CN202247863U - Rhinestone pile driver - Google Patents

Rhinestone pile driver Download PDF

Info

Publication number
CN202247863U
CN202247863U CN2011203239779U CN201120323977U CN202247863U CN 202247863 U CN202247863 U CN 202247863U CN 2011203239779 U CN2011203239779 U CN 2011203239779U CN 201120323977 U CN201120323977 U CN 201120323977U CN 202247863 U CN202247863 U CN 202247863U
Authority
CN
China
Prior art keywords
water
drill bit
bores
drilling rod
pile driver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203239779U
Other languages
Chinese (zh)
Inventor
李华广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011203239779U priority Critical patent/CN202247863U/en
Application granted granted Critical
Publication of CN202247863U publication Critical patent/CN202247863U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a water bores pile driver, it is including workstation (1), vertical leading truck (2), drilling rod (3), be provided with generating set on workstation (1), the operation control platform, hoist engine (4), the speed reducer, dive drill bit (5) and water thick liquid circulating device, hoist engine (4) are connected through wire rope and drilling rod (3) upper end, drilling rod (3) include the connecting rod that the multisection cup jointed mutually, and be provided with vertical pipeline in the connecting rod, upper end connecting rod pipeline is through watertight seal (6) and water thick liquid circulating device's last hose (7) intercommunication, lower extreme drilling rod connecting rod is connected with drill bit (5), drill bit (5) department is provided with the delivery port, it is efficient than traditional pile mode pile driving, vibrations are little.

Description

一种水钻打桩机A rhinestone pile driver

技术领域 technical field

本实用新型涉及一种建筑用打桩设备,具体为一种带有水浆循环的打桩机。 The utility model relates to a piling equipment for construction, in particular to a piling machine with water slurry circulation.

技术背景 technical background

目前,国内的打桩设备主要包括绳、锤、等三点结构式的打桩机,在实际施工过程中,由于振动力大容易造成地质层表面的改变,产生滑坡、泥石流、水源消失等;而工程附近的居民楼房也会产生震动,甚至墙面出现裂缝,引起居民不满,且这样的打桩装置费时费力,打桩效率低下。 At present, domestic piling equipment mainly includes pile drivers with three-point structure such as rope, hammer, and road. Residential buildings in the vicinity will also vibrate, and even cracks will appear on the wall, which will cause dissatisfaction among residents. Moreover, such piling devices are time-consuming and laborious, and the piling efficiency is low.

实用新型内容 Utility model content

本实用新型的目的就是要提供一种打桩效率高、震动小的水钻式打桩机。 The purpose of the utility model is to provide a water-drilling pile driver with high piling efficiency and low vibration.

一种水钻打桩机,它包括有工作台、竖向导向架、钻杆,工作台上设置有发电机组、操作控制台、卷扬机、减速机,导向架设置在工作台端部,卷扬机通过钢丝绳与钻杆上端连接,它还包括潜水钻头及水浆循环装置,钻杆包括多节互相套接的连接杆,且连接杆内设置有竖向管道,上端连接杆管道通过水密封与水浆循环装置的上水胶管连通,下端钻杆连接杆与钻头连接,钻头处设置有出水口。 A hydraulic drilling pile driver, which includes a workbench, a vertical guide frame, and a drill pipe. The workbench is provided with a generator set, an operation console, a winch, and a reducer. The guideframe is arranged at the end of the workbench. The upper end of the rod is connected, and it also includes a submersible drill bit and a water slurry circulation device. The drill pipe includes a multi-section connecting rod that is nested with each other, and a vertical pipe is arranged inside the connecting rod. The upper water rubber hose is connected, and the drill pipe connecting rod at the lower end is connected with the drill bit, and the drill bit is provided with a water outlet.

