CN202925824U - Dry hanging structure for stone door opening bottom plate - Google Patents

Dry hanging structure for stone door opening bottom plate Download PDF

Info

Publication number
CN202925824U
CN202925824U CN 201220399240 CN201220399240U CN202925824U CN 202925824 U CN202925824 U CN 202925824U CN 201220399240 CN201220399240 CN 201220399240 CN 201220399240 U CN201220399240 U CN 201220399240U CN 202925824 U CN202925824 U CN 202925824U
Authority
CN
China
Prior art keywords
dry hanging
stone material
cladding
corner brace
door opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220399240
Other languages
Chinese (zh)
Inventor
王勇
陈坚
孟凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Suming Decoration Co Ltd
Original Assignee
Suzhou Suming Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Suming Decoration Co Ltd filed Critical Suzhou Suming Decoration Co Ltd
Priority to CN 201220399240 priority Critical patent/CN202925824U/en
Application granted granted Critical
Publication of CN202925824U publication Critical patent/CN202925824U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Securing Of Glass Panes Or The Like (AREA)

Abstract

The utility model discloses a dry hanging structure for a stone door opening bottom plate. The dry hanging structure for the stone door opening bottom plate comprises a basic level keel connected with a main structure and dry hanging pieces connected with the basic level keel, and is characterized in that the dry hanging pieces are L-shaped corner connectors, and a reinforcing rib is arranged on a dorsal part, corresponding to a portion of each dry hanging piece, of a stone bottom plate. The reinforcing ribs and the stone bottom plate are incorporated into an integrated structure to form dry hanging connection points. The thickness of the dry hanging connection points is larger than 30mm, one end of each L-shaped corner connector is fixedly connected with the basic level keel, and the other end of each L-shaped corner connector is an insertion end. A dry hanging groove matched with the insertion end is arranged on a portion of each dry hanging connection point, each insertion end is arranged in the corresponding dry hanging groove and fixed in the dry hanging groove through being coated with AB glue. By means of the dry hanging structure for the stone door opening bottom plate, by arranging the reinforcing ribs on the stone bottom plate to form the dry hanging connection points, the L-shaped corner connectors are matched with the dry hanging grooves in the portions of the dry hanging connection points, the area of the force bearing points is enlarged, the dry hanging firmness is enhanced, and the service life is prolonged.

