CN202937014U - Concrete bracket for pump pipe - Google Patents
Concrete bracket for pump pipe Download PDFInfo
- Publication number
- CN202937014U CN202937014U CN 201220680553 CN201220680553U CN202937014U CN 202937014 U CN202937014 U CN 202937014U CN 201220680553 CN201220680553 CN 201220680553 CN 201220680553 U CN201220680553 U CN 201220680553U CN 202937014 U CN202937014 U CN 202937014U
- Authority
- CN
- China
- Prior art keywords
- support column
- support
- pump pipe
- foot pad
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model relates to a concrete bracket for a pump pipe. The concrete bracket for the pump pipe enables the pump pipe to be moved conveniently in a concrete pouring process, the angle of the pouring of concrete is convenient to adjust, and construction efficiency and safety are improved. The technical scheme is that the concrete bracket for the pump pipe comprises a support column, a support sheet, a first foot pad and handles. The support sheet is arranged at the top end of the support column, the first foot pad is arranged at the bottom end of the support column, the support sheet is of an arc structure matched with the pump pipe, the horizontal cross section of the first foot pad is larger than that of the support column, and the handles are arranged on the support column and below two sides of the support sheet. The support column is provided with more than three support legs with the upper ends fixedly connected with the support column, certain downward intersection angles are formed between the support column and the support legs, and the support legs are distributed along the circumference of the support column.
Description
Technical field
The utility model relates to a kind of concrete pump pipe carrier.
Background technology
In the conventional concrete pouring construction, while building with rotating disk, the pump line of rotating disk front end is to utilize the reinforcing bar stirrup, in the process of mobile pump line, will constantly utilize many people directly to lift respectively pump line and stirrup, efficiency of construction is low, and construction also needs many people to embrace pump line to be poured into a mould, cast angular turn trouble is dangerous high.
Summary of the invention
For above-mentioned prior art, the purpose of this utility model is to provide a kind of concrete pump pipe carrier, moves pump line while facilitating concreting, and the pouring concrete angular adjustment is lighter, improves efficiency of construction and safety.
The purpose of this utility model is achieved through the following technical solutions: a kind of concrete pump pipe carrier, comprise support column, support chip, the first foot pad and handle, described support chip is arranged at the top of support column, described the first foot pad is arranged at the bottom of support column, described support chip is match with pump line circular-arc, the level cross-sectionn of described the first foot pad is greater than the level cross-sectionn of support column, and described handle is arranged on support column and is positioned at the support chip down either side.
Support chip adopts circular-arc design, improves the stability of pump line on carriage; The first foot pad increases the contact area on carriage and ground, and carriage is more firm; The cast angle that handle facilitates workman's movable support bracket and regulates pump line.
The utility model has also carried out following innovation:
Described support column is provided with that upper end is fixedly connected with support column and is certain three above feets of angle downwards with support column, and feet circumferentially distributes along support column.Adopt many feets can further increase the steadiness of carriage.
The lower end of described each feet is provided with second foot pad, and the second foot pad and the first foot pad are positioned at same plane.
Described feet middle part also is provided with a cross bar be fixedly connected with support column, and feet is reinforced, and extends the application life of feet.
Compared to prior art, the utility model has the advantage of: carrier structure with handles, it is convenient that the workman moves pump line, be easy to regulate the cast angle of pump line, it is reliable that pump line is placed on the circular-arc support chip of carriage safety and firmness, and supporting foot structure has further been strengthened the stability of equilibrium of carriage, during use, only needs two workmans to be operated, safety, efficiency is high.
The accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the utility model.
Label declaration: 1, support chip; 2, support column; 3, the first foot pad; 4, handle; 5 feets; 6 cross bars; 7 second foots pad.
The specific embodiment
Below in conjunction with Figure of description and embodiment, the utility model content is elaborated:
As shown be the embodiment schematic diagram of a kind of concrete pump pipe carrier that the utility model provides, it comprises support column 2, support chip 1, the first foot pad 3 and handle 4, described support chip 1 is arranged at the top of support column 2, described the first foot pad 3 is arranged at the bottom of support column 2, described support chip 1 is match with pump line circular-arc, the level cross-sectionn of described the first foot pad 3 is greater than the level cross-sectionn of support column 2, and described handle 4 is arranged on support column 2 and is positioned at support chip 1 down either side.
Described support column 2 is provided with that upper end is fixedly connected with support column 2 and is certain three above feets 5 of angle downwards with support column 2, and feet 5 circumferentially distributes along support column 2.