所述的钻头锥面上设置有竖向筋板,竖向筋板均匀排布在锥面上,筋板外沿设置有小钻头,筋板之间的锥面上设置有与连接杆管道连通的出水口,钻头尖端设置有定位头,定位头为合金圆钢。 Vertical ribs are arranged on the cone surface of the drill bit, and the vertical ribs are evenly arranged on the cone surface. The water outlet of the drill bit is provided with a positioning head, and the positioning head is an alloy round steel.

所述的钻杆上端设置有电机,电机上端与钢丝绳固定连接,电机驱动轴通过联轴器与钻杆连接,电机通过导向键与导向杆上的竖向凹槽滑动连接。 The upper end of the drill rod is provided with a motor, the upper end of the motor is fixedly connected with the wire rope, the drive shaft of the motor is connected with the drill rod through a coupling, and the motor is slidably connected with the vertical groove on the guide rod through the guide key.

所述的水密封与电机固定连接,与钻杆上端部套接,水密封设置有进水阀与上水胶管连通。 The water seal is fixedly connected with the motor, and is socketed with the upper end of the drill pipe. The water seal is provided with a water inlet valve to communicate with the water supply hose.

所述的筋板外沿设置凹槽,小钻头通过紧固螺母固定在凹槽内,紧固螺母设置在钻头旋转方向筋板的背面。 A groove is arranged on the outer edge of the rib plate, and the small drill bit is fixed in the groove by a fastening nut, and the fastening nut is arranged on the back side of the rib plate in the rotation direction of the drill bit.

所述的导向架上设置有导向管,导向管与钻杆滑动连接。 The guide frame is provided with a guide pipe, and the guide pipe is slidably connected with the drill pipe.

所述的导向管上设置有夹紧螺栓,夹紧螺栓可与钻杆压紧式连接。 Clamping bolts are arranged on the guide pipe, and the clamping bolts can be connected with the drill pipe in compression.

所述的水浆循环装置包括上水胶管、水浆泵,上水胶管与水浆泵连通,水浆泵设置在带有沉淀池的储水槽内,储水槽与桩槽相通。 The water slurry circulation device includes a water supply hose and a water slurry pump. The water supply hose communicates with the water slurry pump. The water slurry pump is arranged in a water storage tank with a sedimentation tank, and the water storage tank communicates with the pile tank.

所述的工作台包括活动台面及底部的支架,底部支架设置有液压支腿,活动台面通过液压缸驱动水平位移。 The workbench includes a movable table top and a bottom bracket, the bottom bracket is provided with hydraulic legs, and the movable table is driven to move horizontally by a hydraulic cylinder.

所述的导向架与工作台铰接,工作台通过液压杆与导向架中部铰接。 The guide frame is hinged with the workbench, and the workbench is hinged with the middle part of the guide frame through a hydraulic rod.

操作人员通过卷扬机控制钻杆下放,钻头到达目标位置之后,校正,启动电机、水浆泵,压水打桩即可,相比传统的打桩方式打桩效率高、震动小。 The operator controls the lowering of the drill pipe through the winch. After the drill bit reaches the target position, it can be calibrated, the motor and the slurry pump can be started, and the piling can be driven by pressing water. Compared with the traditional piling method, the piling efficiency is high and the vibration is small.

附图说明 Description of drawings

图1为本实用新型实施例结构示意图; Fig. 1 is the structural representation of the utility model embodiment;

图2为图1中钻头结构示意图。 Fig. 2 is a schematic diagram of the structure of the drill bit in Fig. 1 .

