CN202970436U - Long spiral drilling rig - Google Patents

Long spiral drilling rig Download PDF

Info

Publication number
CN202970436U
CN202970436U CN 201220566330 CN201220566330U CN202970436U CN 202970436 U CN202970436 U CN 202970436U CN 201220566330 CN201220566330 CN 201220566330 CN 201220566330 U CN201220566330 U CN 201220566330U CN 202970436 U CN202970436 U CN 202970436U
Authority
CN
China
Prior art keywords
unit head
reinforcing cage
pulley
pulley bracket
vibrating hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220566330
Other languages
Chinese (zh)
Inventor
陈彦东
刘纯利
李辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan SanLi Mechanical Manufacture Co Ltd
Original Assignee
Henan SanLi Mechanical Manufacture Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan SanLi Mechanical Manufacture Co Ltd filed Critical Henan SanLi Mechanical Manufacture Co Ltd
Priority to CN 201220566330 priority Critical patent/CN202970436U/en
Application granted granted Critical
Publication of CN202970436U publication Critical patent/CN202970436U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a long spiral drilling rig which comprises a workbench and a mast, wherein the mast is arranged on the workbench; a guiding direction of the mast extends in the above-below direction; a cathead is arranged at the upper end of the mast; a vibratory hammer pulley is rotationally arranged on the cathead; a vibratory hammer hoist is arranged on the workbench; a vibratory hammer hoist steel wire rope is wound on a winding drum of the vibratory hammer hoist; one end of the vibratory hammer hoist steel wire rope moves around the vibratory hammer pulley, is reversed to the front side of the mast and is used for lifting a corresponding vibratory hammer. The long spiral drilling rig can complete piling construction independently.

