CN210164225U - Hydraulic engineering scaffold connecting device - Google Patents
Hydraulic engineering scaffold connecting device Download PDFInfo
- Publication number
- CN210164225U CN210164225U CN201920685027.7U CN201920685027U CN210164225U CN 210164225 U CN210164225 U CN 210164225U CN 201920685027 U CN201920685027 U CN 201920685027U CN 210164225 U CN210164225 U CN 210164225U
- Authority
- CN
- China
- Prior art keywords
- rod
- welded
- hydraulic engineering
- welding
- disc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Abstract
The utility model provides a hydraulic engineering scaffold puts up connecting device belongs to hydraulic engineering equipment technical field, including disc, montant, joint piece, first bolt, horizontal pole, embedding pole and cup joint the device, the upper and lower surface central authorities of disc all weld and are provided with the montant, cup joint all around the outside surface of disc has four joint pieces, and joint piece upper surface runs through and is provided with first bolt, and one side welding that the disc was kept away from to the joint piece is provided with the horizontal pole, and one side welding that the joint piece was kept away from to the horizontal pole is provided with the embedding pole. When the device is installed, the scaffold tubes are only needed to be sleeved on the scaffold tubes, and the scaffold tubes are installed in all directions, namely all directions, left and right, and up and down, so that the installation is more convenient and rapid.
Description
Technical Field
The utility model relates to a hydraulic engineering equipment technical field specifically is a hydraulic engineering scaffold puts up connecting device.
Background
The hydraulic engineering scaffold refers to various supports erected for workers to operate and solve vertical and horizontal transportation on a construction site, is mainly used in the places of interior decoration of dams and buildings or direct construction of high-rise buildings by a higher method, and is a scaffold connecting device in the market at present for the purposes of up-down dry work of constructors, maintenance of peripheral safety nets, high-altitude installation of components and the like, and is complex to operate, complex to install and disassemble and poor in stability.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that above-mentioned background art exists, provide a hydraulic engineering scaffold connecting device, the device when the installation, only need with scaffold pipe cup joint in scaffold pipe can, to six directions all around install scaffold pipe from top to bottom for install more convenient and fast.
In order to achieve the purpose, the utility model provides the following technical scheme, a hydraulic engineering scaffold connecting device comprises a disc, a vertical rod, clamping blocks, a first bolt, a horizontal rod, an embedding rod and a sleeving device, wherein the vertical rod is welded in the center of the upper surface and the lower surface of the disc, four clamping blocks are sleeved around the outer surface of the disc, the first bolt penetrates through the upper surface of each clamping block, the horizontal rod is welded on one side of each clamping block, which is far away from the disc, the embedding rod is welded on one side of the horizontal rod, which is far away from the clamping blocks, and the sleeving device is sleeved on the embedding rod;
cup joint the device including welding rod, left semicircle buckle, right semicircle buckle, welding piece, second bolt, cover and connect ring and locating lever, the upper surface right side of welding rod cup joints and is provided with a plurality of cover and connects the ring, the welding of cover ring top is provided with left semicircle buckle and right semicircle buckle, left side semicircle buckle and right semicircle buckle top all weld and are provided with the welding piece, welding piece central authorities run through and are provided with the second bolt, the right-hand member surface welding of welding rod is provided with the locating lever.
In a further preferred scheme, the center of one side of the vertical rod, which is far away from the disc, is also welded with an embedded rod.
In a further preferred embodiment, the right side of the welding rod is welded to the surface of the vertical rod and the surface of the cross rod.
In a further preferred embodiment, the number of the socket rings is 4, two of the socket rings are welded to the left semicircular buckle, and two of the socket rings are welded to the right semicircular buckle.
In a further preferred scheme, the diameter of the vertical rods and the diameter of the cross rods are the same, and the diameters of the vertical rods and the cross rods are the same as the diameter of the outer side of the scaffold tube.
In a further preferred embodiment, the angle formed by each two cross bars is 90 °.
In a further preferred embodiment, the diameter of the embedded rod is the same as the inside diameter of the scaffold tube, and the embedded rod can be embedded in the scaffold tube.
Has the advantages that:
(1) the device is through being provided with the embedding pole, through being provided with the montant in disc central authorities, be provided with four horizontal poles around the disc, and the angle that becomes between the horizontal pole is 90, all welds on horizontal pole and the montant and is provided with the montant, the montant can imbed in scaffold frame intraductally, make when the installation, only need with scaffold frame pipe cup joint on scaffold frame pipe can, to all around, six directions from top to bottom install scaffold frame pipe, make the installation convenient and fast more.