具体实施方式 Detailed ways

如附图所示的一种水钻打桩机,它包括有工作台1、竖向导向架2、钻杆3,工作台1上设置有发电机组、操作控制台、卷扬机4、减速机,导向架2设置在工作台1端部,卷扬机4通过钢丝绳与钻杆3上端连接,它还包括潜水钻头5及水浆循环装置,钻杆3包括多节互相套接的连接杆,且连接杆内设置有竖向管道,上端连接杆管道通过水密封6与水浆循环装置的上水胶管7连通,下端钻杆连接杆与钻头5连接,钻头5处设置有出水口9。 As shown in the accompanying drawings, a rhinestone pile driver includes a workbench 1, a vertical guide frame 2, and a drill pipe 3. The workbench 1 is provided with a generator set, an operation console, a hoist 4, a reducer, and a guide frame. 2. Set at the end of the workbench 1. The winch 4 is connected to the upper end of the drill pipe 3 through a wire rope. It also includes a submersible drill bit 5 and a water slurry circulation device. There are vertical pipes, the upper end connecting rod pipe communicates with the upper water hose 7 of the water slurry circulation device through the water seal 6, the lower end drill pipe connecting rod is connected with the drill bit 5, and the drill bit 5 is provided with a water outlet 9.

所述的钻头5锥面上设置有竖向筋板8,竖向筋板8均匀排布在锥面上,筋板8外沿设置有小钻头,筋板8之间的锥面上设置有与连接杆管道连通的出水口9,钻头尖端设置有定位头10,定位头10为合金圆钢。 The cone surface of the drill bit 5 is provided with vertical ribs 8, the vertical ribs 8 are evenly arranged on the cone surface, the outer edge of the ribs 8 is provided with a small drill, and the cone between the ribs 8 is provided with The water outlet 9 communicated with the connecting rod pipeline, the drill bit tip is provided with a positioning head 10, and the positioning head 10 is an alloy round steel.

所述的钻杆3上端设置有电机11,电机11上端与钢丝绳固定连接,电机驱动轴通过联轴器与钻杆3连接,电机11通过导向键与导向杆2上的竖向凹槽滑动连接。 The upper end of the drill rod 3 is provided with a motor 11, the upper end of the motor 11 is fixedly connected to the wire rope, the motor drive shaft is connected to the drill rod 3 through a coupling, and the motor 11 is slidingly connected to the vertical groove on the guide rod 2 through the guide key. .

所述的水密封6与电机11固定连接,与钻杆3上端部套接,水密封6设置有进水阀与上水胶管7连通。 The water seal 6 is fixedly connected with the motor 11 and is socketed with the upper end of the drill pipe 3 . The water seal 6 is provided with a water inlet valve and communicates with the water hose 7 .

所述的筋板8外沿设置凹槽,小钻头通过紧固螺母固定在凹槽内,紧固螺母设置在钻头旋转方向筋板的背面。 A groove is arranged on the outer edge of the rib plate 8, and the small drill bit is fixed in the groove by a fastening nut, and the fastening nut is arranged on the back side of the rib plate in the direction of drill bit rotation.

所述的导向架2上设置有导向管12,导向管12与钻杆3滑动连接,主要用于稳定钻杆3。 The guide frame 2 is provided with a guide pipe 12, which is slidingly connected with the drill pipe 3, and is mainly used for stabilizing the drill pipe 3.

所述的导向管13上设置有夹紧螺栓,夹紧螺栓可与钻杆3压紧式连接,主要是便于加长或者缩减钻杆长度时增减连接杆操作。 The guide pipe 13 is provided with a clamping bolt, which can be connected with the drill pipe 3 in a compression manner, mainly to facilitate the operation of increasing or decreasing the connecting rod when lengthening or reducing the length of the drill pipe.

所述的水浆循环装置包括上水胶管7、水浆泵13,上水胶管7与水浆泵13连通,水浆泵13设置在带有沉淀池的储水槽内,储水槽与桩槽相通,桩槽内的水浆进入储水槽内,并通过水浆泵13压入钻机装置中,形成水浆正循环。 The water slurry circulation device includes a water supply hose 7 and a water slurry pump 13, the water supply hose 7 is connected to the water slurry pump 13, the water slurry pump 13 is arranged in a water storage tank with a sedimentation tank, and the water storage tank communicates with the pile tank , The water slurry in the pile groove enters the water storage tank, and is pressed into the drilling rig device through the water slurry pump 13, forming a positive circulation of the water slurry.

