CN202963885U - Sleeve butt joint centering device - Google Patents

Sleeve butt joint centering device Download PDF

Info

Publication number
CN202963885U
CN202963885U CN 201220670104 CN201220670104U CN202963885U CN 202963885 U CN202963885 U CN 202963885U CN 201220670104 CN201220670104 CN 201220670104 CN 201220670104 U CN201220670104 U CN 201220670104U CN 202963885 U CN202963885 U CN 202963885U
Authority
CN
China
Prior art keywords
sleeve pipe
centralizer
steel rings
hole slot
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220670104
Other languages
Chinese (zh)
Inventor
徐培远
王新敏
曹伟
姬玉平
曹东风
张振伦
袁志坚
张跃亭
郝登峰
王立峰
石继峰
徐影
张晓昂
李亚辉
杨樱花
刘国卫
靳光均
张留彬
栗学彬
齐治虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN PROVINCIAL DRILLING ENGINEERING TECHNOLOGY RESEARCH CENTER
HENAN YUZHONG GEOLOGICAL PROSPECTING ENGINEERING Co Ltd
Original Assignee
HENAN PROVINCIAL DRILLING ENGINEERING TECHNOLOGY RESEARCH CENTER
HENAN YUZHONG GEOLOGICAL PROSPECTING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN PROVINCIAL DRILLING ENGINEERING TECHNOLOGY RESEARCH CENTER, HENAN YUZHONG GEOLOGICAL PROSPECTING ENGINEERING Co Ltd filed Critical HENAN PROVINCIAL DRILLING ENGINEERING TECHNOLOGY RESEARCH CENTER
Priority to CN 201220670104 priority Critical patent/CN202963885U/en
Application granted granted Critical
Publication of CN202963885U publication Critical patent/CN202963885U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a sleeve butt joint centering device used for large-diameter sleeve butt joint. The centering device comprises two semi-circular steel rings which are arranged symmetrically. One ends of the two steel rings are hinged, and the other ends of the two steer rings are connected with ear plates. Circular holes are formed in opposite positions of the two ear plates. Hole grooves are formed symmetrically in the two steel rings. At least two adjusting screw holes are respectively formed in the two steel rings on the same periphery face with the hole grooves. Adjacent adjusting screw holes are arranged at equal distance. The sleeve butt joint centering device is simple in design, convenient to operate and low in cost, and sleeve collapse accidents caused by the fact that verticality and concentricity are in inconformity during large-diameter sleeve butt joint are avoided.

