left and right adjusting platform and a back and forth adjusting platform, wherein the left and right adjusting platform and the back and forth adjusting platform are arranged in a staggered mode. A bottom of the support platform is connected with a plurality of supporting legs whose heights can be independently adjusted. The platform of the utility model has the following advantages that a plurality of functions of supporting and fixing, height adjusting, back and forth adjusting, left and right adjusting and the like are possessed; carrying and transport are convenient; rapid installation adjustment of a high-voltage isolation switch mechanism box can be realized; the platform is especially suitable for a working condition environment which comprises the following situation that an engineering construction site is not smooth or ground is not solid.

Description

The isolating switch mechanism case is installed comprehensive adjustment platform
Technical field
The utility model relates to the important installation of electrical equipment technical field of transformer station in electric power system, specifically refers to the comprehensive adjustment platform of a kind of isolating switch mechanism case installation.
Background technology
Known isolating switch is one of important electric equipment of transformer station in electric power system, its effect is to make charging equipment and charging equipment not cut-off point be arranged significantly or disconnect little electric current operational outfit, wherein mechanism case is the actuating unit of isolator operation running, rely on the internal communication motor to send power to the isolating switch moving contact by the external vertical connecting rod, realize the operation running of isolating switch.And isolating switch to install be one of installation of electrical equipment important component part, and the installation of its mechanism case self is one of important procedure in the isolating switch installation process, the quality of its installation quality directly next step adjustment of decision isolating switch smoothly whether.The concise and to the point installation process of mechanism case is as follows, because the mechanism case deadweight is larger, generally in the 70kg left and right, to first it be lifted away from 500mm left and right in ground during installation, thereunder pad upper support, treat that mechanism case adjusts to the exact position, its upper end is connected with vertical links, proceeds posterolateral is fixed in the isolating switch support by special-purpose fixed mount, then its supported underneath thing is removed.Seem in simple installation process at this exactly, how to select the supported underneath thing extremely important, because will carry out all around and WidFin in the mechanism case installation process, what these adjustment were leaned on is exactly supporter, can the mechanism case that whether directly determining flexibly of supporter adjust to the right place smoothly, can vertical links send out power smoothly, so the development of mechanism case supporter is problem that is worth research in the isolating switch installation process.
Conventional method for utilize at random engineering site plank, flitch, iron sleeper with or basic rim of a cup template etc. as supporter, be padded on the mechanism case below, adjustment difficulty is large, when needing fine setting especially, wayward precision.For example: levelness is poor 2mm only, is difficult to find the just wood chip of 2mm; Left is to poor 3mm only, need two people gently to lift separately mechanism case one end and careful mobile during adjustment, firmly slightly do not note deviation to occur, need again again spended time to adjust, have larger randomness, complexity and not reproducible operability, so traditional installation method science is not lost time, affect installation effectiveness, more do not meet the requirement of civilized construction.Traditional supporter also has the following disadvantages except defects: 1, there is very large hidden danger the safety and steady aspect, easily topples over to hurt sb.'s feelings such as iron sleeper etc. and hinders equipment.2, traditional supporter is irregular, and installation quality is not high, can't Reusability, and the isolating switch mechanism case is installed formed the complete complete work facility of cover.
The applicant is in view of disappearance and the inconvenience of above-mentioned prior art, and the spirit of adhering to research and innovation, keeping on improving is utilized its professional eye and professional knowledge, works out a kind of isolating switch mechanism case comprehensive adjustment platform is installed.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and provides a kind of on-the-spot out-of-flatness of engineering construction and unsound ground of being specially adapted to carry out the installation of isolating switch mechanism case and adjust platform.
The utility model mainly comprises following technology contents: mainly comprise support platform, and platform is regulated in left and right adjusting platform and front and back that staggered floor is arranged on support platform; But the bottom of described support platform is connected with the supporting leg of a plurality of independent regulation height.
Also comprise following technology contents:
Described supporting leg comprises the primary helix governor motion.
Described supporting leg also comprises the secondary spiral governor motion; Wherein the secondary spiral governor motion is installed on the supporting leg top, and the primary helix governor motion is installed on the supporting leg bottom; The pitch of primary helix governor motion is greater than the secondary spiral governor motion.
Described supporting leg and contact position, ground are provided with feet; The feet floor space is greater than the supporting leg floor space.
