CN202924573U - Reinforcing cage lifting appliance - Google Patents

Reinforcing cage lifting appliance Download PDF

Info

Publication number
CN202924573U
CN202924573U CN 201220302629 CN201220302629U CN202924573U CN 202924573 U CN202924573 U CN 202924573U CN 201220302629 CN201220302629 CN 201220302629 CN 201220302629 U CN201220302629 U CN 201220302629U CN 202924573 U CN202924573 U CN 202924573U
Authority
CN
China
Prior art keywords
reinforcing cage
main muscle
reinforcement cage
welded
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220302629
Other languages
Chinese (zh)
Inventor
闵树梁
刁金昌
李程
丁礼建
魏启平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN 201220302629 priority Critical patent/CN202924573U/en
Application granted granted Critical
Publication of CN202924573U publication Critical patent/CN202924573U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a reinforcing cage lifting appliance comprising master levers, a length regulating lever and a reinforcing cage fixing lever, wherein the master levers and the length regulating lever are connected together through three fixing clamps, a reinforcing cage to be lifted is provided with two opposite main reinforcements, and two main reinforcement clamping pieces are respectively welded and fixed on the tops of the two main reinforcements, respectively clamped into main reinforcement inserting and pulling drums at the front sections of the two sets of master levers and used for rotatably clamping the two main reinforcements. Two locating heads are welded and fixed at the front end of the reinforcing cage fixing lever; the main reinforcement inserting and pulling drums are welded and fixed at the front ends of the master levers; locating rings are welded and fixed at the rear parts of the master levers; and a circular ring is welded and fixed at the tail end of the length regulating lever. By using the reinforcing cage lifting appliance, the problem of material waste caused by the fact that a reinforcing cage hanging bar used in the traditional drilled pile construction can only be used once is solved; and the reinforcing cage lifting appliance is simple and convenient to arrange, high in construction speed, easy for quality control and capable of increasing the drilled pile construction speed.

Description

A kind of steel-reinforcement cage hanger
Technical field
The utility model relates to a kind of hoisting device that can be repeatedly used in the drilled pile reinforcing cage hoisting process.
Background technology
At present, in the drilled pile construction process, in the lifting of steel reinforcement cage and filling concrete process, the general muscle that hangs of two certain-lengths (this length calculates according to concrete actual steel reinforcement cage top absolute altitude and aperture casing absolute altitude) that adopts is welded on steel reinforcement cage top and aperture casing, to play the fixedly effect of steel reinforcement cage.The necessary firm stable of this reinforcing bar is to guarantee the unlikely floating of steel reinforcement cage or sinking in the process of concrete perfusion.Because tradition is hung muscle and need be welded on steel reinforcement cage, after filling concrete finishes, hang muscle and can't take out, caused the waste of hanging the muscle material.
The utility model content
The utility model provides a kind of steel-reinforcement cage hanger, has solved the problem that steel reinforcement cage hanging steel bar in existing drilled pile construction can only use the waste of material that once causes.
The technical scheme that adopts is:
A kind of steel-reinforcement cage hanger, comprise mobile jib, length adjustment bar, steel reinforcement cage fixed link, it is characterized in that described mobile jib and length adjustment bar link together by three geometrical clamps, steel reinforcement cage to be lifted has two relative main muscle, main muscle fastener is arranged at the top of two main muscle solid welding respectively, and two main muscle fasteners snap in respectively two interior also rotations of main muscle plug cylinder of overlapping the mobile jib leading portions and block.The front end solid welding of steel reinforcement cage fixed link has two positioning heads, the front end solid welding of mobile jib has main muscle plug cylinder, and the rear portion solid welding of mobile jib has steady ring, and two positioning heads insert in described main muscle plug cylinder, and clamp two main muscle that lift steel reinforcement cage, the end solid welding of described length adjustment bar has annulus.
The utility model has overcome the problem that steel reinforcement cage hanging steel bar in existing drilled pile construction can only use the waste of material that once causes.Arrange easyly, speed of application is fast, and quality is easily controlled, has improved the speed of drilled pile construction.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the utility model length adjustment bar.
Fig. 3 is the structural representation of the utility model steel reinforcement cage fixed link.
Fig. 4 is the structural representation of the utility model master muscle plug cylinder.
The specific embodiment
A kind of steel-reinforcement cage hanger comprises mobile jib 1, length adjustment bar 2, steel reinforcement cage fixed link 3, and mobile jib 1 links together by three geometrical clamps 4 with length adjustment bar 2, and the total length after connection meets the distance that push up to top, hole casing at the steel reinforcement cage top of calculating gained.The end solid welding of length adjustment bar 2 has annulus, steel reinforcement cage to be lifted has two relative main muscle, main muscle fastener 7 is arranged at the top of two main muscle solid welding respectively, the front end solid welding of mobile jib 1 has main muscle plug cylinder 5, the interior also rotation of main muscle plug cylinder 5 that the rear portion solid welding of mobile jib 1 has 6, two main muscle fasteners 7 of steady ring to snap in respectively mobile jib 1 leading portion is blocked.The front end solid welding of steel reinforcement cage fixed link 3 has two positioning heads 8,, two positioning heads insert in described main muscle plug cylinder 5, and clamp two main muscle of lifting steel reinforcement cage, and the end solid welding of described length adjustment bar has annulus.So far, a whole set of suspender and steel reinforcement cage spelling are completed.Utilize crane, the annulus 9 of the length adjustment of slinging bar 2 is put into steel reinforcement cage and is bored good hole, and passes length adjustment bar 2 annulus with cross-arm, is fixed on casing, can carry out the concrete perfusion operation after fixation.After operation is complete, after concrete initial set, extract steel reinforcement cage fixed link 3, remove steel reinforcement cage master muscle and main muscle plug 5 is connected, suspender can be taken out, treat after cleaning to continue to use next time.