Description

A kind of long-spiral drilling machine
Technical field
The utility model relates to piling machinery equipment, relates in particular to a kind of long-spiral drilling machine.
Background technology
Now, be accompanied by the development ﹠ construction of high ferro and real estate, piling machinery has obtained swift and violent development, and especially long-spiral drilling machine has obtained unprecedented development.existing long-spiral drilling machine comprises the mast that workbench and the upper length that arranges thereof are extended along the vertical direction, the front end of mast is provided with the guide rail that corresponding unit head guiding movement assembling is extended and be used for to guide direction along the vertical direction, the upper end of mast is provided with catead, rotate on catead and be provided with unit head pulley and reinforcing cage pulley, be provided with master winch and secondary elevator on workbench, be wound with the master winch wire rope on the reel of master winch, be wound with secondary hoisting rope on the reel of secondary elevator, wherein an end pile warp unit head pulley of master winch wire rope commutates to the front side of mast and for lifting corresponding unit head, one end pile warp reinforcing cage pulley of secondary hoisting rope commutates to the front side of mast and is used for lifting corresponding reinforcing cage.During work, under the cooperation of master winch, first complete corresponding drilling construction by unit head, then secondary elevator has lifted corresponding reinforcing cage by secondary hoisting rope, utilize a supporting loop wheel machine to lift corresponding vibrating hammer, vibrating hammer is positioned at the upper end of reinforcing cage and gives reinforcing cage transmitting vibrations power, under the common cooperation of secondary elevator and corresponding loop wheel machine, reinforcing cage is positioned over corresponding boring, thereby completes corresponding piling construction.Existing problem is: in order to realize the lifting of vibrating hammer, just must be by corresponding loop wheel machine, that is to say that must need long-spiral drilling machine and two main equipments of loop wheel machine to work together just can complete piling construction, use in the time of loop wheel machine and long-spiral drilling machine, increase stake work cost, also increased the acquisition cost of equipment; Simultaneously, the volume of loop wheel machine and long-spiral drilling machine is all very large, in the conditional place of some construction spaces, is unfavorable for that also two equipment work simultaneously.
Summary of the invention
The purpose of this utility model is to provide a kind of long-spiral drilling machine that can complete separately piling construction.
In order to address the above problem, the technical solution of the utility model is:
A kind of long-spiral drilling machine, comprise the mast that workbench and the upper guide direction that arranges thereof are extended along the vertical direction, the upper end of mast is provided with catead, rotate on described catead and be provided with the vibrating hammer pulley, also be provided with the vibrating hammer elevator on described workbench, be wound with on the reel of described vibrating hammer elevator the described vibrating hammer pulley of an end pile warp commutation to described mast front side, and be used for the vibrating hammer hoisting rope of lifting corresponding vibration hammer.
Rotate on described catead and be provided with unit head pulley and reinforcing cage pulley, also be provided with master winch and reinforcing cage elevator on described workbench, be wound with on the reel of described master winch an end pile warp unit head pulley commutation to described mast front side, and be used for lifting the master winch wire rope of corresponding unit head, be wound with on the reel of described reinforcing cage elevator an end pile warp reinforcing cage pulley commutation to described mast front side, and be used for lifting the reinforcing cage hoisting rope of corresponding reinforcing cage.
Described catead comprises the unit head pulley bracket and is arranged at respectively reinforcing cage pulley bracket and the vibrating hammer pulley bracket of the described unit head pulley bracket left and right sides, described unit head pulley is arranged on described unit head pulley bracket, described reinforcing cage pulley is arranged on described reinforcing cage pulley bracket, and described vibrating hammer pulley bracket is arranged on described vibrating hammer pulley bracket.
Described reinforcing cage support comprises that an end and described unit head pulley bracket are fixedly linked, the other end is towards the right cantilever that overhangs away from described unit head pulley bracket direction, and described reinforcing cage pulley is arranged on described right cantilever the end away from described unit head pulley bracket; Described vibrating hammer support comprises that an end and described unit head pulley bracket are fixedly linked, the other end is towards the left cantilever that overhangs away from described unit head pulley bracket direction, and described vibrating hammer pulley is arranged on described left cantilever the end away from described unit head pulley bracket.
The beneficial effects of the utility model are: when work, corresponding unit head is by completing corresponding drilling construction with coordinating of master winch, after drilling construction finishes, the reinforcing cage elevator is by the corresponding reinforcing cage of reinforcing cage hoisting rope lifting, the vibrating hammer elevator is by the corresponding vibrating hammer of vibrating hammer hoisting rope lifting, complete that by the cooperation of reinforcing cage elevator and vibrating hammer elevator reinforcing cage is positioned in corresponding boring, thereby complete complete piling construction.In whole piling construction, only need director's spiral drilling machine to get final product, need not be equipped with corresponding loop wheel machine, thereby save the acquisition cost of equipment and the construction cost of piling.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the structural representation of catead in Fig. 1;
Fig. 3 is the top view of Fig. 2.
The specific embodiment
A kind of embodiment of long-spiral drilling machine is as shown in Fig. 1 ~ 3: comprise the mast 5 that workbench 1 and the upper guide direction that arranges thereof are extended along the vertical direction, the front end of mast 5 is provided with the guide rail that corresponding unit head guiding movement assembling is extended and be used for to guiding along the vertical direction, and the upper end of mast 5 is provided with catead 7.Catead 7 comprises unit head pulley bracket 13 and is arranged at respectively reinforcing cage pulley bracket 14 and the vibrating hammer pulley bracket 15 of unit head pulley bracket 13 left and right sides, rotate on unit head pulley bracket 13 and be provided with unit head pulley 8, reinforcing cage pulley bracket 14 comprises that left end and unit head pulley bracket 13 are fixedly linked, right-hand member is towards the right cantilever 14-1 that overhangs away from unit head pulley bracket 13 directions, and the right-hand member of right cantilever 14-1 rotates and is provided with reinforcing cage pulley 6; Vibrating hammer support 15 comprises that right-hand member and unit head pulley bracket 13 are fixedly linked, left end is towards the left cantilever 15-1 that overhangs away from unit head pulley bracket 13 directions, and the left end of left cantilever 15-1 rotates and is provided with vibrating hammer pulley 16.Also be provided with master winch 2, reinforcing cage elevator 3 and vibrating hammer elevator 4 on workbench 1, wherein be wound with an end pile warp unit head pulley 8 on the reel of master winch 2 and commutate to mast 5 front sides, and be used for lifting the master winch wire rope of corresponding unit head; Being wound with an end pile warp reinforcing cage pulley 6 on the reel of reinforcing cage elevator 3 commutates to mast 5 front sides, and is used for lifting the reinforcing cage hoisting rope 11 of corresponding reinforcing cage 12; Be wound with on the reel of vibrating hammer elevator 4 the described vibrating hammer pulley of end pile warp 16 commutations to described mast 5 front sides, and be used for the vibrating hammer hoisting rope 9 of lifting corresponding vibration hammer 10.
During work, master winch 2 is completed drilling construction by the corresponding unit head of master winch wire rope lifting, then reinforcing cage elevator 3 is by the reinforcing cage hoisting rope 11 corresponding reinforcing cages 12 of lifting, vibrating hammer elevator 4 is by the vibrating hammer hoisting rope 9 corresponding vibrating hammers 10 of lifting, and the cooperation by reinforcing cage elevator 3 and vibrating hammer elevator 4 is positioned over reinforcing cage in corresponding boring.Only need director's spiral drilling machine just can complete whole piling construction, saved the acquisition cost of equipment and the construction cost of piling; Also be suitable for simultaneously in the conditional place construction of some construction spaces.
In other embodiment of the present utility model: reinforcing cage pulley bracket and vibrating hammer pulley bracket can also be arranged at the homonymy of unit head pulley bracket.

