CN202970019U - Loading and forwarding platform for large wind power main engine - Google Patents

Loading and forwarding platform for large wind power main engine Download PDF

Info

Publication number
CN202970019U
CN202970019U CN201220540985.3U CN201220540985U CN202970019U CN 202970019 U CN202970019 U CN 202970019U CN 201220540985 U CN201220540985 U CN 201220540985U CN 202970019 U CN202970019 U CN 202970019U
Authority
CN
China
Prior art keywords
platform
loading
forwarding
wind power
suspension plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220540985.3U
Other languages
Chinese (zh)
Inventor
井延伟
王洪斌
杨潺
孙士杰
刘广
李焕芳
付秀娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian United Power Technology Baoding Co Ltd
Original Assignee
Guodian United Power Technology Baoding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian United Power Technology Baoding Co Ltd filed Critical Guodian United Power Technology Baoding Co Ltd
Priority to CN201220540985.3U priority Critical patent/CN202970019U/en
Application granted granted Critical
Publication of CN202970019U publication Critical patent/CN202970019U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a loading and forwarding platform for a large wind power main engine, which comprises a main steel frame, wherein a platform is arranged at the top of the main steel frame; a guardrail is arranged on the periphery of the platform; a staircase leading to the platform is arranged at a lateral part of the main steel frame; a suspension plate is installed on the platform; a suspension beam is arranged above the suspension plate; two doors leading to the suspension plate is arranged on the guardrail on one loading and forwarding side; the suspension beam is suspended from the center of the platform for a certain distance; pedals of the staircase, the platform and the suspension plate all adopt circular flange hole antiskid plates with large friction force; and lightning rods are arranged at the top of the platform. As the main steel frame, the platform, the suspension plate, the suspension beam, the lightning rods and a grounding device are adopted, the loading and forwarding platform for the large wind power main engine has the advantages that the operational safety for workers is improved, and accidents of slipping and falling of operators are avoided; the operational efficiency of workers is improved greatly; and experiments show that forwarding is performed by the aid of the platform, compared with the prior art, 50% of time is saved, and the platform can be used widely in the loading and forwarding operation of the wind power main engine.

Description

A kind of large-scale wind electricity main frame entrucking shipping platform
Technical field
The utility model relates to a kind of operating means of large-scale wind electricity main frame entrucking shipping.
Background technology
Along with developing rapidly of domestic and international wind-powered electricity generation industry, both at home and abroad wind-powered electricity generation enterprise constantly does greatly, runs business into strong one, and the production quantity of wind power product is surged, so the task of wind-powered electricity generation main frame entrucking shipping is very heavy.At present, the operation of the wind-powered electricity generation main frame entrucking shipping of prior art is completed mostly like this: the wind-powered electricity generation main frame by gantry crane lifting to the planker of haulage vehicle, the work of bedding cabin waterproof cloth cover, then shipping are completed in the engine room cover top that operating personnel need climb up the wind-powered electricity generation main frame.Although the wind-powered electricity generation main frame is very high, personnel operation belongs to work high above the ground, and effectively safety measure is poor, inefficiency, and the personnel of being prone to injure and wait contingency, and working environment is dangerous very big.
Summary of the invention
The utility model is for the deficiencies in the prior art, and a kind of not only safe and reliable, operating efficiency but also high large-scale wind electricity main frame entrucking shipping platform are provided.
The utility model is realized by following technical scheme, a kind of large-scale wind electricity main frame entrucking shipping platform, comprise the main body steelframe, be provided with platform at main body steelframe top, the platform surrounding all is equipped with guardrail, be provided with at main body steelframe sidepiece the staircase that leads to platform, hanging deck is installed on platform, the hanging deck top is provided with overarm, guardrail has 2 doors that lead to hanging deck in entrucking shipping one side, hang the platform center certain distance is arranged, the pedal of staircase, platform and hanging deck all adopts the large circular protruding hole antiskid plate of frictional force, is provided with lightning rod on the platform top.
The beneficial effects of the utility model are, the utility model is owing to adopting main body steelframe, platform, hanging deck, overarm, lightning rod, ground device, and it has the following advantages: improved the safety of personnel operation, stopped that operating personnel slip, the accident of tumble injury; Greatly improve the efficient of personnel operation, found by test, adopted this device operation shipping, saved time 50% than prior art, can be widely used in the entrucking shipping operation of wind-powered electricity generation main frame.
Description of drawings
A kind of large-scale wind electricity main frame of Fig. 1 entrucking shipping platform structure schematic diagram.
A kind of large-scale wind electricity main frame of Fig. 2 entrucking shipping platform schematic top plan view.
In figure, 1. lightning rod, 2. guardrail, 3. main body steelframe, 4. platform, 5., 6. hanging deck, 7. overarm, 8. staircase.
The specific embodiment
Be described in detail below in conjunction with drawings and Examples.
as shown in the figure, a kind of large-scale wind electricity main frame entrucking shipping platform comprises main body steelframe (3), be provided with platform (4) at main body steelframe (3) top, platform (4) surrounding all is equipped with guardrail (2), be provided with the staircase (8) that leads to platform (4) at main body steelframe (3) sidepiece, hanging deck (6) is installed on platform (4), hanging deck (6) top is provided with overarm (7), guardrail (2) has 2 doors (5) that lead to hanging deck (6) in entrucking shipping one side, overarm (7) hangs the platform center certain distance, staircase (8), the pedal of platform (4) and hanging deck (6) all adopts the large circular protruding hole antiskid plate of frictional force, be provided with lightning rod (1) on platform (4) top.Staircase (8) adopts the inclined ladder structure.Platform (4) is apart from 5 meters, ground, and platform (4) surrounding all is equipped with guardrail (2), and overarm (6) hangs apart from 2.2 meters, anomaly platform center apart from 6.8 meters, ground.Lightning rod (1) adopts zinc-plated structural carbon steel apart from 7.7 meters of ground levels.A cover ground connection device is respectively installed in outer end, main body steelframe (3) bottom, and down lead one end is connected with stone bolt, the other end and ground connector welding, and ground connector is imbedded the underground 1.5m of being no less than.Main body steelframe (3) adopts shaped steel to be welded, and is firmly firm.
In sum, in use, to the planker of transport vehicle, the transport vehicle that carries the wind-powered electricity generation main frame drives to the hanging deck below of entrucking shipping platform to the wind-powered electricity generation main frame by gantry crane lifting.Operating personnel climb up platform by staircase after protective articles has been dressed on ground, the divider gate that passes near wind-powered electricity generation main frame afterbody is climbed up hanging deck, take a step to climb up wind-powered electricity generation main frame engine room cover top, and seat belt hanger is suspended in overarm.Personnel begin at bedding cabin, engine room cover top waterproof cloth cover, rainproof sheet from wind-powered electricity generation main frame afterbody bedding to wind-powered electricity generation main frame head, then face enters wind-powered electricity generation main frame engine room inside before the engine room cover, take off safety belt lock catch, from under engine room inside to ground, fulfil assignment, but the just shipping of wind-powered electricity generation main frame.