Be connected to each other by stiffener between supporting leg fixing.
Described left and right adjusting platform and front and back are regulated platform and are controlled by two groups of orthogonal gear regulating systems and crank.
Described front and back are regulated platform and are arranged at left and right adjusting platform top.
The positioning baffle that the end face of described front and back adjusting platform has two projections.
The end face that platform is regulated in described front and back has plurality of through holes.
By above analysis, the isolating switch mechanism case is installed to have a reliable reliable adjustment and adjusts flexibly platform and support, taken into full account the function that supporter has: mechanism case supports fixing, any supporting leg setting height(from bottom) up-down adjustment, front and back position adjusting, left and right position adjustments, and easy to carry, carry the factors such as light, thereby it is whole to have developed the comprehensive adjustment platform of isolating switch mechanism case installation.
The utility model has the advantage of, have and support fixing, several functions such as adjusting, front and back adjusting, left and right adjusting highly, and carry, convenient in carrying, the Fast Installation adjustment of high voltage isolator mechanism case be can realize, the on-the-spot out-of-flatness of engineering construction or the unsound work condition environment in ground are specially adapted to.
Description of drawings
Accompanying drawing 1 is schematic perspective view.
Accompanying drawing 2 is the partial sectional view of Fig. 1.
Accompanying drawing 3 is the front view of Fig. 1.
Accompanying drawing 4 is the right view of Fig. 1.
Accompanying drawing 5 is the vertical view of Fig. 1.
Accompanying drawing 6 is embodiment two schematic perspective views.
Embodiment
Be described further below in conjunction with 1 to 5 pair of preferred embodiment of the present utility model of accompanying drawing, mainly comprise support platform 3, and platform 1 is regulated in left and right adjusting platform 2 and front and back that staggered floor is arranged on support platform 3; But the bottom of described support platform 3 is connected with the supporting leg 4 of a plurality of independent regulation height.
Described supporting leg 4 comprises primary helix governor motion 42, is used for rapid adjustment.Helical structure adopts the DN32 hot galvanized steel pipe, and inside and outside tapping, up and down tapping are in the other direction, and then realizes adjusting up and down by rotation.Just be based on above structure, making this instrument be specially adapted to the on-the-spot out-of-flatness of engineering construction and the installation adjustment of isolating switch mechanism case is carried out on unsound ground.
Described supporting leg 4 also comprises secondary spiral governor motion 41, is used for trickle adjustment; Wherein secondary spiral governor motion 41 is installed on supporting leg 4 tops, and primary helix governor motion 42 is installed on supporting leg 4 bottoms; The pitch of primary helix governor motion 42 is greater than secondary spiral governor motion 41.
Described supporting leg 4 is provided with feet 43 with the contact position, ground; Feet 43 floor spaces are greater than supporting leg 4 floor spaces.On the soft ground of engineering site, prevent from making 4 placements of accent supporting leg not steady because of the deadweight of mechanism case.
4 of supporting legs are connected to each other fixing by stiffener 44.When preventing up-down adjustment, the internal thread steel pipe of primary helix governor motion 42 is followed outer silk steel pipe and is together rotated; And increase the integral rigidity of supporting leg 4.
Described left and right adjusting platform 2 and front and back are regulated platform 1 and are controlled by two groups of orthogonal gear regulating systems 5 and crank 6.Shake crank 6, the gear in gear regulating system 5 in fixing tooth bar Linear motion, is realized required adjusting.
Described front and back are regulated platform 1 and are arranged at left and right adjusting platform 2 tops.Before and after certain described left and right adjusting platform also can be arranged on, adjusting platform 1 top, do not illustrate at this.
The positioning baffle 11 that the end face of described front and back adjusting platform 1 has two projections conveniently just can be located when mechanism case just fills fast.
The end face that platform 1 is regulated in described front and back has plurality of through holes 12, alleviates own wt, reaches the purpose of light carrying.
Specific embodiment is as follows, the utility model is Three-dimentional square shape, and length and width are respectively 500 millimeters, and minimum altitude is 500 millimeters, maximum height is 700 millimeters, be that adjustable range is 500 millimeters to 700 millimeters, select this to be highly because be all in 600 millimeter apart from ground level bottom the isolating switch mechanism case, satisfy the requirement of adjusting up and down, can all can regulate 100 millimeters all around, by the up and down, all around adjust, realize the purpose of installing mechanism case.
The above embodiment has only expressed a kind of execution mode of the present utility model, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the utility model the scope of the claims.Should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise utility, can also make some distortion and improvement, as described in Figure 6, described supporting leg 4 is three, and these all belong to protection range of the present utility model.Therefore, the protection range of the utility model patent should be as the criterion with claims.