Description

The dried hanging hang structure of link plate at the bottom of the stone material door opening
Technical field
The utility model relates to a kind of stone material dry suspending structure, is specifically related to the dried hanging hang structure of link plate at the bottom of a kind of stone material door opening.
Background technology
Utilize the native texture of stone material, can change indoor spatial shape, set off certain atmosphere by contrast.The various native textures of stone material are that any ornament materials etc. is incomparable, when stone material is fitted up, as utilizing well the various textures of stone material, can increase many lively decorative effects, and can change the Ocular measure in space.Texture rough or large pattern can make the people feel the narrow and small of the interior space; Texture tiny or little pattern can make the people feel the expansion of the interior space.Therefore, in interior decoration the utilization of stone material more and more extensive, from ground to, metope, can see the trace of stone material.
Yet also have the utilization of part stone material still difficult, as link plate at the bottom of passage stone material door pocket, link plate etc. at the bottom of elevator stone material door pocket is for reaching designing requirement and using safe effect, stone material door opening monoblock base plate is hung is mounted for a difficult point, has also become a serious potential safety hazard.Mainly adopt straight code suspension member to be connected with stone material in present stone material dry suspending structure, then apply the AB glue bond and fix.Although lip-deep decorative effect does not have large difference, in long-time use, perhaps can cause coming off of stone material base plate after vibrations, thereby have great potential safety hazard.In addition, the thickness of stone material generally adopts the material of 25mm, and is cladding as base plate, the too thin cladding installation requirement that can not satisfy base plate of material, the stone material own wt is heavier so on the one hand, and the holding capacity of suspension member and the firmness of AB glue bond have been proposed higher requirement; On the other hand, stone material is limited resources, and the materials thickness of stone material takies too much source material, is unfavorable for the development trend of energy-saving and environmental protection, improves construction cost.
Summary of the invention
The dried hanging hang structure that the utility model purpose is to provide link plate at the bottom of a kind of stone material door opening uses this dried hanging hang structure, effectively improves safety in utilization, increases the service life, and more energy-saving and environmental protection simultaneously, lightweight reduce the taking of rock material resource, and reduce costs.
for achieving the above object, the technical solution adopted in the utility model is: the dried hanging hang structure of link plate at the bottom of a kind of stone material door opening, comprise the basic unit's keel that are connected with agent structure, and the dry hanging article that is connected with described basic unit keel, described dry hanging article is the L-type corner brace or is L-type and the combination of T-shaped corner brace, the stone material base plate dorsal part at corresponding described dry hanging article place is provided with reinforcing rib, this reinforcing rib and the described stone material base plate structure that is integrated, consist of cladding tie point, the thickness of described cladding tie point is greater than 30mm, described L-type corner brace one end is fixedly connected with described basic unit keel, the other end is insertion end, described cladding tie point place is provided with the cladding groove that matches with described insertion end, each described insertion end is arranged in corresponding described cladding groove, and coating AB glue is fixed.
In technique scheme, described basic unit keel are basic unit of the prior art steel frame, dry hanging article and basic unit's keel fixedly mount through bolt, and described reinforcing rib is arranged at the dorsal part of stone material base plate, for stone material base plate cladding provides enough thickness, thereby can satisfy cladding requirement on the one hand, can save material on the other hand, not need monoblock stone material base plate to satisfy the requirement of thickness, reduce costs, reduce the own wt of dry-hang stone, stone material thickness can be selected 18mm~20mm.In the utility model, by at cladding tie point place, cladding groove being set, utilize the L-type angle steel to be inserted in cladding groove, and coordinate AB glue to be fixed, improve cladding firmness.
In technique scheme, described dry hanging article is made of L-type corner brace and T-shaped corner brace, and described L-type corner brace is positioned at the edge of whole described stone material base plate, and described T-shaped corner brace is positioned at the splicing seams place of adjacent described stone material base plate.When the stone material base areas that designs laying is larger, need polylith stone material base plate to be spliced to form, the dry hanging article that uses the L-type corner brace to coordinate with T-shaped corner brace is arranged at T-shaped corner brace the seam crossing of adjacent stone material base plate, the edge of the stone material base plate after the L-type corner brace is completed for whole splicing.