Claims (4)

1. long-spiral drilling machine, comprise the mast that workbench and the upper guide direction that arranges thereof are extended along the vertical direction, the upper end of mast is provided with catead, it is characterized in that: rotate on described catead and be provided with the vibrating hammer pulley, also be provided with the vibrating hammer elevator on described workbench, be wound with on the reel of described vibrating hammer elevator the described vibrating hammer pulley of an end pile warp commutation to described mast front side, and be used for the vibrating hammer hoisting rope of lifting corresponding vibration hammer.
2. long-spiral drilling machine according to claim 1, it is characterized in that: rotate on described catead and be provided with unit head pulley and reinforcing cage pulley, also be provided with master winch and reinforcing cage elevator on described workbench, be wound with on the reel of described master winch an end pile warp unit head pulley commutation to described mast front side, and be used for lifting the master winch wire rope of corresponding unit head, be wound with on the reel of described reinforcing cage elevator an end pile warp reinforcing cage pulley commutation to described mast front side, and be used for lifting the reinforcing cage hoisting rope of corresponding reinforcing cage.
3. long-spiral drilling machine according to claim 2, it is characterized in that: described catead comprises the unit head pulley bracket and is arranged at respectively reinforcing cage pulley bracket and the vibrating hammer pulley bracket of the described unit head pulley bracket left and right sides, described unit head pulley is arranged on described unit head pulley bracket, described reinforcing cage pulley is arranged on described reinforcing cage pulley bracket, and described vibrating hammer pulley bracket is arranged on described vibrating hammer pulley bracket.
4. long-spiral drilling machine according to claim 3, it is characterized in that: described reinforcing cage support comprises that an end and described unit head pulley bracket are fixedly linked, the other end is towards the right cantilever that overhangs away from described unit head pulley bracket direction, and described reinforcing cage pulley is arranged on described right cantilever the end away from described unit head pulley bracket; Described vibrating hammer support comprises that an end and described unit head pulley bracket are fixedly linked, the other end is towards the left cantilever that overhangs away from described unit head pulley bracket direction, and described vibrating hammer pulley is arranged on described left cantilever the end away from described unit head pulley bracket.
CN 201220566330 2012-10-31 2012-10-31 Long spiral drilling rig Expired - Fee Related CN202970436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220566330 CN202970436U (en) 2012-10-31 2012-10-31 Long spiral drilling rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220566330 CN202970436U (en) 2012-10-31 2012-10-31 Long spiral drilling rig

Publications (1)

Publication Number Publication Date
CN202970436U true CN202970436U (en) 2013-06-05

Family

ID=48511524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220566330 Expired - Fee Related CN202970436U (en) 2012-10-31 2012-10-31 Long spiral drilling rig

Country Status (1)

Country Link
CN (1) CN202970436U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386723A (en) * 2015-12-18 2016-03-09 黄朝阳 Long spiral mast rotatable drilling machine
CN106150353A (en) * 2015-04-08 2016-11-23 温州长城基础工程有限公司 Hollow vibration hammer long-spiral drilling machine and construction method thereof under unit head in one

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150353A (en) * 2015-04-08 2016-11-23 温州长城基础工程有限公司 Hollow vibration hammer long-spiral drilling machine and construction method thereof under unit head in one
CN105386723A (en) * 2015-12-18 2016-03-09 黄朝阳 Long spiral mast rotatable drilling machine

Similar Documents

Publication Publication Date Title
CN201786244U (en) Rotary drilling rig
CN103669351A (en) Full-stroke hole-leading hydraulic static pile driver
CN101293624A (en) Stacking machine
CN204060556U (en) The unit head pressurization pull-up of piling machinery and piling machinery
CN107386286A (en) Based on linear electric motors driving without saddle piling machine
CN202970436U (en) Long spiral drilling rig
CN202247863U (en) Rhinestone pile driver
JP6239455B2 (en) PC steel strand winding device
CN201228216Y (en) Stacking machine
CN202401981U (en) Drilling machine
CN202542703U (en) Electric signal beam crane
CN202970437U (en) Long spiral drilling machine
CN203946809U (en) Light-type boom crane
CN201802318U (en) Lifting and pressurizing device for screw-threaded pile machine
CN202866653U (en) Drilling machine double-main-rod guide rail type hydraulic lifting mechanism
CN202112098U (en) Piling machine for vegetable greenhouse
CN202208922U (en) Impact hammer for pile pouring machine
CN202829361U (en) Small-size hoisting machine
CN216615808U (en) Bored concrete pile steel reinforcement cage positioner for super high-rise building construction
CN202465078U (en) Hoisting mechanism of crane
CN202429936U (en) High-strength electric hoist
CN202704912U (en) Rope guide device applied to well drilling winch
CN203794560U (en) Lifting device for warehouse goods stacking
CN202706029U (en) Top-end pulley frame of pile machine with rotary vertical post
CN202506944U (en) Device for welding H-type steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20131031