CN202947146U - Insulation structure of metallurgical off-gas combustion pipeline - Google Patents

Insulation structure of metallurgical off-gas combustion pipeline Download PDF

Info

Publication number
CN202947146U
CN202947146U CN 201220681230 CN201220681230U CN202947146U CN 202947146 U CN202947146 U CN 202947146U CN 201220681230 CN201220681230 CN 201220681230 CN 201220681230 U CN201220681230 U CN 201220681230U CN 202947146 U CN202947146 U CN 202947146U
Authority
CN
China
Prior art keywords
layer
insulation structure
steel plate
metallurgical
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220681230
Other languages
Chinese (zh)
Inventor
严气概
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI RUIEN ENERGY INVESTMENT CO Ltd
Original Assignee
SHANGHAI RUIEN ENERGY INVESTMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI RUIEN ENERGY INVESTMENT CO Ltd filed Critical SHANGHAI RUIEN ENERGY INVESTMENT CO Ltd
Priority to CN 201220681230 priority Critical patent/CN202947146U/en
Application granted granted Critical
Publication of CN202947146U publication Critical patent/CN202947146U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an insulation structure of a metallurgical off-gas combustion pipeline. The insulation structure is characterized by being of a four-layer structure arranged concentrically; and the outermost layer is a steel plate (1), the innermost layer is a tortoiseshell net (4), and a calcium silicate layer (2) and a high-strength fireproof mullite castable layer (3) are respectively arranged between the outermost layer and the innermost layer from outside to inside. The insulation structure has the advantages of meeting a requirement of conveying the off-gas of nickel-iron pyrometallurgy, reducing the fixed asset investment of enterprises, ensuring safe and reliable service life of equipment and helping stable and safe production of the enterprises. Therefore, the insulation structure is of great significance in the energy conservation and emission reduction and the development of metallurgy industry in China.

Description

Flue gas during smelting combustion pipe insulation construction
Technical field
The utility model relates to a kind of utilidor structure, especially a kind of flue gas during smelting combustion pipe insulation construction.
Background technology
Produce in the pyrometallurgical smelting process of primary nickel take the laterite nickel ore as raw material, can produce a large amount of CO in the calcining reduction process in closed submerged stove, for taking full advantage of the combustion heat energy of CO, flue gas can burn in the mineral hot furnace upper space, and some flue gas is the burning while carrying in flue.Because the burning liberated heat makes flue-gas temperature rise very highly (1400 ° of C), this is a kind of test to flue.
Existing flue generally all adopts refractory brick as liner, and flue is processed as stove, and the drawback that it brings has: long construction period; Volume is large, and Heavy Weight takies large space, increases the investment of bracket basis; Anti-wear performance is not enough, local damage easily occurs; Life-span is short, shuts down and repairs impact production.
The utility model content
The purpose of the present utility model: be intended to propose a kind of both had good thermal insulation property, inner heat-resistant, wear-resistant, possess again the space of saving, reduce cost simultaneously, improve the Novel smelting smoke combustion heat insulation structure of service life of equipment.
This flue gas during smelting combustion pipe insulation construction is characterized in that: its four-layer structure for arranging with one heart, and outermost layer is steel plate, and innermost layer is hexsteel, and above-mentioned is respectively calcium silicates flaggy and the mullite high-strength refractory cast bed of material from outside to inside between two-layer.
The skeleton of described hexsteel is rooted on steel plate.
The flue gas during smelting combustion pipe insulation construction of this four-layer structure that proposes according to above technical scheme has the following advantages:
Hexsteel and the mullite high-strength refractory cast bed of material are incorporated on the smoke combustion pipeline of ferronickel pyrometallurgical smelting, thereby realize good insulation, inner heat-resistant, wear-resistant is saved the space, and reduce cost improves service life of equipment, finally realizes the economic benefit of enterprise.
Description of drawings
Fig. 1 is cross-sectional structure schematic diagram of the present utility model;
Fig. 2 is longitudinal profile structural representation of the present utility model.
In figure: the 1-steel plate; The 2-calcium silicate board; The 3-mullite high-strength refractory cast bed of material; The 4-hexsteel.
The specific embodiment
Further describe the utility model below in conjunction with accompanying drawing.
This flue gas during smelting combustion pipe insulation construction, its structural design is described as follows:
Outermost layer is steel plate 1, and material can be Q235 or SUS304, and it can realize the sealing of flue well, and can outdoor layout, does not need extra protection;
The second layer be calcium silicate board 2 as the heat-insulation material of high temperature, existing certain intensity has again good thermo-insulation properties, it is close to the steel plate inboard, plays a part to support the mullite high-strength refractory cast bed of material.
Pour into a mould the bed of material 3 for the mullite high-strength refractory for the 3rd layer and be attached on calcium silicate board 2, have the characteristics such as wear-resisting, heat insulation, that the life-span long, construction is easy;
Innermost layer is hexsteel 4, directly contacts with flue gas, accepts the radiant heat of smoke combustion, bears the surface erosion of the particle that carries in flue gas.
The skeleton of described hexsteel is rooted on steel plate.
Even but change appears in burning fume operating mode in course of conveying, cause the interior temperature of pipeline the fluctuation up and down of certain procedures to occur, the outermost layer of this structure is steel plate, be directly exposed in air, steel plate provides enough intensity, it can absorb this change well, guarantees the safe operation of pipeline.
The present invention contains the direct completing combustion of flue gas in flue of the combustibles such as CO when having realized the closed mine heat furnace smelting, do not need extra combustion chamber or other combustion equipment; Meanwhile, its reasonable insulation construction has been realized adiabatic, wear-resisting, firm, durable function.
Use through reality and show: this smoke combustion heat insulation structure, met well the requirement that ferronickel pyrometallurgical smelting flue gas is carried, reduce the fixed assets investment of enterprise, guarantee safe and reliable equipment life, help business stability to produce safely, for the energy-saving and emission-reduction of China and the development of smelting industry, very important meaning is arranged.