In technique scheme, described reinforcing rib is by consisting of greater than the wide stone material of 50mm back of the body bar, is fixedly connected with through AB glue between stone material back of the body bar and described stone material base plate.Adopt zero material of stone material to make stone material back of the body bar, reduce the input of cost.
In technique scheme, described cladding groove is positioned at the bottom of described cladding tie point vermicelli upwards 1/3 places, and the degree of depth of this cladding groove is greater than 20mm, and width is greater than 4mm.
Because technique scheme is used, the utility model compared with prior art has following advantages:
1. the utility model dry hanging article adopts the L-type angle steel, in cladding junction, local reinforcing rib is set, to satisfy cladding gross thickness, cladding junction arranges the cladding groove that coordinates with dry hanging article, dry hanging article is pegged graft with cladding groove and is coordinated, and fix with AB glue, compare with dried hanging hang structure in the past, the part adds the mounting means of reinforcing rib, the whole requirement of reduction to the stone material base plate thickness, reduce the occupancy of natural resource, more energy-conservation, environmental protection, lightweight, utilize simultaneously dry hanging article and the grafting of cladding groove to coordinate stressed, lifting surface area is large, adding AB glue fixes, fastness is large, avoid occurring displacement, the problem such as come unstuck, increase and use safety factor,
2. adopt L-type and T-shaped angle steel combining form, adapt to and lay the larger design needs of stone material area, the scope of application is wide in range, solves the stone material breakage problem, and does not affect the end vermicelli aesthetic property of seam crossing.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the structural representation of the utility model embodiment two;
Wherein: 1, bolt; 2, basic unit's keel; 3, L-type corner brace; 4, stone material base plate; 5, reinforcing rib; 6, cladding groove; 7, AB glue; 8, T-shaped corner brace; 9, splicing seams.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further described:
embodiment one: shown in Figure 1, the dried hanging hang structure of link plate at the bottom of a kind of stone material door opening, comprise the steel frame basic unit keel 2 that are connected with agent structure, and the dry hanging article that is connected with described basic unit keel 2, described dry hanging article is L-type corner brace 3, stone material base plate 4 dorsal parts at corresponding described dry hanging article place are provided with reinforcing rib 5, this reinforcing rib 5 and described stone material base plate 4 structure that is integrated, consist of cladding tie point, the thickness 35mm of described cladding tie point, described L-type corner brace 3 upper ends are fixedly connected with described basic unit keel 2, the lower end is insertion end, described cladding tie point place is provided with the cladding groove 6 that matches with described insertion end, insertion end is arranged in cladding groove 6, and it is fixing to apply AB glue 7.
In the present embodiment, described stone material base plate 4 thickness 18mm, specification is 600mm * 1500mm, described reinforcing rib 5 is made of the wide stone material of 50mm back of the body bar, is fixedly connected with through AB glue 7 between stone material back of the body bar and described stone material base plate 4.Described cladding groove 6 is positioned at the bottom of described cladding tie point vermicelli upwards 1/3 places, the degree of depth 20mm of this cladding groove, width 4mm.
Embodiment two: shown in Figure 2, the dried hanging hang structure of link plate at the bottom of a kind of stone material door opening, comprise the steel frame basic unit keel 2 that are connected with agent structure, and the dry hanging article that is connected with described basic unit keel 2, described dry hanging article is made of L-type corner brace 3 and T-shaped corner brace 8, described L-type corner brace 3 is positioned at the edge of whole described stone material base plate 4, and described T-shaped corner brace 8 is positioned at splicing seams 9 places of adjacent described stone material base plate 4.Stone material base plate 4 dorsal parts at corresponding described dry hanging article place are provided with stone material back of the body bar reinforcing rib 5, this reinforcing rib 5 is bonding through AB glue 7 with described stone material base plate 4, be integrally formed structure, this place is cladding tie point, the thickness 30mm of described cladding tie point, described L-type corner brace 3 and T-shaped corner brace 8 upper ends are fixedly connected with described basic unit keel 2 bolts 1, the lower end is insertion end, described cladding tie point place is provided with the cladding groove 6 that matches with described insertion end, each described insertion end is arranged in corresponding cladding groove 6, and it is fixing to apply AB glue 7.Described cladding groove 6 is positioned at the bottom of described cladding tie point vermicelli upwards 1/3 places, the degree of depth 20mm of this cladding groove 6, width 4mm.
In the present embodiment, described stone material base plate 4 thickness 20mm, specification is 600mm * 1000mm, design needs polylith stone material base plate 4 to splice, 9 places adopt T-shaped corner brace 8 to connect at splicing seams, the wide 50mm of described reinforcing rib 5, and a reinforcing rib 5 is respectively established in the both sides that are positioned at T-shaped corner brace 8, as shown in Figure 2, being provided with AB glue 7 in dry hanging article and reinforcing rib 5 junctions is fixedly connected with.