所述的工作台1包括活动台面及底部的支架,底部支架设置有液压支腿,活动台面通过液压缸驱动水平位移,便于校正最终钻头的位置。 The workbench 1 includes a movable table top and a bottom bracket, and the bottom bracket is provided with hydraulic outriggers, and the movable table top is driven to move horizontally by a hydraulic cylinder, which is convenient for correcting the position of the final drill bit.

所述的导向架2与工作台1铰接,工作台1通过液压杆与导向架2中部铰接,方便落倒导向架2。 The guide frame 2 is hinged with the workbench 1, and the workbench 1 is hinged with the middle part of the guide frame 2 through a hydraulic rod to facilitate the fall of the guide frame 2.

Claims (10)

1. a water bores pile driver; It includes workbench (1), vertical leading truck (2), drilling rod (3); Workbench (1) is provided with generating set, operating console, hoist engine (4), reductor, and leading truck (2) is arranged on workbench (1) end, and hoist engine (4) is connected with drilling rod (3) upper end through wire rope; It is characterized in that: also comprise diving drill bit (5) and water slurry EGR; Drilling rod (3) comprises the connecting rod of the mutual socket of more piece, and is provided with vertical duct in the connecting rod, and upper end connecting rod pipeline is communicated with the last glue pipe (7) of water slurry EGR through water-stop (6); Lower end drilling rod connecting rod is connected with drill bit (5), and drill bit (5) locates to be provided with delivery port (9).
2. a kind of water according to claim 1 bores pile driver; It is characterized in that: described drill bit (5) conical surface is provided with vertical gusset (8); Gusset (8) evenly is arranged on the conical surface, and gusset (8) outer is provided with little drill bit, and the conical surface between the gusset (8) is provided with the delivery port (9) that is communicated with the connecting rod pipeline; Bit point of the drill is provided with positioning head (10), and positioning head (10) is the alloy round steel.
3. a kind of water according to claim 1 and 2 bores pile driver; It is characterized in that: described drilling rod upper end is provided with motor (11); Motor (11) upper end is fixedly connected with wire rope; Motor driving shaft is connected with drilling rod (3) through shaft coupling, and motor (11) is slidingly connected through the vertical groove on feather key and the guide peg (2).
4. a kind of water according to claim 1 bores pile driver, and it is characterized in that: described water-stop (6) is fixedly connected with motor (11), and with the socket of drilling rod upper end, water-stop (6) is provided with water intaking valve and is communicated with last glue pipe (7).
5. a kind of water according to claim 2 bores pile driver, and it is characterized in that: gusset (8) outer is provided with groove, and little drill bit is fixed in the groove through clamp nut, and clamp nut is arranged on the back side of drill bit direction of rotation gusset.
6. a kind of water according to claim 1 bores pile driver, and it is characterized in that: described leading truck (2) is provided with guide pipe (12), and guide pipe (12) is slidingly connected with drilling rod (3).
7. a kind of water according to claim 6 bores pile driver, and it is characterized in that: guide pipe (12) is provided with fishbolt, and fishbolt can be connected with drilling rod (3) compression type.
8. a kind of water according to claim 1 bores pile driver; It is characterized in that: described water slurry EGR comprises glue pipe (7), water slurry pump (13); Last glue pipe (7) is communicated with water slurry pump (13); Water slurry pump (13) is arranged in the aqua storage tank that has sedimentation basin, and aqua storage tank communicates with the piling groove.
9. a kind of water according to claim 1 bores pile driver, and it is characterized in that: described workbench (1) comprises the support of movable table top and bottom, and bottom bracket is provided with hydraulic leg, and movable table top is through the Driven by Hydraulic Cylinder horizontal movement.
10. a kind of water according to claim 1 bores pile driver, it is characterized in that: described leading truck (2) is hinged with workbench (1), and workbench (1) is hinged through hydraulic stem and leading truck (2) middle part.
CN2011203239779U 2011-08-31 2011-08-31 Rhinestone pile driver Expired - Fee Related CN202247863U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203239779U CN202247863U (en) 2011-08-31 2011-08-31 Rhinestone pile driver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203239779U CN202247863U (en) 2011-08-31 2011-08-31 Rhinestone pile driver