The lower end of described each feet 5 is provided with second foot pad 7, the second foots pad 7 and the first foot pad 3 is positioned at same plane.
Described feet 5 middle parts also are provided with a cross bar 6 be fixedly connected with support column 2.
Claims (4)
1. a concrete pump pipe carrier, it is characterized in that: comprise support column (2), support chip (1), the first foot pad (3) and handle (4), described support chip (1) is arranged at the top of support column (2), described the first foot pad (3) is arranged at the bottom of support column (2), described support chip (1) is match with pump line circular-arc, the level cross-sectionn of described the first foot pad (3) is greater than the level cross-sectionn of support column (2), and described handle (4) is arranged on support column (2) above and is positioned at support chip (1) down either side.
2. a kind of concrete pump pipe carrier according to claim 1, it is characterized in that: described support column (2) is provided with that upper end is fixedly connected with support column (2) and is certain three above feets (5) of angle downwards with support column (2), and feet (5) circumferentially distributes along support column (2).
3. a kind of concrete pump pipe carrier according to claim 2, it is characterized in that: the lower end of described each feet (5) is provided with second foot pad (7), and the second foot pad (7) is positioned at same plane with the first foot pad (3).
4. a kind of concrete pump pipe carrier according to claim 2, is characterized in that: also be provided with a cross bar (6) be fixedly connected with support column (2) in the middle part of described feet (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220680553 CN202937014U (en) | 2012-12-11 | 2012-12-11 | Concrete bracket for pump pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220680553 CN202937014U (en) | 2012-12-11 | 2012-12-11 | Concrete bracket for pump pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202937014U true CN202937014U (en) | 2013-05-15 |
Family
ID=48321259
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220680553 Expired - Lifetime CN202937014U (en) | 2012-12-11 | 2012-12-11 | Concrete bracket for pump pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202937014U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155543A (en) * | 2015-10-13 | 2015-12-16 | 北京华石纳固科技有限公司 | Distributing machine suitable for rock-filled concrete pouring |
CN114263204A (en) * | 2021-12-22 | 2022-04-01 | 中铁三局集团建筑安装工程有限公司 | Large-thickness continuous seamless casting concrete bottom plate and construction method thereof |
-
2012
- 2012-12-11 CN CN 201220680553 patent/CN202937014U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155543A (en) * | 2015-10-13 | 2015-12-16 | 北京华石纳固科技有限公司 | Distributing machine suitable for rock-filled concrete pouring |
CN114263204A (en) * | 2021-12-22 | 2022-04-01 | 中铁三局集团建筑安装工程有限公司 | Large-thickness continuous seamless casting concrete bottom plate and construction method thereof |
CN114263204B (en) * | 2021-12-22 | 2022-12-13 | 中铁三局集团建筑安装工程有限公司 | Large-thickness continuous seamless casting concrete bottom plate and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202937014U (en) | Concrete bracket for pump pipe | |
CN203579596U (en) | Mounting support of electric equipment | |
CN102943615B (en) | Horizontal-buckling support insulating ladder | |
CN201990372U (en) | Multipurpose movable hanging case | |
CN202571674U (en) | Welding locating device of antenna pole-holding flange plate and reinforcing rib | |
CN206328682U (en) | A kind of highway bridge construction Support bracket | |
CN210887284U (en) | Fixed stay stirrup of pre-buried festival of tower crane foundation | |
CN203383525U (en) | Support for pouring beam slab | |
CN203347110U (en) | Section steel stirrup applied to high-rise building raft foundation construction | |
CN201027363Y (en) | Steel bar split heads for building | |
CN203716111U (en) | Large-thrust arc-gate support | |
CN204826682U (en) | Steel construction uninstallation device | |
CN205116748U (en) | A column base device for steel construction slides | |
CN203213289U (en) | Purline and pull-bar mechanism for steel structure | |
CN203867155U (en) | Steel-structure operation platform | |
CN203238949U (en) | Bracket used for boundary beam framework | |
CN202441042U (en) | Novel steel pipe scaffold | |
CN202324369U (en) | Steel bar positioning clamp for casting plane concrete | |
CN203213283U (en) | Pull bar expansion mechanism for steel structure | |
CN206256712U (en) | A kind of Space Oblique puts the support meanss of tubular steel member | |
CN207295420U (en) | A kind of supporting bridge device | |
CN206795254U (en) | A kind of machining center operating desk | |
CN202544101U (en) | Horizontal roof supporting beam mechanism for structural steel building | |
CN206015510U (en) | Science of bridge building girder is supported | |
CN205063501U (en) | Novel tee pipe tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130515 |