Claims (9)

1. the isolating switch mechanism case is installed comprehensive adjustment platform, it is characterized in that: mainly comprise support platform, and platform is regulated in left and right adjusting platform and front and back that staggered floor is arranged on support platform; But the bottom of described support platform is connected with the supporting leg of a plurality of independent regulation height.
2. isolating switch mechanism case according to claim 1 is installed comprehensive adjustment platform, and it is characterized in that: described supporting leg comprises the primary helix governor motion.
3. isolating switch mechanism case according to claim 1 is installed comprehensive adjustment platform, and it is characterized in that: described supporting leg also comprises the secondary spiral governor motion; Wherein the secondary spiral governor motion is installed on the supporting leg top, and the primary helix governor motion is installed on the supporting leg bottom; The pitch of primary helix governor motion is greater than the secondary spiral governor motion.
4. the described isolating switch mechanism case of according to claim 1 to 3 any one is installed comprehensive adjustment platform, and it is characterized in that: described supporting leg and contact position, ground are provided with feet; The feet floor space is greater than the supporting leg floor space.
5. isolating switch mechanism case according to claim 1 is installed comprehensive adjustment platform, it is characterized in that: be connected to each other by stiffener between supporting leg fixing.
6. isolating switch mechanism case according to claim 1 is installed comprehensive adjustment platform, it is characterized in that: described left and right adjusting platform and front and back are regulated platform and are controlled by two groups of orthogonal gear regulating systems and crank.
7. isolating switch mechanism case according to claim 1 is installed comprehensive adjustment platform, it is characterized in that: described front and back are regulated platform and are arranged at left and right adjusting platform top.
8. isolating switch mechanism case according to claim 7 is installed comprehensive adjustment platform, it is characterized in that: the positioning baffle that the end face of described front and back adjusting platform has two projections.
9. isolating switch mechanism case according to claim 7 is installed comprehensive adjustment platform, it is characterized in that: the end face that platform is regulated in described front and back has plurality of through holes.
CN 201220609862 2012-11-19 2012-11-19 Omnibearing adjustment platform of isolation switch mechanism box installation Expired - Fee Related CN202978054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220609862 CN202978054U (en) 2012-11-19 2012-11-19 Omnibearing adjustment platform of isolation switch mechanism box installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220609862 CN202978054U (en) 2012-11-19 2012-11-19 Omnibearing adjustment platform of isolation switch mechanism box installation

Publications (1)

Publication Number Publication Date
CN202978054U true CN202978054U (en) 2013-06-05

Family

ID=48519081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220609862 Expired - Fee Related CN202978054U (en) 2012-11-19 2012-11-19 Omnibearing adjustment platform of isolation switch mechanism box installation

Country Status (1)