Description

Sleeve pipe docking centralizer
Technical field
The utility model relates to a kind of sleeve pipe docking centralizer for the docking of major diameter sleeve pipe.
Background technology
Produce and requirement of engineering for satisfying, major diameter (as diameter 630mm-820mm) engineering well is used widely in fields such as collieries gradually.The casing diameter is large, weight is large owing to entering for the major diameter engineering well, can not adopt screwed connection, needs to adopt welding method to connect.According to engineering practice, there be decentraction and buckling phenomenon to a certain degree in the major diameter bunch tube of welding, its perpendicularity and concentricity can not be guaranteed, and because well exists certain crooked, the borehole wall is not the smooth face of cylinder yet, during setting of casing, bunch tube very easily contacts with borehole wall generating plane, makes the sleeve pipe partial lateral stressed excessive and deform, and then circumferentially unbalance stress causes the casing collapse accident.
The utility model content
The purpose of this utility model is to provide a kind of docking centralizer for large diameter sleeve pipe.
The technical solution adopted in the utility model is as follows:
Sleeve pipe docking centralizer comprises two symmetrically arranged semicircle steel rings, and an end of two steel rings is hinged, and the other end all is connected with an otic placode, and on two otic placodes, symmetric position is provided with circular hole; Go back symmetry on two steel rings and offer hole slot; Also be respectively equipped with at least two with hole slot with side face on two steel rings and adjust screw hole, adjacent adjustment screw hole spaced set.
The upper and lower edge of the center of hole slot and steel ring is equidistant.
On two steel rings, symmetry has four hole slots, each hole slot spaced set.
Described hole slot is oval.
The long axis length of hole slot be the circle that surrounds of two steel rings girth 1/8th, minor axis length is 1/3rd of steel ring height.
One end of two steel rings is hinged by axle sleeve.
Described centralizer is provided with handle.
The utility model centralizer, an end is flexibly connected by axle sleeve, and the other end connects with bolt and nut by the circular hole on otic placode, is convenient to the switch centralizer.The hole slot of offering on steel ring is used for Real Time Observation sleeve pipe docking situation, and the visual field of not only observing is broader, and welds conveniently, more is conducive to guarantee the concentricity of upper and lower sleeve pipe, the uniformity of perpendicularity.Adjust screw hole for interface tube is adjusted, centering to overlapping.Concrete, to adjust screw hole for four and be arranged on hole slot horizontal median axis same level position, adjacent two screw hole center lines are mutually at an angle of 90, and join four groups of bolt+nuts, bolt head is the rounding head, by screw hole and bolt adjustment docking sleeve opening, to guarantee sleeve pipe joint close, concentric; After adjustment is completed, fix with nut.
Described sleeve pipe docking centralizer using method is as follows:
Before sleeve pipe docking, at first two formed cylinders of semicircle steel ring after closure are placed on the mouth of pipe top of trapping, carefully check the centering situation of adjusting the adjustment screw on screw hole, guarantee Real Time Observation sleeve opening in hole slot; After screw centering is completed and is adjusted in the position adjustment of the cylinder cover of two steel ring compositions, pass circular hole on two otic placodes with bolt, two otic placodes are screwed up, the mouth of pipe of the upper sleeve pipe sling is slowly put into down the cylinder cover, the not contact fully of upper and lower sleeve pipe this moment, rig bears most of casing wt.By the position of sleeve opening in the adjustment of adjustment screw, and the docking situation of observing upper and lower sleeve opening by hole slot; After the concentricity of upper and lower sleeve pipe, perpendicularity reach requirement, again put sleeve pipe down, upper and lower sleeve pipe is contacted fully, and finely tune upward sleeve opening position by adjusting screw, complete the centering work of upper and lower sleeve pipe.Guaranteeing mouth of pipe joint close, after drive pipes concentricity, perpendicularity reached requirement, the adjustment screw with nut fixed adjustment screw hole was symmetrically welded the cover interface tube simultaneously by hole slot, after firm welding, takes off centralizer, and the sleeve pipe remainder is welded.
The utility model sleeve pipe docking centralizer can be used for mine gas pump-drainage well, grouting for water blocking well, defeated nitrogen fire extinguishing well, send the sleeve pipe docking of ice cooling well, draining ventilation shaft, mine escape well.
The utility model has following advantage with respect to prior art:
This new casing docking centralizer simplicity of design, easy to operate, with low cost, the casing collapse accident that has produced because perpendicularity and concentricity are inconsistent when having solved major diameter sleeve pipe butt welding.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of centralizer in Fig. 1.
The specific embodiment
Below with specific embodiment, the technical solution of the utility model is described, but protection domain of the present utility model is not limited to this:
Embodiment 1
As shown in Figure 1, 2, sleeve pipe docking centralizer comprises that two symmetrically arranged semicircle steel rings 1,2, two steel rings 1, an end of 2 are flexibly connected by axle sleeve 3, and the other end all is connected with an otic placode 5,4, and on otic placode 4,5, symmetric position is provided with circular hole 6; On two steel rings 1,2 also symmetry offer oval hole slot 8, the upper and lower edge of the center of hole slot 8 and steel ring is equidistant, the long axis length of hole slot 8 be the circle that surrounds of two steel rings girth 1/8th, minor axis length is 1/3rd of steel ring height; The number of hole slot 8 is 4, adjacent hole slot 8 spaced sets; Also be respectively equipped with two on two steel rings and adjust screw hole 7, adjacent adjustment screw hole 7 spaced sets.
During work, before the sleeve pipe docking, at first two after closure semicircle steel rings 1,2 formed cylinders are placed on above the mouth of pipe of trapping, carefully check the centering situation of the adjustment screw on each adjustment screw hole 7, guarantee at the interior Real Time Observation sleeve opening of each oval hole slot 8; After screw centering is completed and is adjusted in the position adjustment of cylinder cover, pass circular hole 6 on otic placode 4,5 with screw, otic placode 4,5 is screwed up, the upper sleeve pipe end opening of slinging is slowly put into down the cylinder cover, the not contact fully of upper and lower sleeve pipe this moment, rig bears most of casing wt.By the position of sleeve opening in the adjustment of adjustment screw, and pass through the docking situation that each oval hole slot 8 is observed upper and lower sleeve openings; After the concentricity of upper and lower sleeve pipe, perpendicularity reach requirement, again put sleeve pipe down, upper and lower sleeve pipe is contacted fully, and finely tune upward sleeve opening position by adjusting screw, complete the centering work of upper and lower sleeve pipe.Guaranteeing mouth of pipe joint close, after drive pipes concentricity, perpendicularity reach requirement, with the adjustment screw on nut fixed adjustment screw hole 7, be symmetrically welded simultaneously the cover interface tube by hole slot 8, after firm welding, take off the cylinder cover, upper and lower sleeve pipe remainder is welded.
Above-described embodiment be the utility model preferred embodiment; but embodiment of the present utility model is not restricted to the described embodiments; other any do not deviate from the substitute mode that change that the utility model does all should be equivalence; within being included in protection domain of the present utility model, as setting up handle so that use etc. on centralizer.