Claims (4)

1. the dried hanging hang structure of link plate at the bottom of a stone material door opening, comprise the basic unit's keel that are connected with agent structure, and the dry hanging article that is connected with described basic unit keel, it is characterized in that: described dry hanging article is the L-type corner brace or is L-type and the combination of T-shaped corner brace, the stone material base plate dorsal part at corresponding described dry hanging article place is provided with reinforcing rib, this reinforcing rib and the described stone material base plate structure that is integrated, consist of cladding tie point, the thickness of described cladding tie point is greater than 30mm, described L-type or T-shaped corner brace one end are fixedly connected with described basic unit keel, the other end is insertion end, described cladding tie point place is provided with the cladding groove that matches with described insertion end, each described insertion end is arranged in corresponding described cladding groove, and coating AB glue is fixed.
2. the dried hanging hang structure of link plate at the bottom of stone material door opening according to claim 1, it is characterized in that: described dry hanging article is made of L-type corner brace and T-shaped corner brace, described L-type corner brace is positioned at the edge of whole described stone material base plate, and described T-shaped corner brace is positioned at the splicing seams place of adjacent described stone material base plate.
3. the dried hanging hang structure of link plate at the bottom of stone material door opening according to claim 1 is characterized in that: described reinforcing rib is by consisting of greater than the wide stone material back of the body bar of 50mm, is fixedly connected with through AB glue between stone material back of the body bar and described stone material base plate.
4. the dried hanging hang structure of link plate at the bottom of stone material door opening according to claim 1 is characterized in that: described cladding groove is positioned at the bottom of described cladding tie point vermicelli upwards 1/3 places, and the degree of depth of this cladding groove is greater than 20mm, and width is greater than 4mm.
CN 201220399240 2012-08-14 2012-08-14 Dry hanging structure for stone door opening bottom plate Expired - Lifetime CN202925824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220399240 CN202925824U (en) 2012-08-14 2012-08-14 Dry hanging structure for stone door opening bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220399240 CN202925824U (en) 2012-08-14 2012-08-14 Dry hanging structure for stone door opening bottom plate

Publications (1)

Publication Number Publication Date
CN202925824U true CN202925824U (en) 2013-05-08

Family

ID=48215799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220399240 Expired - Lifetime CN202925824U (en) 2012-08-14 2012-08-14 Dry hanging structure for stone door opening bottom plate

Country Status (1)

Country Link
CN (1) CN202925824U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351416A (en) * 2016-08-30 2017-01-25 江苏嘉洋华联建筑装饰股份有限公司 Dry hanging structure of overhead stone and construction method thereof
CN106760372A (en) * 2017-03-15 2017-05-31 镇江力点锚固有限公司 A kind of stone material dry suspending accessory
CN110409719A (en) * 2019-07-25 2019-11-05 深圳新中式建筑科技有限公司 A kind of pseudo-classic architecture and construction technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351416A (en) * 2016-08-30 2017-01-25 江苏嘉洋华联建筑装饰股份有限公司 Dry hanging structure of overhead stone and construction method thereof
CN106760372A (en) * 2017-03-15 2017-05-31 镇江力点锚固有限公司 A kind of stone material dry suspending accessory
CN110409719A (en) * 2019-07-25 2019-11-05 深圳新中式建筑科技有限公司 A kind of pseudo-classic architecture and construction technology

Similar Documents

Publication Publication Date Title
CN205189204U (en) Mounting structure of furred ceiling panel
CN104179282A (en) Suspended ceiling
CN104018610B (en) Suspended ceiling
CN202925824U (en) Dry hanging structure for stone door opening bottom plate
CN104032914B (en) Suspended ceiling section bar
CN103590566A (en) Stone drying mucilage glue installing structure and installing method
CN105040930A (en) Decorative wall protecting plate
CN204960247U (en) Printing opacity moulding
CN205875593U (en) Two hook plate material wall pendant structures
CN201428225Y (en) Wallboard decoration hanger
CN204326326U (en) Foam glass dry hanging curtain wall
CN206752770U (en) Facade plaque positions keel and its facade integrated system
CN202483125U (en) Fixing structure for decorative material layer
CN204960197U (en) Decorate dado
CN204435617U (en) A kind of stone material back of the body bolt point slot type suspension member
CN203891392U (en) Full-water-based-rock color stone decorative sheet
CN204960696U (en) Hollow glass
CN202099953U (en) Heat insulating, sound insulating and sound absorbing hanger plate structure
CN216641223U (en) Background wall structure for building decoration
CN207016340U (en) A kind of ornamental angle wrapping structure of handrail elevator
CN202099928U (en) Decorative suspended ceiling board
CN205531107U (en) Outer wall decorative board of resistance to shear
CN202284353U (en) Projecting sun-shading line of glass curtain wall
CN107268897A (en) One kind assembling watt
CN204940814U (en) Optimizing structure of a kind of stone decoration lines

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130508