Publications (1)

Publication Number Publication Date
CN202247863U true CN202247863U (en) 2012-05-30

Family

ID=46109125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203239779U Expired - Fee Related CN202247863U (en) 2011-08-31 2011-08-31 Rhinestone pile driver

Country Status (1)

Country Link
CN (1) CN202247863U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852157A (en) * 2012-08-30 2013-01-02 中国电力工程顾问集团中南电力设计院 Manual hole pile digging method employing top-fixing water drilling method
CN104818948A (en) * 2015-05-06 2015-08-05 浙江海洋学院 Port piling drill bit
CN108716365A (en) * 2018-04-28 2018-10-30 嘉兴涌锦服饰有限公司 The support device of piling machine
CN108825153A (en) * 2018-06-19 2018-11-16 中交二航局第三工程有限公司 Steel-pipe pile hole cleaning device and borehole cleaning method
CN112252961A (en) * 2020-09-25 2021-01-22 国家电网有限公司 Adjustable multi-water drill drilling mechanism

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852157A (en) * 2012-08-30 2013-01-02 中国电力工程顾问集团中南电力设计院 Manual hole pile digging method employing top-fixing water drilling method
CN102852157B (en) * 2012-08-30 2015-01-07 中国电力工程顾问集团中南电力设计院 Manual hole pile digging method employing top-fixing water drilling method
CN104818948A (en) * 2015-05-06 2015-08-05 浙江海洋学院 Port piling drill bit
CN108716365A (en) * 2018-04-28 2018-10-30 嘉兴涌锦服饰有限公司 The support device of piling machine
CN108825153A (en) * 2018-06-19 2018-11-16 中交二航局第三工程有限公司 Steel-pipe pile hole cleaning device and borehole cleaning method
CN112252961A (en) * 2020-09-25 2021-01-22 国家电网有限公司 Adjustable multi-water drill drilling mechanism

Similar Documents

Publication Publication Date Title
CN202247863U (en) Rhinestone pile driver
CN205047152U (en) Full hydraulic rotary engineering driller
CN203022625U (en) Full-hydraulic rock drilling excavator produced by means of hydraulic excavator
CN102409973B (en) Vehicle-mounted full hydraulic multifunctional deep well drilling machine
CN201202400Y (en) Baseboard anchorage cable drill
CN108265716A (en) One kind can tuning multifunction vibration plant stake device and its construction method
CN102155034A (en) Grooving machine with four swing arms
CN101806074B (en) Triangular-saw groove forming machine
CN206512718U (en) One kind can tuning multifunction vibration plant stake device
CN104632071B (en) The gas-liquid linked rig in colliery
CN204174622U (en) A kind of portable hydraulic power tightening machine
CN206110132U (en) Improved generation pile driver
CN201310301Y (en) Intelligent petroleum workover rig
CN201152052Y (en) Pole setting machine for boring
CN103835652A (en) Vehicle-mounted inclined shaft drilling machine
CN203892450U (en) Hydraulic balancer of beam-pumping unit
CN205576913U (en) Device is spouted soon in stirring of roof pressure formula stake machine
CN204532115U (en) A kind of well workover derrick of snubbing serving machine
CN205400768U (en) Anchor rope integration platform truck
CN204842296U (en) Shaft boring machine belt cleaning device
CN210422518U (en) Dust removal device for excavation and modification drilling rig
CN207003511U (en) A kind of constructing device for clearing up deep water soft clay
CN204598625U (en) Digging apparatus
CN202007425U (en) Air-lift saw type grooving machine
CN202175951U (en) Pile pulling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20170831

CF01 Termination of patent right due to non-payment of annual fee