CN202913755U - Tower body of tower - Google Patents

Tower body of tower Download PDF

Info

Publication number
CN202913755U
CN202913755U CN 201220566734 CN201220566734U CN202913755U CN 202913755 U CN202913755 U CN 202913755U CN 201220566734 CN201220566734 CN 201220566734 CN 201220566734 U CN201220566734 U CN 201220566734U CN 202913755 U CN202913755 U CN 202913755U
Authority
CN
China
Prior art keywords
tower
flange
pole
flange plate
stiffening ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220566734
Other languages
Chinese (zh)
Inventor
王月季
李凯
李玉明
徐负沈
王子环
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Century Communication Equipment Manufacturing Co., Ltd.
Original Assignee
HENAN CENTURY COMMUNICATION EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN CENTURY COMMUNICATION EQUIPMENT CO Ltd filed Critical HENAN CENTURY COMMUNICATION EQUIPMENT CO Ltd
Priority to CN 201220566734 priority Critical patent/CN202913755U/en
Application granted granted Critical
Publication of CN202913755U publication Critical patent/CN202913755U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model relates to a tower body of a tower. The tower body of the tower comprises a pole and a flange plate which is arranged on the end portion of the pole. The flange plate is fixed on the end portion of the pole through a reinforcing ring. The reinforcing ring is sleeved on the outer side of the pole. The inner wall of the reinforcing ring is welded with the outer wall of the pole. The outer lateral surface of the reinforcing ring is welded with the flange plate. The traditional way of arranging a reinforcing module between the traditional tower and the flange plate is replaced by the manner of arranging the reinforcing ring between the tower and the flange plate. The contact area of the reinforcing ring, the pole and the flange plate is bigger than that of the reinforcing module, the pole and the flange plate, so that the connective intensity of the flange plate and the pole is bigger. In addition, the welding of the reinforcing ring, the pole and the flange plate is a continuous welding, the phenomenon of stress concentration of the reinforcing module is avoided, so that the stability of the tower body is stronger, and the service life is longer.

Description

A kind of shaft tower body of the tower
Technical field
The utility model belongs to the electric power tower technical field, relates in particular to a kind of good stability, intensity greatly and the shaft tower body of the tower of long service life.
Background technology
Along with China was to the input increasing of power infrastructures in recent years, increasing transmission line of electricity is set up.Shaft tower because of its compare with traditional angle steel tower have specious, floor space is little, cost performance is high, and adopted by vast Construction unit.The tower body of shaft tower adopts more rational sectional type, cooperates connection by the multistage body of the tower with high-strength bolt by the flange on the body of the tower.As depicted in figs. 1 and 2, existing shaft tower body of the tower is comprised of tower bar and the flange 102 that is arranged on tower bar 101 ends, the requirement of strength that satisfies for shaft tower, the boss 103 of equally distributed connection tower bar 101 and flange 102 is set at the outer wall of tower bar 101, because boss 103 shape structures triangular in shape and arranged apart, concentrate with the contact site branch stress of boss 103 at tower bar 101, flange 102, cause the intensity at this position relatively poor, application life is short, be easy to occur damaging, seriously influenced quality and the stability of body of the tower.
Summary of the invention
The purpose of this utility model is in order to overcome the deficiencies in the prior art, and a kind of good stability is provided, intensity is large and the shaft tower body of the tower of long service life.
The purpose of this utility model is achieved in that a kind of shaft tower body of the tower, comprise tower bar and the flange that is arranged on the tower boom end, described flange is fixed on the end of tower bar by stiffening ring, stiffening ring is sleeved on the outside of tower bar, the outer wall welding of the inwall of stiffening ring and tower bar, the lateral surface of stiffening ring and flange welding.
Described stiffening ring is steel loop or steel pipe.
The utlity model has following positive effect: the utility model is improved between shaft tower and the flange stiffening ring is set boss is set between traditional shaft tower and the flange, the contact area of stiffening ring and tower bar and flange is greater than the contact area of boss and tower bar and flange, and then make flange larger with the intensity that the tower bar is connected, in addition, stiffening ring and tower bar and flange be welded as continuous welding, the phenomenon that the stress of having avoided the boss welding to occur is concentrated, and then make the stability of body of the tower stronger, longer service life.
Description of drawings
The main TV structure schematic diagram of the shaft tower body of the tower that Fig. 1 is traditional.
Fig. 2 is the top view structural representation of Fig. 1.
Fig. 3 is the main TV structure schematic diagram of a kind of shaft tower body of the tower of the utility model.
Fig. 4 is the structural representation of Fig. 3.
Among Fig. 1 and Fig. 2: 101, tower bar 102, flange 103, boss.
Among Fig. 3 and Fig. 4: 201, tower bar 202, flange 203, stiffening ring.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further:
Embodiment 1
As shown in Figure 3 and Figure 4, a kind of shaft tower body of the tower, the flange 202 that comprises tower bar 201 and be arranged on tower bar 201 ends, described flange 202 is fixed on the end of tower bar 201 by stiffening ring 203, stiffening ring 203 is sleeved on the outside of tower bar 201, the outer wall welding of the inwall of stiffening ring 203 and tower bar 201, the lateral surface of stiffening ring 203 and flange 202 welding.
The utility model is improved between shaft tower and the flange stiffening ring is set boss is set between traditional shaft tower and the flange, the contact area of stiffening ring and tower bar and flange is greater than the contact area of boss and tower bar and flange, and then make flange larger with the intensity that the tower bar is connected, in addition, stiffening ring and tower bar and flange be welded as continuous welding, the phenomenon that the stress of having avoided the boss welding to occur is concentrated, and then make the stability of body of the tower stronger, longer service life.
Embodiment 2
As shown in Figure 3 and Figure 4, a kind of shaft tower body of the tower, the flange 202 that comprises tower bar 201 and be arranged on tower bar 201 ends, described flange 202 is fixed on the end of tower bar 201 by stiffening ring 203, stiffening ring 203 is sleeved on the outside of tower bar 201, the outer wall welding of the inwall of stiffening ring 203 and tower bar 201, the lateral surface of stiffening ring 203 and flange 202 welding.
Described stiffening ring 203 is steel loop or steel pipe.
The utility model is improved between shaft tower and the flange stiffening ring is set boss is set between traditional shaft tower and the flange, the contact area of stiffening ring and tower bar and flange is greater than the contact area of boss and tower bar and flange, and then make flange larger with the intensity that the tower bar is connected, in addition, stiffening ring and tower bar and flange be welded as continuous welding, the phenomenon that the stress of having avoided the boss welding to occur is concentrated, and then make the stability of body of the tower stronger, longer service life.

