CN202953928U - Overall assembling platform of glass kiln large arch - Google Patents

Overall assembling platform of glass kiln large arch Download PDF

Info

Publication number
CN202953928U
CN202953928U CN 201220625880 CN201220625880U CN202953928U CN 202953928 U CN202953928 U CN 202953928U CN 201220625880 CN201220625880 CN 201220625880 CN 201220625880 U CN201220625880 U CN 201220625880U CN 202953928 U CN202953928 U CN 202953928U
Authority
CN
China
Prior art keywords
arch
glass kiln
support
large arch
assembling platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220625880
Other languages
Chinese (zh)
Inventor
郭勇
魏晓敏
周新套
司福涛
王兆祥
吕金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU DONGFANG ANCAI REFRACTORY CO Ltd
Original Assignee
ZHENGZHOU DONGFANG ANCAI REFRACTORY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU DONGFANG ANCAI REFRACTORY CO Ltd filed Critical ZHENGZHOU DONGFANG ANCAI REFRACTORY CO Ltd
Priority to CN 201220625880 priority Critical patent/CN202953928U/en
Application granted granted Critical
Publication of CN202953928U publication Critical patent/CN202953928U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an overall assembling platform of a glass kiln large arch. The overall assembling platform of the glass kiln large arch comprises a support provided with a steel structure arch center with an arc-shaped cross section, and two sides of the support are respectively provided with a set of arch foot jacking adjusting devices arranged oppositely. Each arch foot jacking adjusting device comprises a fixing beam and a baffle with an L-shaped cross section, the baffles are arranged on the support, each fixing beam is in threaded connection with an adjusting bolt firmly abutted against the outer side of each baffle, and a hanging ring is arranged on the top portion of each fixing beam. According to the overall assembling platform of the glass kiln large arch, two sets of arch foot jacking adjusting devices are installed, and pre-assembly of all kinds of glass kiln large arch can be achieved according to the steel structure arch center between the two sets of arch foot jacking adjusting devices. The overall assembling platform of the glass kiln large arch is reasonable in design, simple in structure, easy to manufacture, low in cost and convenient to operate, and fully improves work efficiency and assembling precision.

Description

The large arch overall package of a kind of glass furnace platform
Technical field
The utility model belongs to the refractory materials production technical field, relates in particular to the large arch overall package of a kind of glass furnace platform.
Background technology
The large arch of glass furnace is a position very important in furnace construction.The large arch overall package of glass kiln platform is not yet arranged at present, its assembling and fixing whole dependence equipment hold out against the arch pin brick of both sides, reach arch roof construction assembling, fixing purpose, therefore the size of the large arch brick on arch top particularly seems important, meeting under the prerequisite of overall dimensions, squeeze between the adjacent bricks material distributes and must rationally, drop to prevent the brick material.Adopt above-mentioned assembling mode, not easy to operate, production efficiency is low, the precision of the large arch that is assembled into is poor, can not meet the growing requirement of refractory materials production industry.
The utility model content
The utility model is in order to solve weak point of the prior art, and a kind of convenient operation, production efficiency is high, assembly precision the is high large arch overall package of glass furnace platform are provided.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: the large arch overall package of a kind of glass furnace platform, comprise support, support is provided with the steel construction arch tire that cross section is arch, and the support both sides are respectively equipped with a set of arch pin be oppositely arranged and hold out against setting device.
Described arch pin holds out against setting device and comprises that a fixed beam and cross section are the baffle plate of L-type, and baffle plate is arranged on support, on a fixed beam, is threaded and holds out against the adjustment bolt in the baffle plate outside.
Described every fixed beam top is equipped with suspension ring.
Adopt technique scheme, during assembling, first the arch pin brick of both sides is placed on the baffle plate of L-type, according to brick material size, the large arch brick of monocycle is placed into successively again on the steel construction arch tire of arch, (the Length Ratio brick material of steel construction arch tire is slightly short, only can assemble the large arch brick of a ring), then by adjusting bolt, monocycle brick material is fixed, then steel construction arch tire is moved to next ring position of baffle plate, assembling respectively encircles large arch brick material successively.After treating all assemblings, steel construction arch tire is extracted out, just can the large arch integral body of kiln is pre-assembled.Suspension ring play and are put into correct position for two fixed beams of slinging and are fixed, with the assembling operation of the large arch of glass furnace that is applicable to different sizes.It is tight that the adjustment bolt can push adjacent arch brick while for being adjusted on steel construction arch tire, laying the arch brick.
The utility model holds out against setting device by making two cover arch pin, then holds out against steel construction arch tire corresponding between setting device according to two cover arch pin, just can realize the pre-assembled of the large arch of various glass furnaces.The utility model is reasonable in design, simple in structure, be easy to manufacture, cost is low, convenient operation, has fully improved working efficiency and assembly precision.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Embodiment
As shown in Figure 1, the large arch overall package of a kind of glass furnace of the present utility model platform, comprise support 1, and support 1 is provided with the steel construction arch tire 2 that cross section is arch, and support 1 both sides are respectively equipped with a set of arch pin be oppositely arranged and hold out against setting device.Support 1 adopts the many joist steel that vertically arrange.
The arch pin holds out against setting device and comprises that a fixed beam 3 and cross section are the baffle plate 4 of L-type, and baffle plate 4 is arranged on support 1, on a fixed beam 3, is threaded and holds out against the adjustment bolt 5 in baffle plate 4 outsides.Every fixed beam 3 tops are equipped with suspension ring 6.
When the utility model is used in work, first the arch pin brick 7 of both sides is placed on the baffle plate 4 of L-type, according to brick material size, the large arch brick 8 of monocycle is placed into successively again on the steel construction arch tire 2 of arch, (the Length Ratio brick material of steel construction arch tire 2 is slightly short, only can assemble the large arch brick 8 of a ring), then by adjusting bolt 5, monocycle brick material is fixed, steel construction arch tire 2 is moved to next ring position of baffle plate 4, assembling respectively encircles large arch brick 8 successively again.After treating all assemblings, steel construction arch tire 2 is extracted out, just can the large arch integral body of kiln is pre-assembled.