Claims (2)

1. flue gas during smelting combustion pipe insulation construction, it is characterized in that: its four-layer structure for arranging with one heart, outermost layer is steel plate (1), and innermost layer is hexsteel (4), and above-mentioned is respectively calcium silicates flaggy (2) and the mullite high-strength refractory cast bed of material (3) from outside to inside between two-layer.
2. flue gas during smelting combustion pipe insulation construction as claimed in claim 1, it is characterized in that: the skeleton of described hexsteel (4) is rooted on steel plate (1).
CN 201220681230 2012-12-11 2012-12-11 Insulation structure of metallurgical off-gas combustion pipeline Expired - Fee Related CN202947146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220681230 CN202947146U (en) 2012-12-11 2012-12-11 Insulation structure of metallurgical off-gas combustion pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220681230 CN202947146U (en) 2012-12-11 2012-12-11 Insulation structure of metallurgical off-gas combustion pipeline

Publications (1)

Publication Number Publication Date
CN202947146U true CN202947146U (en) 2013-05-22

Family

ID=48422843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220681230 Expired - Fee Related CN202947146U (en) 2012-12-11 2012-12-11 Insulation structure of metallurgical off-gas combustion pipeline

Country Status (1)

Country Link
CN (1) CN202947146U (en)

Similar Documents

Publication Publication Date Title
CN100595284C (en) Maintaining method for blast furnace
CN206319030U (en) A kind of car converter device of wide end surface DRI
CN108624733B (en) Steel ingot refining waste heat recycling device
CN203068540U (en) High-temperature abrasion-resistant smoke tube thermal insulation structure
CN102374773B (en) Modification method for carbon rotary kiln settling chamber
CN103937959A (en) Low cost and low energy consumption novel method for processing laterite-nickel ore
CN202947146U (en) Insulation structure of metallurgical off-gas combustion pipeline
CN204999927U (en) Wear -resisting sediment copper cooling wall of easily hanging
CN102101780A (en) Tough mullite bricks for warm air ducts
CN201779366U (en) Hot air pipeline for carbon black production equipment by oil furnace method
CN202002462U (en) Settling chamber of carbon rotary kiln
CN204490904U (en) Blast furnace banking structure
CN101693931A (en) Cooling device at tuyere part of blast furnace
CN210426031U (en) Environment-friendly smelting furnace
CN109022660B (en) A kind of heating furnace heating high hydrogen content reducing gas
CN204342820U (en) A kind of resistance to equipment structure of compound of bosh gas index
CN205316988U (en) Combination formula furnace wall of hot stove in long -life ore deposit
CN103063011B (en) Energy-saving environment-friendly high-blast-temperature cupola system equipment
CN201625781U (en) Energy-saving, environment-friendly and stokehole casting furnace
CN202786299U (en) Reduced iron kiln
CN201560206U (en) Heat-resistant hot blast valve for hot-blast furnace
CN108662854B (en) Method for heating alloy by using high-temperature flue gas of converter
CN202082454U (en) Inner heat insulation valve
CN106702068B (en) A kind of vehicle converter device of wide end surface direct reduced iron
CN103438694B (en) Second-time burning heat accumulation hot-blast stove and there is the furnace cupola of second-time burning heat accumulation hot-blast stove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130522

Termination date: 20141211

EXPY Termination of patent right or utility model