Claims (1)

1. large-scale wind electricity main frame entrucking shipping platform, it is characterized in that, be provided with platform at main body steelframe top, the platform surrounding all is equipped with guardrail, is provided with at main body steelframe sidepiece the staircase that leads to platform, hanging deck is installed on platform, hanging deck top is provided with overarm, and guardrail has 2 doors that lead to hanging deck in entrucking shipping one side, hangs the platform center certain distance is arranged, the pedal of staircase, platform and hanging deck all adopts the large circular protruding hole antiskid plate of frictional force, is provided with lightning rod on the platform top.
CN201220540985.3U 2012-10-22 2012-10-22 Loading and forwarding platform for large wind power main engine Expired - Fee Related CN202970019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220540985.3U CN202970019U (en) 2012-10-22 2012-10-22 Loading and forwarding platform for large wind power main engine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220540985.3U CN202970019U (en) 2012-10-22 2012-10-22 Loading and forwarding platform for large wind power main engine

Publications (1)

Publication Number Publication Date
CN202970019U true CN202970019U (en) 2013-06-05

Family

ID=48511113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220540985.3U Expired - Fee Related CN202970019U (en) 2012-10-22 2012-10-22 Loading and forwarding platform for large wind power main engine

Country Status (1)

Country Link
CN (1) CN202970019U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774871A (en) * 2012-10-22 2014-05-07 国电联合动力技术(保定)有限公司 Large wind power mainframe loading transport platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774871A (en) * 2012-10-22 2014-05-07 国电联合动力技术(保定)有限公司 Large wind power mainframe loading transport platform

Similar Documents

Publication Publication Date Title
CN103939299B (en) The split type mounting process of a kind of offshore wind turbine
CN101966965A (en) Special hanger with guide cover wheel hub and turning and hanging method
CN202039587U (en) Temporary platform for installing mating flange on steel chimney
CN203497916U (en) Top cover part of reactor of nuclear power plant and moving device thereof
CN204081539U (en) A kind of overhanging type protection canopy had enough to meet the need
CN205975510U (en) Pier fender maintenance platform
CN201433031Y (en) Shaft overhead operation lifting basket
CN202970019U (en) Loading and forwarding platform for large wind power main engine
CN204752090U (en) Motor -driven elevating gear of pole
CN201857209U (en) Special lifting tool provided with wheel hub of diversion cover
CN103774871A (en) Large wind power mainframe loading transport platform
CN203806914U (en) Single-phase hanging basket
CN206599363U (en) Vertical transferring apparatus
CN205653066U (en) Take gantry crane of windrow dolly linkage
CN205527632U (en) Vertical well lid door opening device
CN204737588U (en) Compensating beam for bridge crane
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN204802903U (en) Safe tower crane
CN204286353U (en) For the guide rail bracket joint pick-up unit of lifter
CN203555689U (en) Electric hanging basket for vertical shaft
CN203794493U (en) Lifting device applicable to narrow and small space
CN105800473A (en) Gantry crane with material stacking dolly linkage
CN205076619U (en) Single hoisting point double -deck elevator hanging flower basket
CN203382337U (en) Electric hanging basket for drainage vertical well of large-scale ship lock
CN205772813U (en) For 40 tons of door machines built-in decelerator remove and install one suspender

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20211022

CF01 Termination of patent right due to non-payment of annual fee