Claims (3)

1. the large arch overall package of a glass furnace platform, it is characterized in that: comprise support, support is provided with the steel construction arch tire that cross section is arch, and the support both sides are respectively equipped with a set of arch pin be oppositely arranged and hold out against setting device.
2. the large arch overall package of a kind of glass furnace according to claim 1 platform, it is characterized in that: described arch pin holds out against setting device and comprises that a fixed beam and cross section are the baffle plate of L-type, baffle plate is arranged on support, on a fixed beam, is threaded and holds out against the adjustment bolt in the baffle plate outside.
3. want the large arch overall package of 2 described a kind of glass furnace platform according to right, it is characterized in that: described every fixed beam top is equipped with suspension ring.
CN 201220625880 2012-11-23 2012-11-23 Overall assembling platform of glass kiln large arch Expired - Fee Related CN202953928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220625880 CN202953928U (en) 2012-11-23 2012-11-23 Overall assembling platform of glass kiln large arch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220625880 CN202953928U (en) 2012-11-23 2012-11-23 Overall assembling platform of glass kiln large arch

Publications (1)

Publication Number Publication Date
CN202953928U true CN202953928U (en) 2013-05-29

Family

ID=48459511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220625880 Expired - Fee Related CN202953928U (en) 2012-11-23 2012-11-23 Overall assembling platform of glass kiln large arch

Country Status (1)

Country Link
CN (1) CN202953928U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109970320A (en) * 2019-03-06 2019-07-05 东旭科技集团有限公司 The method for adjusting big arch during furnace heating-up
CN110746091A (en) * 2019-09-29 2020-02-04 彩虹显示器件股份有限公司 Large arch structure capable of preventing glass defect caused by flow of kiln large arch coagulum

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109970320A (en) * 2019-03-06 2019-07-05 东旭科技集团有限公司 The method for adjusting big arch during furnace heating-up
CN110746091A (en) * 2019-09-29 2020-02-04 彩虹显示器件股份有限公司 Large arch structure capable of preventing glass defect caused by flow of kiln large arch coagulum

Similar Documents

Publication Publication Date Title
CN204843369U (en) Steel case roof beam steel structure welding anti -deformation platform device
CN202031470U (en) Movable hook ladder for construction of steel structure
CN202953928U (en) Overall assembling platform of glass kiln large arch
CN202977443U (en) Roof photovoltaic support
CN203889888U (en) Steel plate hoisting clamp
CN202450548U (en) Adjustable support for fundament of construction elevator on basement top plate
CN202467155U (en) Retractable scaffold pedal
CN202544113U (en) Chord member mechanism for steel structural building
CN203426211U (en) Structure component correcting device
CN104652833A (en) Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building
CN202544200U (en) Roof beam mechanism used for steel structure building
CN206300495U (en) Lightweight annular furnace furnace roof
CN204874590U (en) Frame -type storage frame
CN201901521U (en) Special tool for hoisting arch bricks
CN204199438U (en) A kind of bilateral purlin holder
CN203712187U (en) Overturn vehicle for clamping accelerating tube
CN202389937U (en) Automatic erecting machine for refrigerator
CN202671386U (en) Movable steel arch blank for crown brick masonry of total-oxygen glass melting furnace
CN202384699U (en) Suspension supporting device for replacing overhead ground wire
CN205965513U (en) Positioner of denitration catalyst module
CN202204305U (en) Temperature-resisting refractory brick for medium frequency electric furnace
CN202544193U (en) Upper chord member mechanism for structural steel building
CN205224273U (en) It constructs girder construction that links up to do benefit to steel between roof beam
CN205424993U (en) Wear -resisting energy -conserving built -up arch of high strength
CN202542705U (en) Crane beam mechanism for structural steel building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529