Claims (2)

1. shaft tower body of the tower, comprise tower bar and the flange that is arranged on the tower boom end, it is characterized in that: described flange is fixed on the end of tower bar by stiffening ring, stiffening ring is sleeved on the outside of tower bar, the outer wall welding of the inwall of stiffening ring and tower bar, the lateral surface of stiffening ring and flange welding.
2. a kind of shaft tower body of the tower according to claim 1, it is characterized in that: described stiffening ring is steel loop or steel pipe.
CN 201220566734 2012-10-31 2012-10-31 Tower body of tower Expired - Fee Related CN202913755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220566734 CN202913755U (en) 2012-10-31 2012-10-31 Tower body of tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220566734 CN202913755U (en) 2012-10-31 2012-10-31 Tower body of tower

Publications (1)

Publication Number Publication Date
CN202913755U true CN202913755U (en) 2013-05-01

Family

ID=48162077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220566734 Expired - Fee Related CN202913755U (en) 2012-10-31 2012-10-31 Tower body of tower

Country Status (1)

Country Link
CN (1) CN202913755U (en)

Similar Documents

Publication Publication Date Title
CN201964069U (en) Transition node for round and square pipes
CN201763732U (en) Lathedog
CN202913755U (en) Tower body of tower
CN201661107U (en) Tower variable cross-section combined joint
CN201730245U (en) Structure for treating generated additional stress on lower chord in rigid roof truss connection
CN205677342U (en) A kind of cross-arm on electric pole
CN204326677U (en) Novel power transmission power line steel tuble pole
CN203113881U (en) Connecting structure of composite material tubular element and angle iron tower body
CN202148355U (en) Anode guide rod steel claw group
CN202430736U (en) Jacket and wind turbine foundation of wind farm
CN202969583U (en) Connecting structure of pole tower and basic connecting piece
CN202451633U (en) Double-section coupler with cross-axle needle roller bearing
CN204001817U (en) Combined support frame
CN202913756U (en) Connection structure of cross arm and pole tower
CN202790163U (en) Stranding cage
CN203669331U (en) Fixing unloading device of lifting scaffold
CN202000494U (en) Spliced enhancing structure for steel structure
CN202706214U (en) Wall column mechanism for steel roof structure
CN202745454U (en) Steel pipe rod
CN201560055U (en) Connection structure between upper girder and end girder of crane
CN202466832U (en) H profile steel component connecting piece
CN202977071U (en) Connecting structure for pulling plate and web of transformer
CN204645077U (en) The changeover portion of jacket-type marine wind electric field foundation structure
CN202946329U (en) Polygon diagonal bracing connection structure for wind driven generator tower and guide pipe frame foundation
CN202544469U (en) Portal pole tower steel tube fork beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160405

Address after: Private science and Technology Park Weidu District north of Xuchang Henan province 461000 city Henan century communications equipment manufacturing Co. Ltd.

Patentee after: Henan Century Communication Equipment Manufacturing Co., Ltd.

Address before: Private science and Technology Park Weidu District north of Xuchang Henan province 461000 city Henan Century Communication Equipment Co. Ltd.

Patentee before: Henan Century Communication Equipment Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130501

Termination date: 20151031

EXPY Termination of patent right or utility model