Claims (1)

1. steel-reinforcement cage hanger, comprise mobile jib, the length adjustment bar, the steel reinforcement cage fixed link, it is characterized in that described mobile jib and length adjustment bar have two relative main muscle by three geometrical clamps ¨ steel reinforcement cage to be lifted that links together, main muscle fastener is arranged at the top of two main muscle solid welding respectively, two main muscle fasteners snap in respectively two interior also rotations of main muscle plug cylinder of overlapping the mobile jib leading portions and block, the front end solid welding of steel reinforcement cage fixed link has two positioning heads, the front end solid welding of mobile jib has main muscle plug cylinder, the rear portion solid welding of mobile jib has steady ring, two positioning heads insert in described main muscle plug cylinder, and clamp the lifting steel reinforcement cage two main muscle, the end solid welding of described length adjustment bar has annulus.
CN 201220302629 2012-06-19 2012-06-19 Reinforcing cage lifting appliance Expired - Lifetime CN202924573U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220302629 CN202924573U (en) 2012-06-19 2012-06-19 Reinforcing cage lifting appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220302629 CN202924573U (en) 2012-06-19 2012-06-19 Reinforcing cage lifting appliance

Publications (1)

Publication Number Publication Date
CN202924573U true CN202924573U (en) 2013-05-08

Family

ID=48214556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220302629 Expired - Lifetime CN202924573U (en) 2012-06-19 2012-06-19 Reinforcing cage lifting appliance

Country Status (1)

Country Link
CN (1) CN202924573U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095351A (en) * 2018-10-10 2018-12-28 中建隧道建设有限公司 A kind of recyclable steel reinforcement cage hanging steel bar hanging method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095351A (en) * 2018-10-10 2018-12-28 中建隧道建设有限公司 A kind of recyclable steel reinforcement cage hanging steel bar hanging method

Similar Documents

Publication Publication Date Title
CN202717501U (en) Pile foundation steel reinforcement cage rings
CN202924573U (en) Reinforcing cage lifting appliance
CN205222466U (en) Novel anti -falling lifting hook
CN202530444U (en) Bayonet pin type pile foundation reinforcing cage positioning lock
CN203033638U (en) Lifting device for hoisting slewing support rings of excavator
CN202543935U (en) Pile extracting sleeve
CN203855939U (en) Steel gate
CN202988530U (en) H-shaped steel bar lifting tool
CN202164037U (en) Adjustable plate hook
CN203754232U (en) Simple steel rail lifting tool
CN204297908U (en) Equalizer bar special hanger
CN203582274U (en) Hoisting device for D-type bucket rod supporting seat of excavator
CN202687780U (en) Pipeline hoisting clamp
CN202609835U (en) Counterweight device for crane
CN203568632U (en) Tail rope suspension device for skip bucket
CN201645097U (en) Special clamp for assembly and welding of H-shaped steels
CN204912601U (en) Pile head bar straightening spanner
CN104444767A (en) Special hanging tool for equalizing beam
CN202988533U (en) Hoisting device for hoisting steel ladle cover
CN204022268U (en) Large Precast Members hanging apparatus
CN204173753U (en) Deflection correction Special sling device walked by a kind of novel slab strand
CN204057677U (en) A kind of quick-release suspension hook
CN202766141U (en) Simple and easy cantilever lifting tool
CN202766094U (en) Hoisting clamp for steel reinforcement cage
CN214879590U (en) Clamp for hoisting air brick cup

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130508

CX01 Expiry of patent term