Claims (7)

1. sleeve pipe docking centralizer, is characterized in that, comprise two symmetrically arranged semicircle steel rings, an end of two steel rings is hinged, and the other end all is connected with an otic placode, and on two otic placodes, symmetric position is provided with circular hole; Go back symmetry on two steel rings and offer hole slot; Also be respectively equipped with at least two with hole slot with side face on two steel rings and adjust screw hole, adjacent adjustment screw hole spaced set.
2. sleeve pipe docking centralizer as claimed in claim 1, is characterized in that, the upper and lower edge of the center of hole slot and steel ring is equidistant.
3. sleeve pipe docking centralizer as claimed in claim 2, is characterized in that, on two steel rings, symmetry has four hole slots, adjacent hole slot spaced set.
4. sleeve pipe docking centralizer as claimed in claim 3, is characterized in that, described hole slot is oval.
5. sleeve pipe as claimed in claim 4 docking centralizer, is characterized in that, the long axis length of hole slot be the circle that surrounds of two steel rings girth 1/8th, minor axis length is 1/3rd of steel ring height.
6. described sleeve pipe docking centralizer as arbitrary in claim 1-5, is characterized in that, an end of two steel rings is hinged by axle sleeve.
7. sleeve pipe docking centralizer as claimed in claim 6, is characterized in that, described centralizer is provided with handle.
CN 201220670104 2012-12-07 2012-12-07 Sleeve butt joint centering device Expired - Fee Related CN202963885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220670104 CN202963885U (en) 2012-12-07 2012-12-07 Sleeve butt joint centering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220670104 CN202963885U (en) 2012-12-07 2012-12-07 Sleeve butt joint centering device

Publications (1)

Publication Number Publication Date
CN202963885U true CN202963885U (en) 2013-06-05

Family

ID=48505015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220670104 Expired - Fee Related CN202963885U (en) 2012-12-07 2012-12-07 Sleeve butt joint centering device

Country Status (1)

Country Link
CN (1) CN202963885U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111438428A (en) * 2020-04-13 2020-07-24 中国一冶集团有限公司 Rapid assembling and welding method for large-diameter steel pipeline
CN113927113A (en) * 2021-09-23 2022-01-14 贵州永红航空机械有限责任公司 Brazing filler metal for brazing closed impeller and brazing assembly method
CN114346367A (en) * 2021-12-28 2022-04-15 中国原子能科学研究院 Welding method for upper group pipe and lower group pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111438428A (en) * 2020-04-13 2020-07-24 中国一冶集团有限公司 Rapid assembling and welding method for large-diameter steel pipeline
CN113927113A (en) * 2021-09-23 2022-01-14 贵州永红航空机械有限责任公司 Brazing filler metal for brazing closed impeller and brazing assembly method
CN114346367A (en) * 2021-12-28 2022-04-15 中国原子能科学研究院 Welding method for upper group pipe and lower group pipe

Similar Documents

Publication Publication Date Title
CN202963885U (en) Sleeve butt joint centering device
CN204608980U (en) A kind of hinged four-bladed vane for steel pipe foot joint
CN105239571B (en) Tree root shape electric pole lateral conductor fixator
CN204514516U (en) A kind of device for monitoring dam foundation stress
CN204298858U (en) A kind of precast concrete trench cover lifting device
CN203700940U (en) Device for conveniently installing external prestressed cable
CN203546730U (en) Adjustable mechanical screw rod steel shotcrete device
CN203559619U (en) Taper type electric pole lifting frame
CN206128107U (en) Crab -bolt subassembly
CN206903343U (en) A kind of steel tower steel pipe adapter flange connection node device
CN210007289U (en) Support frame suitable for electric power capital construction job site interim cable supports
CN204492327U (en) A kind of Assembled safety enclosing railings
CN207044090U (en) A kind of alignment pin quick extracting device
CN206724095U (en) The draw bail of street lamp post and pedestal
CN204287241U (en) 6-10KV lightning arrester site test support
CN207934434U (en) Steel pipe flange disk turnover type connects wall drawknot device
CN201953137U (en) Vertical assembly alignment device on construction site of sectional tower equipment
CN203054049U (en) Connector used for electroscope
CN206784451U (en) It is a kind of to be used to anti-gush blowout water installations in anchor pole pore forming process
CN204754185U (en) Fastener is connected to steel pipe
CN205975362U (en) Steel sleeve auxiliary positioning device
CN205748751U (en) A kind of steel pipe feet hand lever load-bearing monitor device
CN204754175U (en) Construction is with simply climbing a support
CN210164225U (en) Hydraulic engineering scaffold connecting device
CN204662812U (en) A kind of guard rail universal adaptor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20131207