(2) The device cup joints the device through being provided with, is provided with through welding on horizontal pole and montant and cup joints the device for after scaffold pipe cup joints on the embedding pole, through will cup joint the left semicircle buckle on the device and cup joint on scaffold pipe with right semicircle buckle, screw up the second bolt again, make the stable safety more of connection of scaffold pipe, and scaffold inside and outside pipe atress, make the junction non-deformable of scaffold pipe impaired, make things convenient for the secondary to use.
(3) The device is provided with the locating lever through being provided with the locating lever through welding on the welding pole and makes the ring that cup joints can not follow the roll-off on the welding pole.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the structure of the sleeving device of the present invention.
Fig. 3 is a schematic view of the bottom structure of the sleeving device of the present invention.
Fig. 4 is an enlarged schematic structural diagram of fig. 3A of the present invention.
In FIGS. 1-4: 1-disc, 2-vertical rod, 3-clamping block, 4-first bolt, 5-horizontal rod, 6-embedding rod, 7-socket device, 701-welding rod, 702-left semicircle buckle, 703-right semicircle buckle, 704-connecting block, 705-second bolt, 706-socket ring and 707-positioning rod.
Detailed Description
Example (b):
please refer to fig. 1 to 4, an embodiment of the present invention provides a hydraulic engineering scaffold connecting device, including a disc 1, a vertical rod 2, a clamping block 3, a first bolt 4, a horizontal rod 5, an embedding rod 6 and a sleeving device 7, wherein the vertical rod 2 is welded in the center of the upper and lower surfaces of the disc 1, four clamping blocks 3 are sleeved around the outer surface of the disc 1, the first bolt 4 is arranged on the upper surface of the clamping block 3 in a penetrating manner, the horizontal rod 5 is welded on one side of the clamping block 3 away from the disc, the embedding rod 6 is welded on one side of the horizontal rod 5 away from the clamping block 3, and the sleeving device 7 is sleeved on the embedding rod 6; the device that cup joints is including welding pole 701, left semicircle buckle 702, right semicircle buckle 703, welding block 704, second bolt 705, cup joint ring 706 and locating lever 707, the upper surface right side of welding pole 701 cup joints and is provided with a plurality of cup joints ring 706, the welding of cup joint ring 706 top is provided with left semicircle buckle 702 and right semicircle buckle 703, left semicircle buckle 702 and right semicircle buckle 703 top all welds and is provided with welding block 704, welding block 704 central authorities run through and are provided with second bolt 705, the right-hand member surface welding of welding pole 701 is provided with locating lever 707.
Further, the central part of one side of the vertical rod 2, which is far away from the disc 1, is also welded with an embedded rod 6, so that the embedded rods 6 are also arranged above and below the connecting device, and the scaffold tubes above and below the connecting device can be conveniently installed.
Further, the right side of welding rod 701 welds in the surface of montant 2 and the surface of horizontal pole 5 for cup joint device 7 is fixed in on montant 2 and horizontal pole 5.
Further, the socket ring 706 is provided with 4, and two are welded on the left semicircular buckle 702 and two are welded on the right semicircular buckle 703, so that the left semicircular buckle 702 and the right semicircular buckle 703 can rotate along the welding rod 701.
Furthermore, the diameter of the vertical rod 2 is the same as that of the cross rod 5, and the diameter of the vertical rod is the same as that of the outer side of the scaffold tube.
Furthermore, the angle formed by every two cross rods 5 is 90 degrees, so that the embedded rods 6 are positioned in the front, back, left and right directions of the disc 1, and the scaffold tubes can be conveniently installed in the front, back, left and right directions.
Further, the diameter of the embedding rod 6 is the same as the diameter of the inner side of the scaffold tube, the embedding rod 6 can be embedded into the scaffold tube, and embedded connection is more convenient and rapid.
Use the utility model relates to a hydraulic engineering scaffold connecting device, at first put the device in the place that needs the installation scaffold, second bolt 705 on device 7 will be cup jointed is twisted out, make left semicircle buckle 702 and right semicircle buckle 703 rotatory along welding rod 701, thereby make left semicircle buckle 702 and right semicircle buckle 703 be in the one side of keeping away from embedding pole 6, make embedding pole 6 not run through in left semicircle buckle 702 and right semicircle buckle 703, can be in six direction installation scaffold pipes from top to bottom all around cup jointing the device on embedding pole 6 on montant 2 and the embedding pole 6 on horizontal pole 5 through cup jointing scaffold pipe, then cup joint left semicircle buckle 702 and right semicircle buckle 703 in scaffold pipe surface, it can tightly to screw up second bolt 705 make left semicircle buckle 702 and right semicircle buckle 703 tightly overlap on scaffold pipe.