Country Link
CN (1) CN202978054U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103986084A (en) * 2014-03-28 2014-08-13 吴胜 Moving overhaul platform of high-voltage breaker mechanism case
CN104134940A (en) * 2014-07-17 2014-11-05 国家电网公司 Mounting rack
CN105226544A (en) * 2015-10-27 2016-01-06 江苏省电力公司镇江供电公司 Station dolly
CN106505444A (en) * 2016-11-19 2017-03-15 北海银河开关设备有限公司 A kind of medium voltage load switch assembly tooling
CN107926842A (en) * 2017-11-29 2018-04-20 江苏农牧科技职业学院 A kind of cultural method for performing smoothly mutton sheep
CN108184755A (en) * 2017-11-29 2018-06-22 江苏农牧科技职业学院 A kind of cultural method of modified form mutton sheep
CN109546559A (en) * 2018-12-19 2019-03-29 国网江苏省电力有限公司常州供电分公司 Isolator operating mechanism installation auxiliary device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103986084A (en) * 2014-03-28 2014-08-13 吴胜 Moving overhaul platform of high-voltage breaker mechanism case
CN103986084B (en) * 2014-03-28 2016-03-23 国网安徽省电力公司检修公司 A kind of high-voltage breaker mechanism case traveling overhaul platform
CN104134940A (en) * 2014-07-17 2014-11-05 国家电网公司 Mounting rack
CN105226544A (en) * 2015-10-27 2016-01-06 江苏省电力公司镇江供电公司 Station dolly
CN105226544B (en) * 2015-10-27 2017-05-17 江苏省电力公司镇江供电公司 Transformer station overhaul trolley
CN106505444A (en) * 2016-11-19 2017-03-15 北海银河开关设备有限公司 A kind of medium voltage load switch assembly tooling
CN107926842A (en) * 2017-11-29 2018-04-20 江苏农牧科技职业学院 A kind of cultural method for performing smoothly mutton sheep
CN108184755A (en) * 2017-11-29 2018-06-22 江苏农牧科技职业学院 A kind of cultural method of modified form mutton sheep
CN109546559A (en) * 2018-12-19 2019-03-29 国网江苏省电力有限公司常州供电分公司 Isolator operating mechanism installation auxiliary device
CN109546559B (en) * 2018-12-19 2023-08-11 国网江苏省电力有限公司常州供电分公司 Installation auxiliary device for isolating switch operating mechanism

Similar Documents

Publication Publication Date Title
CN202978054U (en) Omnibearing adjustment platform of isolation switch mechanism box installation
CN204848169U (en) Power transformer maintains scaffold
CN202178516U (en) Disconnecting switch mechanism case overhauling platform
CN208849296U (en) A kind of box-form transforming device
CN104065079B (en) The control method for coordinating of the discrete and Continuous Var Compensation of a kind of wind-powered electricity generation
CN205323154U (en) Basket adjusting device for basketball training
CN108059118B (en) It is a kind of can recumbency work high-altitude electric power overhaul device
CN203229350U (en) On-load voltage regulation change-over switch lifting device for transformer
CN102400184A (en) Method for realizing accurate replacement of electrode of aluminum electrolytic cell
CN205377130U (en) Cubical switchboard position adjustment device in transformer substation
CN103825221B (en) On a kind of isoelectric level wire, livewire work phase spacing controls device
CN205720584U (en) Generator test clamping device
CN107215371A (en) A kind of carrier carried for power equipment
CN202131816U (en) Fixing device of communication tower
CN211788484U (en) Fixing base for current transformer
CN205841971U (en) The installation tool of energy many high vacant ducts of parallel lay-up
CN202917876U (en) Installation platform
CN209277190U (en) The adjustable disconnecting link basis of ultra-high voltage converter station valve hall
CN206095657U (en) Stepless height -regulating device and can turn around hydraulic support test bench
CN202899300U (en) Combined device for jacking and deviation correction of latticed shell
CN207934791U (en) Electric power operation high altitude platform
CN203787852U (en) Inter-phase distance control device for charged operation on equipotential conductor
CN202900028U (en) Overhaul lifting platform
CN201420933Y (en) Spring feet and refrigerator with spring feet
CN202647650U (en) Illuminating lamp post with movable supporting legs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20191119