Claims (7)
1. The utility model provides a hydraulic engineering scaffold puts up connecting device, includes disc (1), montant (2), joint piece (3), first bolt (4), horizontal pole (5), embedding pole (6) and cup joints device (7), its characterized in that: a vertical rod (2) is welded in the centers of the upper surface and the lower surface of the disc (1), four clamping blocks (3) are sleeved on the periphery of the outer side surface of the disc (1), a first bolt (4) penetrates through the upper surfaces of the clamping blocks (3), a cross rod (5) is welded on one side, away from the disc, of each clamping block (3), an embedded rod (6) is welded on one side, away from the clamping blocks (3), of each cross rod (5), and a sleeving device (7) is sleeved on each embedded rod (6);
the sleeving device comprises a welding rod (701), a left semicircular buckle (702), a right semicircular buckle (703), a welding block (704), a second bolt (705), a sleeving ring (706) and a positioning rod (707), wherein the right side of the upper surface of the welding rod (701) is sleeved with a plurality of sleeving rings (706), the upper side of each sleeving ring (706) is welded with the left semicircular buckle (702) and the right semicircular buckle (703), the welding block (704) is welded above the left semicircular buckle (702) and the right semicircular buckle (703), the second bolt (705) is arranged in the center of the welding block (704) in a penetrating mode, and the positioning rod (707) is arranged on the surface of the right end of the welding rod (701) in a welding mode.
2. The hydraulic engineering scaffold connection device of claim 1, wherein: the central part of one side of the vertical rod (2) far away from the disc (1) is also welded with an embedded rod (6).
3. The hydraulic engineering scaffold connection device of claim 1, wherein: the right side of the welding rod (701) is welded on the surface of the vertical rod (2) and the surface of the cross rod (5).
4. The hydraulic engineering scaffold connection device of claim 1, wherein: the splicing ring (706) is provided with 4, two splicing rings are welded on the left semicircular buckle (702), and two splicing rings are welded on the right semicircular buckle (703).
5. The hydraulic engineering scaffold connection device of claim 1, wherein: the diameter of the vertical rod (2) is the same as that of the cross rod (5), and the diameter of the vertical rod is the same as that of the outer side of the scaffold tube.
6. The hydraulic engineering scaffold connection device of claim 1, wherein: the angle formed by every two transverse rods (5) is 90 degrees.
7. The hydraulic engineering scaffold connection device of claim 1, wherein: the diameter of the embedding rod (6) is the same as the diameter of the inner side of the scaffold tube, and the embedding rod (6) can be embedded into the scaffold tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920685027.7U CN210164225U (en) | 2019-05-14 | 2019-05-14 | Hydraulic engineering scaffold connecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920685027.7U CN210164225U (en) | 2019-05-14 | 2019-05-14 | Hydraulic engineering scaffold connecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210164225U true CN210164225U (en) | 2020-03-20 |
Family
ID=69792010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920685027.7U Withdrawn - After Issue CN210164225U (en) | 2019-05-14 | 2019-05-14 | Hydraulic engineering scaffold connecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210164225U (en) |
-
2019
- 2019-05-14 CN CN201920685027.7U patent/CN210164225U/en not_active Withdrawn - After Issue
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204212399U (en) | Flip-shell is to clasp | |
CN210164225U (en) | Hydraulic engineering scaffold connecting device | |
CN108060295A (en) | A kind of petrochemical pipe is heat-treated clamping device | |
CN204608980U (en) | A kind of hinged four-bladed vane for steel pipe foot joint | |
CN106239020A (en) | A kind of novel pipe fitting welder | |
CN104372928A (en) | Cantilever type scaffold assembly | |
CN209976009U (en) | Steel structure connecting piece for building | |
CN202209046U (en) | Wall connecting rod for external scaffold | |
CN104452715A (en) | Special operation platform suitable for single pile offshore construction | |
CN104652799A (en) | Metal frame device | |
CN111005454A (en) | Flue gas purification room net rack block hoisting construction method | |
CN207211705U (en) | Means for fastening scaffolding | |
CN206987392U (en) | A kind of vertical pump line props up attached fixing device | |
CN206237081U (en) | A kind of self-supporting cable tunnel frame with telescopic joint | |
CN210888048U (en) | Sleeve pipe support module for building | |
CN209443577U (en) | A kind of steel structure member | |
CN204449614U (en) | A kind of suspension type siphon drainage transverse tube welding correcting bracket | |
CN210378248U (en) | Spliced LED display screen | |
CN210888030U (en) | Scaffold device is used in industry and civilian building engineering construction | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN208718346U (en) | Building engineering outer scaffold wall connector | |
CN203514287U (en) | Special operating platform suitable for independent pile offshore construction | |
CN208430637U (en) | Device for two sections of vertical steel pipe column connection positioning | |
CN204163365U (en) | A kind of overhanging scaffold assembly | |
CN206418409U (en) | Assembled steel pipe holder for cast-in-place concrete construction of bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20200320 Effective date of abandoning: 20230828 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20200320 Effective date of abandoning: 20230828 |